HousePrecheckCheck an address

211 College StToronto · zoning, lot size and permit records

Also 215 College St, 219 College St

Residential · R (f4.5; d1.0) (x835)60.8 × 78.4 m4,650 m²on Beverley Stcorner, also on College St

Not a single house

Several homes on one parcel

3 different civic addresses share this parcel: a townhouse row, a co-op or a complex of homes rather than one house. Build options for a house do not apply to one home here, and the City's records for the parcel may be about any of them.

Looking at a house nearby? What this means for you

  • 3 homes on one parcel of 0.5 haA denser block than the houses around it: more cars and people, often with shared driveways and parking.
  • 2 development applications open within 300 m, up to 31 storeysNew buildings may go up around here in the next years. More change nearby than at 95% of Toronto houses.
  • Major Transit Station Area: Queens ParkThe City plans more homes around the station: good for transit, and more building over time.

Want to check a home here before you buy?

We are building checks for homes in complexes and co-ops. Leave your email and we will tell you when it is ready.

N20 m
60.8 m frontage78.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 24 253171 PRS 00 IR (Property Standards, 2024).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 31 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • By-law investigation24 253171 PRS 00 IRClosed

    Property Standards

    Dec 23, 2024 · 215 COLLEGE ST
  • Building permit22 204015Cancelled

    Proposal for interior alterations for a full renovation to an existing ground floor 2-bdrm dwelling unit (Unit 311) in apartment building #3 to improve accessibility, including more accessible bathroom, kitchen & limit entry to grade only. Change in exiting for Unit 311. Existing exit into shared corridor will be closed in, with the only existing exit remaining directly to the exterior. Minor exterior alterations for a replacement entry door. Fire alarm system work within the unit to adjacent building #2 via underground garage to maintain existing building performance.

    Oct 11, 2022 · 211 COLLEGE ST
  • Building permit21 249392Closed

    INSTALL BACKFLOW PREVENTOR

    Dec 29, 2021 · 215 COLLEGE ST
  • Building permit14 238069Closed

    To replace the (2) exhaust fans in the parking garage and (3)in the locker room in the basement.

    Nov 4, 2014 · 215 COLLEGE ST
  • Building permit08 143158Closed

    Reconstruct existing stair at rear to metal, from GF Parking garage up 1 level to parking deck. 3 tower apartment complex.

    May 13, 2008 · 211 COLLEGE ST
  • Building permit96 013389Closed

    MAKE INTERIOR ALTERATIONS TO BASEMENT TO CREATE ACCESS TO CRAWL SPACES. ALSO MAKE INTERIOR ALTERATIONS TO UNIT 311 ON FIRST FLOOR OF NO. 219 COLLEGE ST. /LM

    Feb 23, 1996 · 211 COLLEGE ST

Check before you build

  • Site-specific exception 900.2.10(835)

    Needs a closer look

    1 site-specific rule and 4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(835)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(4).

  2. Older by-law A

    Section 12(1) 116 of former City of Toronto By-law 438-86

  3. Older by-law B

    Section 12(1) 233 of former City of Toronto By-law 438-86

  4. Older by-law C

    Section 12(2) 256 of former City of Toronto By-law 438-86

  5. Older by-law D

    Section 12(5)(h) of former City of Toronto By-law 438-86

7 parts for other addresses
  • E On or between the even numbered addresses of 40-42 Baldwin St., the odd numbered addresses of 181-201A Beverley St., the odd numbered addresses of 201-203 …
  • F On the lands municipally known as 136 Beverley St. in 1988, Section 12(2) 77 of former City of Toronto By-law 438-86
  • G On 206 Beverley St., former City of Toronto by-law 20-72
  • H On 38 Cecil St., former City of Toronto by-law 699-82
  • I On the even numbered addresses of 30-36 D'Arcy St., former City of Toronto by-law 82-93
  • J On 6 Henry St., former City of Toronto by-law 42-76
  • K On 125 Huron St., former City of Toronto by-law 9420.
By-law 569-2013, Chapter 900

Lot facts

Area
4,650 m²
Frontage
60.8 m
Depth
78.4 m
Street
Beverley St
Corner lot
Yes, also on College St78.4 m along it
Public lane
None
House footprint
565 m²roof up to 16.2 m
Back yard
3.2 mhouse to rear lot line
Side yards
3 m and 5.5 mhouse to side lot lines
Buildings on the lot
6house, garage, sheds
Max height
13 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 533. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Queens Park. The lot is inside the Queens Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 611). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Minimum frontage 4.5 m. Frontage is about 60.8 m: meets the zone minimum. Source
  • Zone R (f4.5; d1.0) (x835) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
100%11 of 11 decisions
Garden suite permits
1
Laneway suite permits
4
Multiplex permits
20
Development applications
10

Within 300 m, last 10 years. 25 suite and multiplex permits: more than at 92% of Toronto houses (median 3). 11 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing rear two-storey detached ancillary building (containing one laneway suite and a two-car garage, abutting the laneway) by constructing a one-storey addition (patio enclosure) on the south side of this building. There is a total of two residential dwelling units on this lot (one unit within the main building and one unit within the ancillary building).

    122 D'ARCY ST · Jul 15, 2026 · 428 m away
  • Minor varianceApproved

    To construct a new two-storey detached ancillary building (containing one garden suite), with a cantilevered second storey in the rear yard. There will be a total of five residential dwelling units on this lot (four units within the main dwelling, and one unit within the ancillary building).

    23 ROSS ST · Apr 1, 2026 · 47 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by converting the existing office space (Unit 1 located within the basement at the southern portion of the building) into medical office space with accessory uses.

    150 BEVERLEY ST · Nov 19, 2025 · 443 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing rear additions on the first and third levels.

    32 E OXFORD ST · Sep 3, 2025 · 423 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition, and a new rear three-storey addition (with a basement walkout level). Also, to construct a rear exterior staircase that will access each level. There will be a total of 4 residential dwelling units on this lot. The existing rear two-storey ancillary building will be maintained and unaltered.

    28 D'ARCY ST · Feb 26, 2025 · 422 m away

Latest activity nearby

  • Building permit

    Proposal to replace existing fire-pump.

    170 COLLEGE ST · Nov 17, 2026 · 266 m away
  • Building permitsecondary suite

    Revision 01: interior alterations and a 3 storey addition at rear yard. Proposed interior layout modification and 3 storey addition/extension at rear yard. --Party Wall Admin Permits- 2026 216781 BLD 00 SR

    221 BEVERLEY ST · Nov 12, 2026 · 111 m away
  • Building permit

    Proposal for repair and reinstate a portion of the dwelling due to vehicle impact damage

    196 BEVERLEY ST · Nov 10, 2026 · 225 m away
  • Building permitmultiplex

    Interior alteration to existing apartment 1&2 (first floor) of existing 3 storey Multi Tennant Residential detached dwelling. Replacement of existing basement stair enclosure.

    198 BEVERLEY ST · Nov 9, 2026 · 213 m away
  • Building permit

    Proposal for sprinkler modification and fire alarm audible device relocation in the fitness room.

    251 COLLEGE ST · Nov 4, 2026 · 227 m away
  • Building permit

    Revision 01 - Revision to delete all layout, fixutres, and finishes for Wallberg Men¿s Washroom 252A, add new layout, fixtures, and finishes for Wallberg New Private Washroom 1 252A and Wallberg NewPrivate Washroom 2 252C.--------------------------------------------------------------Proposal for interior alterations to three washrooms on the second floor in the Wallberg Building

    184 COLLEGE ST · Nov 2, 2026 · 161 m away
  • Zoning review

    Notice Sent

    78 BALDWIN ST · Oct 22, 2026 · 288 m away
  • Building permit

    1 wall sign**POPEYES**

    267 COLLEGE ST · Oct 15, 2026 · 274 m away
  • Building permit

    Standalone Shoring and Excavation permit for remediation purposes.

    191 COLLEGE ST · Oct 15, 2026 · 130 m away
  • Building permit

    1 wall sign**POPEYES**

    267 COLLEGE ST · Sep 25, 2026 · 274 m away

Neighbourhood: Kensington-Chinatown

About the area around the lot, not the lot itself.

Nearest station
Queen's Park Station8 min walk
Nearest TTC stop
College St at Beverley St1 min walk
Nearest cycling route
College StCycle Track, 1 min walk
Nearest traffic count
19,840 vehicles in 14 hCollege St / St George St / Beverley St, 60 m away, Oct 9, 2025
Serious collisions within 500 m
82021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 6 with cyclists
Parks
Lillian H. Smith Park3 min walk
Julius Deutsch Park3 min walk
Glasgow Street Parkette4 min walk

Schools within 1 km

  • BRAEMAR COLLEGE PRIVATE SECONDARY SCHOOL Private 2 min walk
  • RONALD MCDONALD HOUSE Private 4 min walk
  • BEVERLEY & SUBWAY ACADEMY TWO English Public 4 min walk
  • ORDE STREET JR PUBLIC SCHOOL English Public 5 min walk
  • CORNERSTONE PREPARATORY SCHOOL - MAIN CAMPUS Private 5 min walk
  • HEYDON PARK SECONDARY SCHOOL English Public 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureKensington-ChinatownMedian neighbourhood
Median household income (2020)$62,000$84,500
Households that own their home32%54%
Population (2021)18,12016,813
Homes built in 1960 or before26%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleKensington-ChinatownCity median
Assault2017.5636.3
Robbery19369.5
Shootings21.910.5
Auto theft118.4192.6
Theft over $5,000219.346.1
Break and enter443172.8
Theft from vehicles850.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.