HousePrecheckCheck an address

207 Parliament StToronto · zoning, lot size and permit records

Commercial residential · CR 2.5 (c2.0; r2.0) SS2 (x2382)6.3 × 30.6 m185 m²on Parliament Stbacks onto Anna Hilliard Lane

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • 5 development applications open within 300 m, up to 46 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: Moss ParkThe City plans more homes around the station: good for transit, and more building over time.
N10 m
6.3 m frontage30.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 46 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Check before you build

  • Site-specific exception 900.11.10(2382)

    Needs a closer look

    11 site-specific rules and 11 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2382)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 132 of former City of Toronto By-law 438-86

  2. Rule B

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

  3. Rule C

    Former City of Toronto by-law 531-78

  4. Rule D

    Former City of Toronto by-law 532-78

  5. Rule E

    Former City of Toronto by-law 533-78

  6. Rule F

    Former City of Toronto by-law 39-80

  7. Rule G

    Former City of Toronto by-law 59-82

  8. Rule H

    Former City of Toronto by-law 546-83

  9. Rule I

    Former City of Toronto by-law 547-83

  10. Rule J

    Former City of Toronto by-law 49-90

  11. Rule K

    On 181 Parliament St., the odd numbered addresses of 205-217 Parliament St. , the even numbered addresses of 348-404 Queen St. E., the even numbered addresses of 418-420 Queen St. E., 428-438 Queen St. E., 104 Sackville St., 567 Shuter St., 8 Trefann St., former City of Toronto by-laws 284-72 and 204-79.

  12. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 132 of former City of Toronto By-law 438-86

  13. Older by-law B

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

  14. Older by-law C

    Former City of Toronto by-law 531-78

  15. Older by-law D

    Former City of Toronto by-law 532-78

  16. Older by-law E

    Former City of Toronto by-law 533-78

  17. Older by-law F

    Former City of Toronto by-law 39-80

  18. Older by-law G

    Former City of Toronto by-law 59-82

  19. Older by-law H

    Former City of Toronto by-law 546-83

  20. Older by-law I

    Former City of Toronto by-law 547-83

  21. Older by-law J

    Former City of Toronto by-law 49-90

  22. Older by-law K

    On 181 Parliament St., the odd numbered addresses of 205-217 Parliament St. , the even numbered addresses of 348-404 Queen St. E., the even numbered addresses of 418-420 Queen St. E., 428-438 Queen St. E., 104 Sackville St., 567 Shuter St., 8 Trefann St., former City of Toronto by-laws 284-72 and 204-79.

By-law 569-2013, Chapter 900

Lot facts

Area
185 m²
Frontage
6.3 m
Depth
30.6 m
Street
Parliament St
Corner lot
No
Public lane
Anna Hilliard Lane, 5.7 m along it
Max height
14 m
Max lot coverage
—
  • Major Transit Station Area: Moss Park. The lot is inside the Moss Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 763). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Parliament Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 2.5 (c2.0; r2.0) SS2 (x2382) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%23 of 23 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
19

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 23 variance decisions: more than at 54% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To legalize and to maintain the interior ground floor staircase, leading to the mezzanine, which was constructed without an authorized building permit. It should be noted that access to the mezzanine was only from the exterior of the building.

    53 ONTARIO ST · Sep 23, 2026 · 376 m away
  • Minor varianceApproved

    The existing undersized public parking lot will be maintained and unaltered.

    4 GILEAD PL · Sep 9, 2026 · 438 m away
  • Minor varianceApproved

    The existing one-storey and two-storey commercial buildings (retail and daycare) will be maintained and unaltered.

    4 GILEAD PL · Sep 9, 2026 · 438 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by constructing a rear one-storey addition with a basement to expand commercial units and to provide a new internal connection on the ground floor between the main building and the rear ancillary building on the lot, abutting the laneway. Also, to construct a new rooftop deck above the one-storey addition with access via staircases to the rear laneway, rear second level, and third storey with a balcony. Further, to convert the existing three-storey mixed-use building and rear two-storey ancillary building into a commercial development. The commercial units will remain within the basement and ground floor of the main building. A total of two residential dwelling units will be removed.

    244 QUEEN ST E · Mar 11, 2026 · 365 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-Law 1299-2023) for a mixed-use building (45 and 49-storeys), by increasing the total building height, the height of the podium, and mechanical penthouse vertical projections, equipment, structures and screening, and cladding encroachments of Building A. Also, to reduce the number of bicycle parking spaces and to alter the bicycle parking locations. A related Site Plan Approval application (under File Number 21 148154 STE 13 SA) is currently under review and consideration. There will be a total of 1,227 residential dwelling units (including approximately 245 affordable housing units) on this lot.

    49 ONTARIO ST · Aug 13, 2025 · 403 m away

Latest activity nearby

  • Zoning review

    Not Started

    290 SHUTER ST · Nov 17, 2026 · 100 m away
  • Zoning review

    Under Review

    339 QUEEN ST E · Nov 6, 2026 · 139 m away
  • Zoning review

    Under Review

    20 REGENT ST · Oct 27, 2026 · 157 m away
  • Zoning review

    Closed

    234 PARLIAMENT ST · Oct 8, 2026 · 129 m away
  • Building permit

    REVISION - revised drawingsProposed commercial kitchen ventilation system.

    368 QUEEN ST E · Oct 5, 2026 · 92 m away
  • Building permit

    Demolish rear yard deteriorated stand alone building extension. The rear wall of the original building shall remain intact (addition was not connected to the existing building).

    314 QUEEN ST E · Sep 11, 2026 · 135 m away
  • Building permit

    Proposal to reconstruct the existing garage while maintaining its existing footprint and overall dimensions.

    205 BERKELEY ST · Sep 9, 2026 · 155 m away
  • Building permit

    Renovation to the ground floor of an existing apartment building "Brother Joseph Dooley Apartments" to facilitate the installation of a barrier free entrance and vestibule from Sydenham Street. The existing entrance from Tracy street will be enclosed and the interior configuration of the ground floor which includes 3 residential suites and offices will be reconfigured.

    412 QUEEN ST E · Sep 9, 2026 · 160 m away
  • Building permit

    Proposed interior alterations to existing basement to expand existing medical clinic

    412 QUEEN ST E · Sep 2, 2026 · 160 m away
  • Building permit

    Reconstructing deteriorated deck in the rear yard.

    314 QUEEN ST E · Aug 13, 2026 · 135 m away

Neighbourhood: Regent Park

About the area around the lot, not the lot itself.

Nearest station
Queen Station21 min walk
Nearest TTC stop
Parliament St at Shuter St1 min walk
Nearest cycling route
Shuter StCycle Track, 1 min walk
Nearest traffic count
14,493 vehicles in 14 hShuter St / Parliament St, 60 m away, Oct 9, 2025
Serious collisions within 500 m
92021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 2 with cyclists
Parks
Orphan's Green4 min walk
40 Power St Park4 min walk
Ontario Street Parkette4 min walk

Schools within 1 km

  • LIBERTY PREP SCHOOL Private 3 min walk
  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk
  • NELSON MANDELA PARK PUBLIC SCHOOL English Public 6 min walk
  • INGLENOOK COMMUNITY SCHOOL English Public 8 min walk
  • LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 8 min walk
  • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRegent ParkMedian neighbourhood
Median household income (2020)$65,500$84,500
Households that own their home30%54%
Population (2021)12,75016,813
Homes built in 1960 or before13%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRegent ParkCity median
Assault947.8636.3
Robbery83.569.5
Shootings610.5
Auto theft95.4192.6
Theft over $5,00011.946.1
Break and enter166.9172.8
Theft from vehicles125.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.