HousePrecheckCheck an address

2020 McNicoll AveToronto · zoning, lot size and permit records

98.2 × 92.3 m8,984 m²on McNicoll Ave

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 3 development applications open within 300 mNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
N50 m
98.2 m frontage92.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit20 196578Closed

    In conjunction with a multi-storey building on the premises, proposal to erect and display an illuminated wall sign, displaying static copy at the 1st floor on the west elevation.****MON SHEONG COMMUNITY& VOLUNTEER SERVICES CENTRE****

    Dec 3, 2020 · 2020 MCNICOLL AVE
  • Building permit15 195304Closed

    Proposal to install a premise isolation backflow preventer

    Aug 12, 2015 · 2020 MCNICOLL AVE
  • Building permit10 294704Closed

    **REVISION** To install another illuminated sign face on the previously approved ground sign on the east side near the entrance from McNicoll Ave. ** Mon Sheong Court ** and ** Mon Sheong Scarborough Long Term Care Centre **

    Jul 15, 2011 · 2020 MCNICOLL AVE
  • Building permit10 309888Closed

    To erect and display three illuminated wall signs at the first storey building wall, in conjunction with a new medical clinic located on the premises. **Mon Sheong Court Medical Centre**

    Dec 29, 2010 · 2020 MCNICOLL AVE
  • Building permit10 182671Closed

    install one new dental chair

    May 26, 2010 · 2020 MCNICOLL AVE
  • Building permit06 186927Closednew building

    11 storey seniors apartment (233 units)

    Apr 11, 2008 · 2020 MCNICOLL AVE
  • Building permit07 250347Closed

    site servicing

    Oct 5, 2007 · 2020 MCNICOLL AVE
  • Zoning review06 148479 PSPClosed
    Jun 20, 2006 · 2020 MCNICOLL AVE
Show 1 older records
  • Zoning review04 132006 PSPClosed
    May 6, 2004 · 2020 MCNICOLL AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
8,984 m²
Frontage
98.2 m
Depth
92.3 m
Street
McNicoll Ave
Corner lot
No
Public lane
None
House footprint
2,509 m²roof up to 38.8 m
Back yard
29.6 mhouse to rear lot line
Side yards
6 m and 15.2 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 8 City trees in front of this lot. The City's street tree inventory lists 8 trees at this address: linden, littleleaf (16 cm), linden, littleleaf (12 cm), tulip tree (9 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
67%2 of 3 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
6

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    Interior alterations to permit pet grooming services in Unit B8 in the existing one-storey building (Building B). NOTE: This application was previously deferred at the Committee of Adjustment Hearing on November 5, 2025.

    3101 KENNEDY RD · Nov 4, 2026 · 191 m away
  • Minor varianceApproved

    To construct two one-storey industrial buildings. Cross Reference Site Plan Approval Application No: 23 235666 ESC 22 SA. This application was rescheduled from the December 4, 2024 hearing.

    2075 MCNICOLL AVE · Jan 16, 2025 · 276 m away
  • Minor varianceApproved

    To permit a new non-residential development consisting of 5 buildings. Cross Reference Site Plan Approval Application No. 17 269557 ESC 39 SA.

    3101 KENNEDY RD · Nov 13, 2024 · 191 m away
  • Minor varianceApproved

    Permission for a personal service shop use.

    2150 MCNICOLL AVE · Nov 10, 2022 · 444 m away
  • Minor varianceApproved

    The owner is seeking relief from the Zoning By-law to utilize 646 m² of the basement level for various office and support uses. The existing structure is recently developed four storey, multi-use building with a total gross floor area of 5,740 m².

    300 SILVER STAR BLVD · Jul 23, 2020 · 470 m away

Latest activity nearby

  • Zoning review

    Application Acceptable

    3101 KENNEDY RD · Nov 24, 2026 · 191 m away
  • Building permit

    Proposal for interior alterations to fit out an existing vacant unit for use as a take out restaurant

    3101 KENNEDY RD · Nov 17, 2026 · 191 m away
  • Building permit

    DISCOUNT EXT DRAINAGE PIPE TO STORM DRAINAGE, RECONNECT DRAIN PIPE TO SANITARY DRAINAGE SYSTEM

    3101 KENNEDY RD · Nov 6, 2026 · 191 m away
  • Zoning review

    Not Started

    3101 KENNEDY RD · Nov 5, 2026 · 191 m away
  • Minor varianceRefused

    Interior alterations to permit pet grooming services in Unit B8 in the existing one-storey building (Building B). NOTE: This application was previously deferred at the Committee of Adjustment Hearing on November 5, 2025.

    3101 KENNEDY RD · Nov 4, 2026 · 191 m away
  • Building permit

    REVISION - revision is for adding 26 seats and a washroom.See also 26 197564 ZAPProposal to convert vacant unit into a coffee shop [Take-Out Restaurant (Retail) - no seating].

    3101 KENNEDY RD · Nov 4, 2026 · 191 m away
  • Building permit

    Proposed interior alterations change the empty unit to a commercial unit (Retail) and add a new universal washroom.

    3101 KENNEDY RD · Nov 3, 2026 · 191 m away
  • Building permit

    Demolish demising wall between unit D3 & D11 for new tennant - A Sweet Snacks and Drink.

    3101 KENNEDY RD · Oct 28, 2026 · 191 m away
  • Building permit

    Proposed interior alteration of restaurant less than 30 seats. HVAC & plumbing distribution and floor and ceiling finishes

    3101 KENNEDY RD · Oct 26, 2026 · 191 m away
  • Building permit

    Proposal to change the empty unit to a commercial unit, add a new universal washroom

    3101 KENNEDY RD · Oct 23, 2026 · 191 m away

Neighbourhood: Milliken

About the area around the lot, not the lot itself.

Nearest TTC stop
McNicoll Ave at Kennedy Rd1 min walk
Nearest cycling route
Finch Corridor TrlMulti-Use Trail, 1 min walk
Nearest traffic count
46,557 vehicles in 14 hKennedy Rd / McNicoll Ave, 100 m away, Jun 11, 2024
Serious collisions within 500 m
12021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
Parks
L'Amoreaux North Park1 min walk
L'Amoreaux Hydro4 min walk
Shepton Way Park8 min walk

Schools within 1 km

  • MARY WARD CATHOLIC SECONDARY SCHOOL English Separate 6 min walk
  • ST SYLVESTER CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk
  • KENNEDY PUBLIC SCHOOL English Public 14 min walk
  • SILVER SPRINGS PUBLIC SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMillikenMedian neighbourhood
Median household income (2020)$81,000$84,500
Households that own their home88%54%
Population (2021)23,98016,813
Homes built in 1960 or before2%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMillikenCity median
Assault334.2636.3
Robbery197.569.5
Shootings1910.5
Auto theft607.7192.6
Theft over $5,000125.346.1
Break and enter254.5172.8
Theft from vehicles398.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.