HousePrecheckCheck an address

2106 Lawrence Ave EToronto · zoning, lot size and permit records

≈ 27.3 × 1404.6 m25,273 m²on Lawrence Ave E

Not a home

Vacant Land

The City of Toronto's real estate inventory lists Vacant Land here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • City of Toronto landThe City decides what happens here; ask it about any plans.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 27.3 m frontage≈ 1404.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Check before you build

    • Zoning not in By-law 569-2013

      Needs a closer look

      This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

      Zoning By-law 569-2013

    Lot facts

    Area
    25,273 m²
    Frontage
    27.3 mestimated, irregular lot
    Depth
    1,404.6 mestimated, irregular lot
    Street
    Lawrence Ave E
    Corner lot
    No
    Public lane
    None
    Max height
    —
    Max lot coverage
    —

      Around this lot

      Minor variances approved
      100%6 of 6 decisions
      Garden suite permits
      0
      Laneway suite permits
      0
      Multiplex permits
      1
      Development applications
      0

      Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).

      Recent variance decisions in the same zone

      • Minor varianceRefused

        To construct a new six-storey apartment building. There will be a total of 25 dwelling units on the property, and the existing dwelling will be demolished.

        1251 WARDEN AVE · Oct 7, 2026 · 413 m away
      • Minor varianceApproved

        To legalize and maintain the construction of a two-storey addition and deck in the rear north yard. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on March 11, 2026.

        37 TWIN PAULS CRES · May 6, 2026 · 262 m away
      • Minor varianceApproved

        To construct an ancillary roof structure above the existing deck in the rear east yard. There will be no change to the existing dwelling.

        90 ELLINGTON DR · Mar 11, 2026 · 118 m away
      • Minor varianceApproved

        To construct a new two-storey ancillary building (garden suite) in the rear yard of a lot containing an existing one-storey detached main dwelling. There will be a total of two dwelling units on the lot.

        171 ELLINGTON DR · Aug 13, 2025 · 406 m away
      • Minor varianceApproved

        To construct a new two-storey detached dwelling with three residential units, an integral garage with vehicular access from Willowhurst Crescent, a side (north) porch, a rear basement walkout, a rear ground floor deck and a rear second storey balcony. The existing one-storey detached dwelling and shed will be demolished. NOTE: This item was previously rescheduled from the Committee of Adjustment hearing on December 4, 2024 hearing and deferred at the Committee of Adjustment hearing on January 16, 2025.

        2 WILLOWHURST CRES · Apr 9, 2025 · 460 m away

      Latest activity nearby

      • Building permitmultiplex

        Revision 01 to remove the existing strip footing and provide new trench footings for the rear addition.Proposal to construct a rear addition, converting existing 1.5 storey dwelling into triplex.

        37 TWIN PAULS CRES · Nov 24, 2026 · 262 m away
      • Zoning review

        Closed

        75 HOWDEN RD · Oct 7, 2026 · 216 m away
      • Building permit

        Proposed construction of new electrical room and electrical service upgrade.

        100 HOWDEN RD · Oct 5, 2026 · 85 m away
      • Building permitnew building, new house, secondary suite

        Proposal to construct a 2 storey, 2 unit detached dwelling with integral garage, rear basement walkout and front porch

        41 TWIN PAULS CRES · Oct 3, 2026 · 286 m away
      • Building permitdemolition

        Proposal to demolish the existing dwelling

        41 TWIN PAULS CRES · Oct 2, 2026 · 286 m away
      • Building permit

        CONSTRUCTION OF ROOF COVER FOR AN EXISTING DECK AT THE BACK OF THE HOUSE AND DRIVEWAY EXTENSION IN THE FRONT OF THE BUILDING

        90 ELLINGTON DR · Jun 22, 2026 · 118 m away
      • Zoning review

        Closed

        41 TWIN PAULS CRES · Jun 19, 2026 · 286 m away
      • Minor varianceApproved

        To legalize and maintain the construction of a two-storey addition and deck in the rear north yard. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on March 11, 2026.

        37 TWIN PAULS CRES · May 6, 2026 · 262 m away
      • Building permit

        Proposed 2nd storey addition to existing SFD.

        2 TWEED CRES · Apr 13, 2026 · 205 m away
      • Minor varianceApproved

        To construct an ancillary roof structure above the existing deck in the rear east yard. There will be no change to the existing dwelling.

        90 ELLINGTON DR · Mar 11, 2026 · 118 m away

      Neighbourhood: Wexford/Maryvale

      About the area around the lot, not the lot itself.

      Nearest station
      Lawrence East Station29 min walk
      Nearest TTC stop
      Warden Ave at Manhattan Dr7 min walk
      Nearest traffic count
      14,815 vehicles in 8 hWarden Ave / Manhattan Dr, 430 m away, Feb 16, 2022
      Serious collisions within 500 m
      02021–2026, killed or seriously injured
      Parks
      Manhattan Park2 min walk
      Ellesmere Park15 min walk
      McGregor Park16 min walk

      Schools within 1 km

      • MANHATTAN PARK JR PUBLIC SCHOOL English Public 4 min walk
      • BOND ACADEMY SCHOOL Private 7 min walk
      • BUCHANAN PUBLIC SCHOOL English Public 10 min walk

      Being near a school does not mean the lot is in its catchment; check with the board.

      2021 Census

      FigureWexford/MaryvaleMedian neighbourhood
      Median household income (2020)$82,000$84,500
      Households that own their home59%54%
      Population (2021)28,34516,813
      Homes built in 1960 or before52%29%
      Homes needing major repairs7%7%

      Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

      Police-reported crime, 2025

      Per 100,000 peopleWexford/MaryvaleCity median
      Assault1128.2636.3
      Robbery125.769.5
      Shootings32.210.5
      Auto theft425.5192.6
      Theft over $5,00083.846.1
      Break and enter254.6172.8
      Theft from vehicles441.6188.1

      Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

      Something here not right?

      Sources

      • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
      • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
      • Development applications: Rezoning, site plan, subdivision and condominium applications.
      • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
      • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
      • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
      • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
      • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
      • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
      • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
      • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
      • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
      • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
      • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
      • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
      • Address points: loaded Nov 22, 2026, published Nov 20, 2026
      • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
      • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
      • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
      • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
      • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
      • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
      • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
      • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
      • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
      • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
      • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
      • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
      • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
      • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
      • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
      • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
      • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
      • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
      • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
      • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
      • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
      • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
      • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
      • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
      • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
      • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
      • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
      • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
      • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
      • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
      • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
      • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
      • School locations: loaded Oct 14, 2026, published May 27, 2026
      • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
      • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
      • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
      • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
      • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
      • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
      • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
      • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
      • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

      Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

      Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

      Flag an error

      What is not right?

      The problem

      The records come from the City's open data; we check each flag against them. Your email is used only to answer this.