HousePrecheckCheck an address

2075 Queen St EToronto · zoning, lot size and permit records

Also 12 Lee Ave, 30 Lee Ave

Open space · OR187.0 × 442.5 m78,844 m²on Queen St Ecorner, also on Lee Ave

Not a home

Kew Gardens

The City of Toronto's real estate inventory lists Kew Gardens here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
N50 m
187.0 m frontage442.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • TRCA regulated area (7% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Natural Heritage System (21% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Adequate Heat): 26 222873 HEA 00 IR (Adequate Heat, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • By-law investigation26 225772 SIN 00 IRClosed

    Signs

    Aug 25, 2026 · 2075 QUEEN ST E
  • By-law investigation26 222873 HEA 00 IRClosed

    Adequate Heat

    Aug 20, 2026 · 2075 QUEEN ST E
  • Building permit21 161922Closed

    One 30' x 60' Temporary Tent to be used in conjunction with a COVID-19 Pop-Up Immunization Centre operated by Michael Garon Hospital. To be installed May 29 and removed May 31, 2021

    May 28, 2021 · 2075 QUEEN ST E
  • Zoning review19 161339 ZPRClosed
    May 28, 2019 · 2075 QUEEN ST E
  • Zoning review14 153114 LTOClosed
    May 7, 2014 · 2075 QUEEN ST E
  • Building permit05 138479Closed

    Installation of foundation for new signage to park as per Council direction of June 2004.

    Jun 3, 2005 · 2075 QUEEN ST E

Lot facts

Area
78,844 m²
Frontage
187 m
Depth
442.5 m
Street
Queen St E
Corner lot
Yes, also on Lee Ave442.5 m along it
Public lane
None
House footprint
743 m²roof up to 8.1 m
Back yard
9.6 mhouse to rear lot line
Side yards
40.3 m and 96 mhouse to side lot lines
Buildings on the lot
5house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 12 City trees in front of this lot. The City's street tree inventory lists 12 trees at this address: maple (110 cm), oak, white (106 cm), ash, green (63 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
92%49 of 53 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
6
Development applications
1

Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 53 variance decisions: more than at 87% of Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal for a rear second floor addition and enclosing the existing front veranda

    54 KENILWORTH AVE · Nov 24, 2026 · 249 m away
  • Building permit

    Replacement of an existing 1" DCVA backflow prevention valve

    2006 QUEEN ST E · Nov 24, 2026 · 252 m away
  • Zoning review

    Closed

    55 LEUTY AVE · Nov 18, 2026 · 241 m away
  • Building permit

    Supply and install main sanitary back water valve

    21 LEE AVE · Nov 13, 2026 · 139 m away
  • Building permitsecondary suite

    Proposal to convert existing finished basement into secondary suite.

    90 WAVERLEY RD · Nov 10, 2026 · 220 m away
  • Zoning review

    Closed

    1973 QUEEN ST E · Oct 27, 2026 · 268 m away
  • Minor varianceApproved

    To legalize and to maintain the existing rear second-storey addition, which was constructed without an authorized building permit. Also, to alter the existing two-storey townhouse dwelling by constructing a front one-storey addition (verandah enclosure) and a rear ground floor juliette balcony.

    54 KENILWORTH AVE · Oct 21, 2026 · 249 m away
  • Building permit

    Proposal for structural fire damage restorationSee BR Building Request file 26 208295 000 00 BR for Fire Damage Report

    2000 QUEEN ST E · Oct 6, 2026 · 265 m away
  • Building permit

    Install first party wall sign **CROCK A DOODLE**

    2193 QUEEN ST E · Sep 23, 2026 · 279 m away
  • Building permit

    1 wall sign.***OPTICAL CENTER

    2064 QUEEN ST E · Sep 11, 2026 · 299 m away

Neighbourhood: The Beaches

About the area around the lot, not the lot itself.

Nearest station
Danforth GO Station36 min walk
Nearest TTC stop
Queen St East at Bellefair Ave4 min walk
Nearest cycling route
Lee AveSigned Route (No Pavement Markings), 2 min walk
Nearest traffic count
12,805 vehicles in 14 hQueen St E / Bellefair Ave / Kew Gardens Trl, 240 m away, Aug 5, 2026
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Kew Gardens1 min walk
Beaches Park2 min walk
Pantry Park4 min walk

Schools within 1 km

  • BOARDWALK MONTESSORI SCHOOL Private 4 min walk
  • KEW BEACH JR PUBLIC SCHOOL English Public 6 min walk
  • AVALON CHILDREN'S MONTESSORI SCHOOL Private 10 min walk
  • GLEN AMES SR PUBLIC SCHOOL English Public 11 min walk
  • WILLIAMSON ROAD JR PUBLIC SCHOOL English Public 11 min walk
  • ST DENIS CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureThe BeachesMedian neighbourhood
Median household income (2020)$116,000$84,500
Households that own their home63%54%
Population (2021)21,51016,813
Homes built in 1960 or before65%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleThe BeachesCity median
Assault525.6636.3
Robbery25.269.5
Auto theft164192.6
Theft over $5,00050.546.1
Break and enter151.4172.8
Theft from vehicles243.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.