Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Work or applications in progress
Good to knowRecent records on this lot: 26 157677 (Proposal to install two certified 30'x45' tents (Cert # 25-135938). Installation date:..., 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications3 Committee of Adjustment files on this lot
Good to know0 approved. B38/02E (To obtain consent to sever the property into four industrial lots, 2002); B36/02E (To obtain consent to sever the property into a total of four industrial lots, 2002); B37/02E (To obtain consent to sever the property into four industrial lots, 2002).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
8 records on file: more than at 98% of Toronto houses (median 0).
- Building permit26 157677Permit Issued
Proposal to install two certified 30'x45' tents (Cert # 25-135938). Installation date: 07 May- 11 July 2026w stages and other temporary structures
Jun 17, 2026 · 207 NEW TORONTO ST - Zoning review11 326758 POZClosedDec 15, 2011 · 207 NEW TORONTO ST
- Zoning review05 102429 PSPClosedJan 14, 2005 · 207 NEW TORONTO ST
- Zoning review04 143626 ZPRClosedJun 4, 2004 · 207 NEW TORONTO ST
- Consent (lot split)B38/02EWithdrawn
To obtain consent to sever the property into four industrial lots
Aug 8, 2002 · 207 NEW TORONTO ST - Consent (lot split)B36/02EWithdrawn
To obtain consent to sever the property into a total of four industrial lots.
Aug 8, 2002 · 207 NEW TORONTO ST - Consent (lot split)B37/02EWithdrawn
To obtain consent to sever the property into four industrial lots.
Aug 8, 2002 · 207 NEW TORONTO ST - Zoning review02 148338 ZPRClosedJun 19, 2002 · 207 NEW TORONTO ST
Check before you build
Site-specific exception 900.20.10(54)
Needs a closer look1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
City of Toronto by-law 339-2012.
Lot facts
- Area
- 60,967 m²
- Frontage
- 225.4 m
- Depth
- 271.9 m
- Street
- New Toronto St
- Corner lot
- Yes, also on Fourteenth St271.9 m along it
- Public lane
- Ln E Fifteenth N Birmingham, 5.9 m along it
- Max height
- —
- Max lot coverage
- —
Around this lot
- Minor variances approved
- 94%15 of 16 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 4
- Development applications
- 0
Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct a one-storey industrial building.
429 KIPLING AVE · Mar 20, 2025 · 494 m away - Minor varianceApproved
To permit a waste trasfer station.
425 KIPLING AVE · Oct 22, 2015 · 464 m away
Latest activity nearby
- Zoning review
Not Started
240 BIRMINGHAM ST · Nov 19, 2026 · 202 m away - Building permit
Proposal for structural fire damage restoration
256 BIRMINGHAM ST · Oct 27, 2026 · 282 m away - Building permit
Demolition of existing one-storey single detached dwelling (approx. 145 m² GFA) at 399 Kipling Avenue. Excavation to be backfilled and site graded to existing conditions. No work to adjacent properties.
399 KIPLING AVE · Oct 6, 2026 · 297 m away - Building permit
Proposal for the repair and restoration of an existing fire-damaged semi-detached dwelling to its pre-loss condition.
258 BIRMINGHAM ST · Sep 30, 2026 · 286 m away - Building permit
PROPOSED THREE STOREY SEMI-DETACHED FOURPLEX.
254 BIRMINGHAM ST · Sep 24, 2026 · 278 m away - Building permit
Proposal for demoilition of existing 2 storey dwelling and construction of 2 new semi detached fourplexes.
254 BIRMINGHAM ST · Sep 24, 2026 · 278 m away - Building permit
Proposal for three storey fourplex semi-detached dwelling
254 BIRMINGHAM ST · Sep 24, 2026 · 278 m away - Zoning review
Closed
136 SIXTEENTH ST · Jun 29, 2026 · 188 m away - Building permit
Proposal to install two certified 30'x45' tents (Cert # 25-135938). Installation date: 07 May- 11 July 2026w stages and other temporary structures
207 NEW TORONTO ST · Jun 17, 2026 · 122 m away - Building permit
Proposal for rear addition at ground floor to existing single family dwellling
88 SIXTEENTH ST · Jun 12, 2026 · 202 m away
Neighbourhood: New Toronto
About the area around the lot, not the lot itself.
- Nearest station
- Mimico GO Station32 min walk
- Nearest TTC stop
- Birmingham St at Fourteenth St4 min walk
- Nearest cycling route
- Birmingham StCycle Track, 4 min walk
- Nearest traffic count
- 7,623 vehicles in 14 hThirteenth St / Birmingham St / William Jackson Way, 270 m away, May 13, 2026
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- Birmingham Street Parkette5 min walk
- Lakeshore Village Park7 min walk
- Don Russell Memorial Park8 min walk
Schools within 1 km
- LAKESHORE COLLEGIATE INSTITUTE English Public 6 min walk
- ST JOSAPHAT CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
- THE HOLY TRINITY SCHOOL English Separate 12 min walk
- CHILDREN'S URBAN ENRICHMENT STUDIO Private 12 min walk
- TWENTIETH STREET JR SCHOOL English Public 12 min walk
- HUMBER COLLEGE SCHOOL - LAKESHORE CAMPUS College 14 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | New Toronto | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $68,500 | $84,500 |
| Households that own their home | 44% | 54% |
| Population (2021) | 11,345 | 16,813 |
| Homes built in 1960 or before | 45% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | New Toronto | City median |
|---|---|---|
| Assault | 903.2 | 636.3 |
| Robbery | 76.5 | 69.5 |
| Shootings | 15.3 | 10.5 |
| Auto theft | 145.4 | 192.6 |
| Theft over $5,000 | 91.9 | 46.1 |
| Break and enter | 183.7 | 172.8 |
| Theft from vehicles | 244.9 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.