Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 2039 Danforth Ave
2039 Danforth Ave is on a 5.2 m by 30.5 m lot on Danforth Ave in Woodbine Corridor. The zoning is CR. A site-specific exception, 900.11.10(2219), changes some of the usual rules for this address.
The City has 8 records on this lot since 1981. That is more than at 98% of Toronto houses. In 2018, a building permit was filed: "Proposal to convert existing retail space to a recreation use/commercial school, including interior alterations to the space". Status: closed. In 2009, a development application was filed: "Rezoning application to permti the development of the vacant parcel of lands municpally known as 2055 and 2057 danforth ave for a new mixed use building 12…". Status: closed. In 2002, a building permit was filed: "Install fixtures: cost included in bp 02-136025 basement: 1-2 compt ks, 2 wb, 1 bt, 2 wc, 1 wm, 1st fl: 1 wb, 1 wc, 2nd fl: 1-2 compt ks, 2 wb, 1 bt, 2 wc, 1 wm". Status: closed. Nothing on file is open right now.
Within 300 m, 2 development applications are open (the tallest up to 35 storeys). Woodbine station is a 3-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Site-specific exception 900.11.10(2219)Moderate
- 2 development applications open within 300 mLowFree check
- 1 City tree in front of this lotLowFree check
- Site and Area Specific Policy 552Low
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
City files on this lot
8 records on file, more than at 98% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2018-09-17 | Building permit18 198514 | Proposal to convert existing retail space to a recreation use/commercial school, including interior alterations to the space | Closed | |
| 2010-06-18 | Zoning review10 200431 LPR | No description on file | Closed | |
| 2009-08-21 | Development application09 160985 STE 32 OZ | Rezoning application to permti the development of the vacant parcel of lands municpally known as 2055 and 2057 Danforth Ave for a new mixed use building 12 storeis in height containing 141 residential dwelling units and ground floor related commercial units (11528m2 of GFA). The project includes a parking area located below grade. | Closed | |
| 2003-08-08 | Zoning review03 164829 ZPU | No description on file | Closed | |
| 2002-11-14 | Building permit02 189168 | INSTALL FIXTURES: COST INCLUDED IN BP 02-136025 basement: 1-2 compt ks, 2 wb, 1 bt, 2 wc, 1 wm, 1st fl: 1 wb, 1 wc, 2nd fl: 1-2 compt ks, 2 wb, 1 bt, 2 wc, 1 wm | Closed | |
| 2002-09-16 | Building permit02 136025 | Make alteations and construct 2 storey & basement addition on East side. see 02 - 136012 for plans under 2035 Danforth Av. Hold for development charge, EDC and copy of survey re: right-of-way. | Closed | |
| 2002-05-10 | Building permit02 121003 | repair fire damage. for plans see 02-120996 2035 danforth av | Closed | |
| 1981-04-02 | Zoning review81 030130 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(2219)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(2219)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 City tree in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Site and Area Specific Policy 552
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2219)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 3.0 (c2.0; r2.5) SS2 (x2219)
- Height limit
- 14 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 99 m²
- Back yard
- 8.6 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 2 development applications open within 300 m, up to 35 storeys
- In the Woodbine station area
- 10 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
2 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Woodbine Corridor neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Woodbine StationNearest station3 min walk
- Danforth Ave at Woodbine AveNearest TTC stop1 min walk
- Danforth AveNearest cycling route1 min walk
- St Brigid Catholic Elementary SchoolSchool5 min walk
- Gledhill Jr Public SchoolSchool7 min walk
- Earl Beatty Jr & Sr Public SchoolSchool10 min walk
- Earl Haig Public SchoolSchool12 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3728.8
- Robberycity median 69.521.9
- Auto theftcity median 192.665.6
- Theft over $5,000city median 46.143.7
- Break and entercity median 172.8123.9
- Theft from vehiclescity median 188.1131.2
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist