HousePrecheckCheck an address

2114 Yonge StYonge-Eglinton, Toronto · City records before you offer

Commercial residential · CR 6.7 (c0.37; r6.34) SS2 (x23)27.1 × 32.1 m761 m²on Hillsdale Ave Wcorner, also on Yonge St

Nothing to check before you offer in the City's records
N20 m
27.1 m frontage32.1 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 2114 Yonge St

2114 Yonge St is on a 27.1 m by 32.1 m lot on Hillsdale Ave W in Yonge-Eglinton. The zoning is CR. A site-specific exception, 900.11.10(23), changes some of the usual rules for this address. The lot also fronts Yonge St.

The City has 15 records on this lot since 1983. That is more than at 99% of Toronto houses. In 2023, a building permit was filed: "Revision 02 - to install fire dampers in make up air system serving public corridor in lieu of previously approved combined fire/smoke dampers". Status: closed. In 2021, a building permit was filed: "Alternative solution for the proposed development at 2114 yonge street, toronto, will be provided with a standpipe system. 65 mm hose connections will be…". Status: approved. In 2019, a building permit was filed: "Proposal to demolish existing building and foundations for future development". Status: closed. Nothing on file is open right now.

Within 300 m, 12 development applications are open (the tallest up to 65 storeys). Eglinton station is a 5-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Site-specific exception 900.11.10(23)Moderate
  • 12 development applications open within 300 mLowFree check
  • Yonge-Eglinton Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Clear

Open City files

How much in the City's records needs answers before an offer

  • No open orders or by-law investigations
  • No permits left open for years
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

City files on this lot

15 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-10-13Building permit
26 253453
1 wall sign + 2 overhanging signs.***GIORGETTI***Cancelled
2026-10-06Building permit
26 250178
1 wall sign + 2 overhanging signs.***GIORGETTI***Cancelled
2026-09-22Building permit
25 270933
Revision - new hvac system.HVAC - Proposal for interior alterations and new mezzanine to existing retail space.Cancelled
2025-11-12Zoning review
25 252891 ZAP
No description on fileClosed
2025-09-09Zoning review
25 222659 ZAP
No description on fileClosed
2023-06-27Building permit
19 224490
Revision 02 - to install fire dampers in make up air system serving public corridor in lieu of previously approved combined fire/smoke dampers.Closed
2022-04-11Zoning review
22 120632 PSP
No description on fileClosed
2021-02-16Building permit
21 116708
Alternative Solution for the proposed development at 2114 Yonge Street, Toronto, will be provided with a standpipe system. 65 mm hose connections will be located within the exit stairs at the main landings, and on the floor areas where the required 33 m hose coverage cannot be achieved with the hose connections in the stairs. Hose stations will not be provided in the floor areas of the building.Approved
2019-06-03Building permit
19 139234
Proposal to demolish existing building and foundations for future development.Closed
2018-01-09Zoning review
18 102705 ZPR
No description on fileClosed
2017-09-26Building permit
17 238911
Proposal to erect and display two non-illuminated ground signs displaying static copy located on the north and east frontages. The proposed signs each contain one sign face each, measuring 3.66 metres vertically by 5.49 metres horizontally.**SAMMY'S SERVICE CENTRE**Cancelled
2012-05-29Building permit
12 170462
permit to install new backflow device in basement of existing automotive repair garage.Closed
1994-03-29Zoning review
94 024701 LTO
No description on fileClosed
1993-11-08Zoning review
93 025773 LTO
No description on fileClosed
1983-05-06Zoning review
83 025859 LTO
No description on fileClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(23)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(23)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Yonge-Eglinton Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(23)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
27.1 m frontage32.1 m deepon Hillsdale Ave W
Zone
CR 6.7 (c0.37; r6.34) SS2 (x23)
Height limit
37.5 m
Corner lot
Yes, also on Yonge St
Public lane
None
House footprint
521 m²
Back yard
0 m
Buildings on the lot
4

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 12 development applications open within 300 m, up to 65 storeys
    • In the Eglinton station area
    • 6 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 12 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime near median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 3 of 6 categories
    • Theft over $5,000: 2.2 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Yonge-Eglinton neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$94,000median $84,500
    Households that own their home37%median 54%
    Population (2021)12,410median 16,813
    Homes built in 1960 or before47%median 29%
    Homes needing major repairs6%median 7%

    Getting around and schools

    • Eglinton StationNearest station5 min walk
    • Yonge St at Manor Rd WestNearest TTC stop1 min walk
    • Lascelles BlvdNearest cycling route6 min walk
    • The Study AcademySchool3 min walk
    • The Study Academy SchoolSchool3 min walk
    • Birmingham International Collegiate of CanadaSchool8 min walk
    • Caesar International AcademySchool8 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3713.8
    • Robberycity median 69.595.2
    • Auto theftcity median 192.6115.6
    • Theft over $5,000city median 46.1102
    • Break and entercity median 172.8136
    • Theft from vehiclescity median 188.154.4

    More about Yonge-Eglinton

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 2114 Yonge St

    Nothing in the City's records needs answers before an offer on 2114 Yonge St

    The report lists the 15 record sets we checked and shows what the City allowed next door. You get it as a PDF for your agent and lawyer, and we watch the address for 90 days.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.