Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 203 Madison Ave
203 Madison Ave is on a 9.8 m by 39.4 m lot on Madison Ave in Annex. The zoning is R. A site-specific exception, 900.2.10(900), changes some of the usual rules for this address. The property is inside a Heritage Conservation District, so many outside changes need a City heritage permit.
The City has 14 records on this lot since 2002. That is more than at 99% of Toronto houses. In 2020, a Committee of Adjustment application was filed: "To construct a 1½-storey detached garden suite in the rear of the existing 2½-storey detached dwelling". Status: closed. In 2009, a building permit was filed: "Proposal to enclose 2nd fl front porch". Status: closed. In 2008, a Committee of Adjustment application was filed: "To construct a second floor addition over the existing front porch of the three-unit, three-storey dwelling". Status: closed. Nothing on file is open right now.
Within 300 m, 2 development applications are open (the tallest up to 18 storeys). Dupont station is a 2-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Heritage property: in a Heritage Conservation District (Part V)Moderate
- Records mention garden suiteModerateFree check
- Site-specific exception 900.2.10(900)Moderate
- 1 by-law investigation closed in the last two yearsLow
- 2 development applications open within 300 mLowFree check
- Downtown Plan Secondary PlanLow
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Records mention garden suite
- 1 by-law investigation closed in the last two years
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Records mention garden suite
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 by-law investigation closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
14 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-08-18 | By-law investigation26 221948 ZON 00 IR | Zoning | Closed | |
| 2020-10-09 | Minor varianceA0033/21TEY | To construct a 1½-storey detached garden suite in the rear of the existing 2½-storey detached dwelling. | Withdrawn | |
| 2020-07-29 | Zoning review20 174532 ZZC | No description on file | Cancelled | |
| 2009-01-30 | Building permit09 102646 | Proposal to enclose 2nd fl front porch. | Closed | |
| 2008-10-22 | Minor varianceA0940/08TEY | To construct a second floor addition over the existing front porch of the three-unit, three-storey dwelling. | Approved | |
| 2008-09-12 | Zoning review08 203181 ZAL | No description on file | Cancelled | |
| 2007-09-04 | Building permit07 258711 | Reconstruct roof over 2nd floor front porch to existing 3 Unit - Converted house | Cancelled | |
| 2007-06-01 | Zoning review07 226724 ZAL | No description on file | Cancelled | |
| 2007-03-16 | Zoning review07 116420 ZPR | No description on file | Closed | |
| 2006-10-26 | Building permit06 186149 | Installation of 3 new windows, 2 north and one on south wall with fire shutter - additional charge for WNP | Closed | |
| 2005-03-11 | Building permit05 108889 | To enclose existing 2nd floor rear balcony. | Closed | |
| 2004-09-17 | Building permit04 170657 | To re-build front porch and two rear balconies on 2nd floor and 3rd floor,also to enclose basement walk-out at rear. | Closed | |
| 2003-07-29 | Building permit03 161235 | demolish existing detached garage at rear and erect new detached garage at rear | Cancelled | |
| 2002-01-23 | Building permit01 202623 | make interior alterations to basement and portion of 1st fl , also construct basement entrance at rear & uncovered platform at rear | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: in a Heritage Conservation District (Part V)
- Site-specific exception 900.2.10(900)
What this part means for this house, in plain EnglishUnlock
Heritage property: in a Heritage Conservation District (Part V)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.2.10(900)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage Register
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(900)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: garden suite
- Multiplex up to 6 units: likely fits
- Secondary suite: likely fits
What this part means for this house, in plain EnglishUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d1.0) (x900)
- Height limit
- 13 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 112 m²
- Back yard
- 19 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 2 development applications open within 300 m, up to 18 storeys
- In the Dupont station area
- 32 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
2 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Theft over $5,000: 2.5 times the Toronto median
- Break and enter: 2.2 times the Toronto median
- Assault: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Annex neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Dupont StationNearest station2 min walk
- Dupont St at Huron St West SideNearest TTC stop1 min walk
- St George StNearest cycling route3 min walk
- Waldorf Academy Elementary SchoolSchool5 min walk
- George Brown College - Casa Loma CampusSchool8 min walk
- The Mabin SchoolSchool8 min walk
- Huron Street Jr Public SchoolSchool9 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31080.9
- Robberycity median 69.580.5
- Homicidecity median 5.35.2
- Shootingscity median 10.55.2
- Auto theftcity median 192.6116.9
- Theft over $5,000city median 46.1114.3
- Break and entercity median 172.8387.1
- Theft from vehiclescity median 188.1220.9
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist