HousePrecheckCheck an address

213 Emerson AveToronto · zoning, lot size and permit records

Open space · OR (x28)5.8 × 36.4 m207 m²on Emerson Avebacks onto Ln S Dupont E Emerson

Not a home

A park or open space

The zoning by-law sets this parcel aside for parks and open space. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 22 130626 STE 09 OZ (Official Plan and Zoning By-law Amendment to increase the approved height and density o..., 2022). Larger work can mean noise and trucks next door; read what each one is for.
  • 4 development applications open within 300 m, up to 50 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
N10 m
5.8 m frontage36.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 22 130626 STE 09 OZ (Official Plan and Zoning By-law Amendment to increase the approved height and density o..., 2022).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 50 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • Development application24 253550 STE 09 PLClosed

    Part Lot Control Exemption By-law extension application request for 1245 Dupont Street. By-law 235-2020 was enacted by City Council on February 26, 2020 and expires in February 26, 2025.

    Dec 24, 2024 · 213 EMERSON AVE · City file
  • Development application22 130626 STE 09 OZOMB Appeal

    Official Plan and Zoning By-law Amendment to increase the approved height and density onsite to accomodate additional purpose built and affordable rental dwelling units. On Block 3, Tower 3A increases by 13 storeys and Tower 3B increases by 12 storeys for a total of 48 and 37 storeys, respectively. The proposal increases Block 4, Tower 4A by 12 storeys and Tower 4B by 11 storeys for a total of 44 and 34 storeys, respectively. A total of 3,547 dwelling units across five blocks are proposed, 634 of which are already approved and under construction.

    Apr 5, 2022 · 213 EMERSON AVE · City file
  • Development application20 181703 STE 09 SAClosed

    Proposed 31-storey mixed-use building including a 7-storey base building. A total of 31,444 square metres of residential gross floor area comprised of 427 dwelling units, and 5,521 square metres of non-residential gross floor area are proposed.

    Aug 17, 2020 · 213 EMERSON AVE · City file
  • Development application19 129482 STE 09 SAClosed

    : BLOCK 5: Site Plan Control application: mixed-use building comprising a 9-storey base building and two towers: 25 and 29 storeys.

    Mar 22, 2019 · 213 EMERSON AVE · City file
  • Development application18 152282 STE 18 PLClosed

    Application for exemption from Part-Lot Control related to a comprehensive redevelopment of the property municipally known as 1245 Dupont Street & 1260 Dufferin Street, and commercially known as the Galleria Shopping Centre.

    May 2, 2018 · 213 EMERSON AVE · City file
  • Development application16 231334 STE 18 OZClosed

    The proposal introduces a new street and block configuration containing 5 blocks with a total of 8 towers ranging in height from 19 to 35-storeys. Proposed for the site are 2846 residential units, including 150 affordable housing units.

    Sep 30, 2016 · 213 EMERSON AVE · City file

Check before you build

  • Site-specific exception 900.42.10(28)

    Needs a closer look

    5 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.42.10(28)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Despite regulation 90.5.40.10(1), the height of a building or structure is measured from the Canadian Geodetic Datum elevation of 120.95 metres and the elevation of the highest point of that building or structure

  2. Rule B

    Despite regulation 90.30.40.10(1), the permitted maximum height for a building or structure is 20 metres

  3. Rule C

    Despite regulation 90.30.40.70(1), no minimum front yard setback is required

  4. Rule D

    Despite regulation 90.30.40.70(2)(A), the minimum rear yard setback and side yard setback is 5.0 metres, if a lot abuts a lot in the Residential Zone category or the Residential Apartment Zone category

  5. Rule E

    Despite regulation 200.5.10.1(1), parking spaces are not required for a community centre .

By-law 569-2013, Chapter 900

Lot facts

Area
207 m²
Frontage
5.8 m
Depth
36.4 m
Street
Emerson Ave
Corner lot
No
Public lane
Ln S Dupont E Emerson, 5.6 m along it
Max height
12 m
Max lot coverage
—
  • Zone OR (x28) (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source

Around this lot

Minor variances approved
100%38 of 38 decisions
Garden suite permits
1
Laneway suite permits
13
Multiplex permits
20
Development applications
12

Within 300 m, last 10 years. 34 suite and multiplex permits: more than at 96% of Toronto houses (median 3). 38 variance decisions: more than at 73% of Toronto houses (median 19).

Latest activity nearby

  • Minor variancePending

    To construct a new eight-storey non-residential building (self-storage warehouse) with one level below grade, interior loading facilities and accessory office space. The proposal is subject to Site Plan Control. The applicant has not submitted a Site Plan Control application.

    1278 DUPONT ST · Nov 25, 2026 · 188 m away
  • Zoning review

    Closed

    1220-1226 DUPONT ST · Nov 19, 2026 · 296 m away
  • Building permit

    Proposal for second and third floor alterations.

    811 ST CLARENS AVE · Nov 10, 2026 · 286 m away
  • Building permitmultiplex

    Second & Third Floor Interior Alterations

    815 ST CLARENS AVE · Nov 10, 2026 · 299 m away
  • Building permitmultiplex

    Second & Third Floor Interior Alterations

    813 ST CLARENS AVE · Nov 10, 2026 · 293 m away
  • Zoning review

    Cancelled

    1401 DUPONT ST · Nov 3, 2026 · 262 m away
  • Building permit

    Proposed construction of an addition to create a new unit on the existing second-floor/rooftop level of existing commercial building (boxing gym), including new exterior walls and associated building systems.

    27 PRIMROSE AVE · Oct 19, 2026 · 273 m away
  • Building permit

    Proposal to install backwater valve & sump pump.

    240 EMERSON AVE · Oct 16, 2026 · 106 m away
  • Building permitdemolition

    Proposal to be partially demolished the existing building and an alteration from the interior.

    1245 DUPONT ST · Oct 16, 2026 · 222 m away
  • Building permit

    Proposal for the addition of three (3) magnetic locks.

    1245 DUPONT ST · Oct 9, 2026 · 222 m away

Neighbourhood: Junction-Wallace Emerson

About the area around the lot, not the lot itself.

Nearest station
Lansdowne Station13 min walk
Nearest TTC stop
Dupont St at Emerson Ave2 min walk
Nearest cycling route
Emerson AveBike Lane - Contraflow, 1 min walk
Nearest traffic count
1,649 vehicles in 8 hLappin Ave / Emerson Ave, 100 m away, Oct 20, 2021
Serious collisions within 500 m
52021–2026, killed or seriously injured: 2 fatal, 3 with pedestrians, 1 with cyclists
Parks
Wallace Emerson Park1 min walk
Campbell Avenue Park7 min walk
Chandos Park South8 min walk

Schools within 1 km

  • ST SEBASTIAN CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
  • PAULINE JR PUBLIC SCHOOL English Public 9 min walk
  • DOVERCOURT JR PUBLIC SCHOOL English Public 10 min walk
  • ST MARY OF THE ANGELS CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
  • ST ANTHONY CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
  • ST LUIGI CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureJunction-Wallace EmersonMedian neighbourhood
Median household income (2020)$84,000$84,500
Households that own their home50%54%
Population (2021)23,18016,813
Homes built in 1960 or before40%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleJunction-Wallace EmersonCity median
Assault720636.3
Robbery3669.5
Shootings3.610.5
Auto theft108192.6
Theft over $5,00032.446.1
Break and enter230.4172.8
Theft from vehicles201.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.