HousePrecheckCheck an address

208 Niagara StToronto · zoning, lot size and permit records

≈ 103.1 × 105.1 m8,039 m²on Niagara Stcorner, also on Adelaide St Wbacks onto Ln N King W Tecumseth

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.8 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 26 200867 (Interior alteration to existing master bathroom. Replace existing Kitec water distribut..., 2026); 26 163393 (Proposal to remove existing exterior cladding system and install new EIFS wall assembly..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 30 storeysNew buildings may go up around here in the next years. More change nearby than at 93% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 103.1 m frontage≈ 105.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 11 building permits open, the oldest since 2009

    Needs a closer look

    Still open in the City's records: 24 125050 (Proposed replacement of in-suite kitec domestic water piping - unit 38, 2024, status Inspection); 23 113483 (Proposal to replace existing piping with Kitec piping, 2023, status Inspection); 22 239223 (Proposed replacement of the exisiting kitec piping serving the suite with uponor aquapex, 2023, status Inspection); and 8 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 25 138042 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 200867 (Interior alteration to existing master bathroom. Replace existing Kitec water distribut..., 2026); 26 163393 (Proposal to remove existing exterior cladding system and install new EIFS wall assembly..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • Records mention multiplex

    Good to know

    Permits or Committee of Adjustment files on this lot mention multiplex: 17 262315 (Replacement of kitec plumbing (pipe) in existing townhouse - Unit 103, 2017).

    What it means. Check that the unit you would buy matches what was approved, and that its permit was closed after final inspection.

    How to confirm. Ask the seller for the permit and final inspection. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 30 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

45 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 200867Inspection

    Interior alteration to existing master bathroom. Replace existing Kitec water distribution and plumbing rough-ins in existing fixture locations only. No fixture relocation. No structural wall removal. No slab cutting. Plumbing rough-in to be inspected prior to closing walls.

    Aug 11, 2026 · 208 NIAGARA ST
  • Building permit26 163393Permit Issued

    Proposal to remove existing exterior cladding system and install new EIFS wall assembly including air/water barrier, insulation, flashings, trims, sealants and associated exterior building envelope rehabilitation work.

    Jun 18, 2026 · 208 NIAGARA ST
  • Building permit26 157603Closed

    Proposal to replace kitech piping.

    May 13, 2026 · 208 NIAGARA ST
  • Building permit26 156169Closed

    Proposal to replace kitech piping.

    May 7, 2026 · 208 NIAGARA ST
  • Building permit26 113202Closed

    Kitec pipe replacement to Unit 6 in existing residential townhouse

    Feb 10, 2026 · 208 NIAGARA ST
  • Building permit25 175266Cancelled

    Proposal for replacement of kitec plumbing, exact replacement of current plumbing, no new fixtures added.

    Jun 10, 2025 · 208 NIAGARA ST
  • By-law investigation25 138042 PRS 00 IRClosed

    Property Standards

    Apr 1, 2025 · 208 NIAGARA ST
  • Building permit24 140481Closed

    Proposal to replace the kitec plumbing (pipe) in existing townhouse as part of a condo townhouse complex - UNIT 10

    May 6, 2024 · 208 NIAGARA ST
Show 37 older records
  • Building permit24 125050Inspection

    Proposed replacement of in-suite kitec domestic water piping - unit 38.

    Apr 5, 2024 · 208 NIAGARA ST
  • Building permit23 113483Inspection

    Proposal to replace existing piping with Kitec piping

    Feb 24, 2023 · 208 NIAGARA ST
  • Building permit22 239223Inspection

    Proposed replacement of the exisiting kitec piping serving the suite with uponor aquapex.

    Jan 9, 2023 · 208 NIAGARA ST
  • Building permit22 184899Closed

    Replacement of KTEC plumbing

    Aug 12, 2022 · 208 NIAGARA ST
  • Building permit22 148766Closed

    Replacement of domestic, in-suite Kitec piping with Uponor piping.

    Jul 27, 2022 · 208 NIAGARA ST
  • Building permit22 140593Revocation Pending

    Replacement of kitec plumbing (pipe) in existing townhouse - Unit 10

    May 11, 2022 · 208 NIAGARA ST
  • Building permit22 114749Closed

    Proposal to replace insuite domestic Kitec piping with Uponor Piping.

    Mar 3, 2022 · 208 NIAGARA ST
  • Building permit21 195022Closed

    Proposal for the replace of existing kitec piping with uponor piping

    Aug 26, 2021 · 208 NIAGARA ST
  • Building permit21 189164Closed

    Replace in-suite kite plumbing to Townhouse unit 92

    Aug 16, 2021 · 208 NIAGARA ST
  • Building permit21 156447Inspection

    Proposal for the replacement of insute kitec piping.

    Jun 4, 2021 · 208 NIAGARA ST
  • Building permit21 160033Closed

    To replace existing plumbing fixtures in kitchen and main bathroom, new bar sink on roof top patio - Unit 70

    Jun 2, 2021 · 208 NIAGARA ST
  • Building permit21 141022Closed

    Proposal to replace the kitec piping with Uponor piping in an existing townhouse as part of a larger complex. Plumbing fixtures to remain the same - UNIT 19

    May 3, 2021 · 208 NIAGARA ST
  • Building permit21 127450Closed

    Proposed to replace in-suite Kitec with uponor pex piping in existing Condo Townhouse.

    Mar 23, 2021 · 208 NIAGARA ST
  • Building permit21 111341Closed

    Proposal to replace the kitec plumbing installed in unit 7.

    Feb 10, 2021 · 208 NIAGARA ST
  • Building permit20 209369Closed

    replace kitec plumbing within house

    Oct 26, 2020 · 208 NIAGARA ST
  • Building permit20 203355Inspection

    Proposal to replace all Kitec piping with Uponor piping in an existing residential townhouse as part of a condo complex - UNIT 85

    Oct 15, 2020 · 208 NIAGARA ST
  • Building permit20 201260Closed

    Replacement of kitec piping in the existing townhouse complex, Unit 50

    Oct 7, 2020 · 208 NIAGARA ST
  • Building permit20 108985Closed

    Proposal for KITEC plumbing replacement

    Mar 2, 2020 · 208 NIAGARA ST
  • Building permit20 115118Closed

    Proposed to replace Kitec Plumbing for unit 82

    Feb 26, 2020 · 208 NIAGARA ST
  • Building permit20 108574Revocation Pending

    Proposal to replace kitec plumbing in existing sfd-townhouse.

    Jan 27, 2020 · 208 NIAGARA ST
  • Building permit19 246875Closed

    Proposal for replacement of kitec piping for unit 13 in the existing townhouse complex

    Nov 20, 2019 · 208 NIAGARA ST
  • Building permit19 245495Closed

    Proposal to replace kitec piping in existing single family dwelling townhouse.

    Nov 5, 2019 · 208 NIAGARA ST
  • Building permit19 227652Closed

    Proposal to replace KITEC Pipes in townhouse unit 104 in the existing townhouse complex.

    Oct 8, 2019 · 208 NIAGARA ST
  • Building permit19 203451Closed

    Proposal for KITEC Replacement in unit 60 of the existing SFD - Townhouse Complex.

    Aug 22, 2019 · 208 NIAGARA ST
  • Building permit19 189141Closed

    Proposal to replace KITEC Pipes in unit TH57 in the existing townhouse complex.

    Jul 26, 2019 · 208 NIAGARA ST
  • Building permit19 157011Inspection

    Proposed Kitec plumbing replacement in an existing apartment building condo. unit.

    Jun 21, 2019 · 208 NIAGARA ST
  • Building permit19 128155Closed

    Proposal to replace kitec piping in unit 71 of existing townhouse development.

    Apr 2, 2019 · 208 NIAGARA ST
  • Building permit18 267551Inspection

    Remove all hot and cold kitec lines and replace with new pex lines

    Jan 7, 2019 · 208 NIAGARA ST
  • Building permit18 265394Closed

    Proposal for interior alterations to the ground and 2nd floor of the existing single family dwelling, work to take place in condo unit 114.

    Jan 2, 2019 · 208 NIAGARA ST
  • Building permit18 223527Cancelled

    Proposal to replace ki-tec pipes with Uponor AquaPEX® polyethylene cross linked (PEX) tubing and Uponor ProPex® fittings system.

    Sep 24, 2018 · 208 NIAGARA ST
  • Building permit17 262315Closedmultiplex

    Replacement of kitec plumbing (pipe) in existing townhouse - Unit 103

    Nov 16, 2017 · 208 NIAGARA ST
  • Building permit17 108671Inspection

    Remove existing KITEC piping water pipes included in bathrooms, kitchen and laundry room. Reinstall all plumbing with copper pipes for all areas

    Jan 30, 2017 · 208 NIAGARA ST
  • Building permit16 245051Cancelled

    Proposal to install 1/2 sanitary/ 50" piping

    Oct 31, 2016 · 208 NIAGARA ST
  • Building permit16 241568Closed

    Replace old water piping with new water piping

    Oct 24, 2016 · 208 NIAGARA ST
  • Building permit14 132849Closed

    Proposal to install a back flow prevention device in the existing townhouse complex.

    Mar 27, 2014 · 208 NIAGARA ST
  • Building permit10 116203Closed

    backflow preventor for townhouse

    Feb 11, 2010 · 208 NIAGARA ST
  • Building permit09 179982Inspection

    Interior alteratins to repair fire damage in suite 8 of existing rowhouse. Prop manager - Abbey - 416-846-5366MRDD FEES

    Oct 28, 2009 · 208 NIAGARA ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
8,039 m²
Frontage
103.1 mestimated, irregular lot
Depth
105.1 mestimated, irregular lot
Street
Niagara St
Corner lot
Yes, also on Adelaide St W105.1 m along it
Public lane
Ln N King W Tecumseth, 10.7 m along it
Max height
—
Max lot coverage
—
  • 16 City trees in front of this lot. The City's street tree inventory lists 16 trees at this address: honey locust (28 cm), honey locust (26 cm), honey locust (24 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
86%60 of 70 decisions
Garden suite permits
0
Laneway suite permits
4
Multiplex permits
15
Development applications
8

Within 300 m, last 10 years. 19 suite and multiplex permits: more than at 87% of Toronto houses (median 3). 70 variance decisions: more than at 96% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new three-and-one-half-storey semi-detached houseplex (duplex) with a front porch with stairs, a front basement entrance with stairs, a rear ground floor deck with stairs, and a rear fourth storey rooftop deck platform. Also, to construct a new one-storey ancillary building (detached garage containing an undersized parking space with a green roof) in the rear yard, with vehicular access from the abutting public lane (Stanley Terrace) along the (side) east lot line. There will be a total of two dwelling units on this lot.

    823 ADELAIDE ST W · Jul 22, 2026 · 265 m away
  • Minor varianceApproved

    To alter the existing two-storey townhouse dwelling by constructing a new partial rear two-storey addition (to replace the existing partial rear two-storey addition) and a rear stone patio. The existing rear one-storey detached ancillary building (garage) will be demolished.

    157 WOLSELEY ST · Jul 15, 2026 · 407 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 686-2023(OLT)) for an 18-storey mixed-use building (which is currently under construction), by constructing one additional storey. There will be a total of 243 residential dwelling units on this lot.

    950 KING ST W · Apr 29, 2026 · 396 m away
  • Minor varianceApproved

    To construct a new one-storey detached ancillary building (one-car garage) in the rear yard, abutting the laneway.

    736 RICHMOND ST W · Apr 15, 2026 · 238 m away
  • Minor varianceApproved

    To construct a new one-storey detached commercial (retail) building with a mezzanine level at the rear portion of the building.

    686 QUEEN ST W · Feb 18, 2026 · 316 m away

Latest activity nearby

  • Minor variancePending

    To construct a new three-storey semi-detached dwelling with a front basement walkout, a front porch with stairs, a front third storey covered balcony, and a rear third storey juliette balcony. Also, a rear yard parking pad (abutting the laneway) will be constructed.

    12 WHITAKER AVE · Dec 16, 2026 · 88 m away
  • Minor variancePending

    To permit a self-storage facility (Storage Warehouse, Class A) within the existing 10-storey commercial building by converting portions of the second floor, and the full fourth and sixth floors into a self-storage facility, with a co-working space occupying the remaining portion of the second floor. The remaining portions of the building will continue to be used for commercial and office uses. There will be a total of 125 parking spaces provided (89 within the underground parking garage and 36 in the rear surface level lot).

    720 KING ST W · Dec 9, 2026 · 254 m away
  • Building permit

    Interior alterations - Unit 505

    720 KING ST W · Nov 20, 2026 · 254 m away
  • Building permitmultiplex, secondary suite

    Revision: The basement entrance retaining wall has been changed from a cast-in-place concrete wall to a 10-inch reinforced concrete block wall.

    752 RICHMOND ST W · Nov 18, 2026 · 246 m away
  • Building permit

    REV 01: Office replaced with washroom including new exhaust fan, Exhaust fan added to kitchen, Air handler unit for cold air onlyProposed interior alterations for 'In Cha' tea shop with 7 seats

    791 QUEEN ST W · Nov 17, 2026 · 272 m away
  • Building permit

    Installation of 2 maglocks on amenity floors

    701 KING ST W · Oct 26, 2026 · 298 m away
  • Building permitsecondary suite

    Party wall administrative permit related to work at 736 Richmond St W. 26-166843 BLD 00 SR

    734 RICHMOND ST W · Oct 23, 2026 · 238 m away
  • Building permitmultiplex, secondary suite

    Proposed alterations to convert dwelling to 3-units from 4-units (2 basement units are un-permitted). Work entails legalising a self-contained unit in basement (B1 - front of dwelling) and removing a self-contained unit in basement (B2 - rear of dwelling) built without a building permit by previous ownership. In response to Order to comply 26 134575 WNP 00 VI

    263 NIAGARA ST · Oct 22, 2026 · 193 m away
  • Zoning review

    Cancelled

    842 KING ST W · Oct 20, 2026 · 115 m away
  • Building permit

    REV01: Revisions to structural - refer to ground floor plan for structural revisions.Proposal to construct 1 storey detached garage in rear yard

    736 RICHMOND ST W · Oct 7, 2026 · 238 m away

Neighbourhood: West Queen West

About the area around the lot, not the lot itself.

Nearest station
Exhibition GO Station21 min walk
Nearest TTC stop
King St West at Niagara St1 min walk
Nearest cycling route
Adelaide St WSharrows, 1 min walk
Nearest traffic count
10,600 vehicles in 14 hKing St W / Niagara St, 100 m away, Nov 14, 2023
Serious collisions within 500 m
92021–2026, killed or seriously injured: 1 fatal, 6 with pedestrians, 3 with cyclists
Parks
Stanley Park South - Toronto3 min walk
Stanley Park North - Toronto3 min walk
South Stanley Park Extension5 min walk

Schools within 1 km

  • NIAGARA STREET JR PUBLIC SCHOOL English Public 1 min walk
  • ST MARY CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
  • DISCOVERING MINDS MONTESSORI SCHOOL Private 6 min walk
  • CHARLES G FRASER JR PUBLIC SCHOOL English Public 9 min walk
  • ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 12 min walk
  • GIVINS SHAW JR PUBLIC SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWest Queen WestMedian neighbourhood
Median household income (2020)$101,000$84,500
Households that own their home54%54%
Population (2021)13,17016,813
Homes built in 1960 or before14%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWest Queen WestCity median
Assault588.7636.3
Robbery51.869.5
Shootings6.510.5
Auto theft84.1192.6
Theft over $5,00019.446.1
Break and enter258.8172.8
Theft from vehicles181.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.