HousePrecheckCheck an address

202 Jarvis StToronto · zoning, lot size and permit records

Commercial residential · CR 4.0 (c2.0; r4.0) SS1 (x307)58.3 × 72.8 m3,826 m²on Jarvis St

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • 8 development applications open within 300 m, up to 60 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: CollegeThe City plans more homes around the station: good for transit, and more building over time.
N20 m
58.3 m frontage72.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 60 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Check before you build

  • Site-specific exception 900.11.10(307)

    Needs a closer look

    24 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(307)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands municipally known as 202 Jarvis Street and 160-166 Dundas Street East, in the year 2021, if the requirements of Section 6. and Schedule A of By-law 897-2021 are complied with, a building or structure containing a post-secondary school , student residence and non-residential uses, including uses ancillary to the foregoing uses, may be erected and used on the lot if in compliance with Regulations

  2. Rule B

    to (DD); (B) The lands to which this Exception applies comprise all the lands shown on Diagram 1 of By-law 897-2021

  3. Rule C

    Despite Regulation 40.10.40.40, the maximum permitted gross floor area on the lot is 58,000.0 square metres, of which a maximum of 19,500 square metres may be used for the purposes of a student residence

  4. Rule D

    In addition to the provisions of Regulation 40.5.40.40(3) the gross floor area of a mixed-use building is also reduced by the area of a building used for the purpose of a greenhouse

  5. Rule E

    The combined number of bed-sitting rooms and dwelling units must not exceed 625

  6. Rule F

    Despite Regulations 40.5.40.10(1) and (2), the height of a building or structure is the distance between the Canadian Geodetic Datum elevation of 90.0 metres (GVCD 1928 - Pre 1978) and the highest point of the building or structure

  7. Rule G

    Despite Regulations 40.5.40.10 (3), (4), (5), (6), (7) and (8) and 40.10.40.10(1), for those portions of the building above the finished ground surface, the permitted maximum height of each portion of a building or structure , is the height in metres as specified by the numbers following the HT symbol as shown on Diagram 3 of By-law 897-2021, with the exception of the following projections: (i) The structures and elements listed in (J) below; (ii) Parapets, structures for a green roof and sky lights to a maximum of 3.0 metres above the maximum permitted building height; (iii) Window washing equipment and structures for safety noise or wind attenuation purposes to a maximum of 3.5 metres above the maximum permitted building height; (iv) Lightning rods, antennae, aircraft warning lights, chimneys, ducts, vents, stacks and flues, mechanical screens and architectural screens to a maximum of 7.0 metres above the maximum permitted building height; (v) Despite iii. above, chimneys, vents, stacks, flues and air craft warning lights on the roof of that portion of the building subject to a height limit of 173.7 shown on Diagram 3 of By-law 897-2021 to a maximum of 9.5 metres above the maximum permitted building height; and (vi) Structures on a portion of the building subject to permitted building height of 74.9 metres or less, used for outdoor amenity space , open air recreation and greenhouse purposes, to a maximum of 5.5 metres above the maximum permitted building height

  8. Rule H

    For the purpose of this Exception the term established grade is the Canadian Geodetic Datum elevation of 90.0 metres (GVCD 1928 - Pre 1978)

  9. Rule I

    Despite Regulation 40.10.40.70 the minimum required building setbacks for the portion of a building or structure above the finished ground surface are shown on Diagram 3 of By-law 897-2021

  10. Rule J

    Despite Regulations 5.10.40.70(1), 40.5.40.60 and 40.10.40.60 and (I) above, the following elements of a building may encroach within a required building setback : (i) lighting fixtures, cornices, sills, eaves to a maximum projection of 0.5 metres into a required building setback ; (ii) elements located at or below a height of 8.0 metres above established grade : (a) Canopies and awnings to a maximum projection of 4.5 metres into a required building setback ; (b) planters, bollards, stairs, railings, safety railings, guards and guardrails, retaining walls, walls, bicycle parking facilities, light standards, lighting fixtures, wheel chair ramps, landscape features and art installations; and (iii) Structures , and elements permitted by (G) above

  11. Rule K

    The permitted maximum number of storeys in a building is the numerical value following the letters "ST" on Diagram 3 of By-law 897-2021 and the portion of a building used for the purpose of a greenhouse is not a storey

  12. Rule L

    The permitted maximum gross floor area of a storey located more than 76.0 metres above established grade is 750.0 square metres

  13. Rule M

    Despite Clause 40.10.40.50, amenity space is only required as follows: (i) a minimum of 2.0 square metres of indoor amenity space per bed-sitting room and per dwelling unit must be provided on the lot

  14. Rule N

    Despite Clause 200.5.10.1, Table 200.5.10.1 and Section 200.15 a minimum of 3 parking spaces must be provided on the lot and must comply with the following requirements for an accessible parking space : (i) An accessible parking space must have the following minimum dimensions: (a) length of 5.6 metres; (b) width of 3.4 metres; and (c) vertical clearance of 2.1 metres; (ii) The entire length of an accessible parking space must be adjacent to a 1.5 metres wide accessible barrier free aisle or path as shown on Diagram 1 and Diagram 2 of By-law 579-2017

  15. Rule O

    Regulation 40.10.40.1(1) does not apply with respect to the location of residential use portions of the building

  16. Rule P

    Regulation 40.10.40.1(2) does not apply with respect to the floor level of the first storey

  17. Rule Q

    Regulations 40.10.90.40(1) and (3) do not apply with respect to access to a loading space

  18. Rule R

    Regulation 40.10.100.10(1) does not apply with respect to vehicle access

  19. Rule S

    Regulation 200.5.1.10(12)(C) does not apply with respect to a vehicle entrance from the lot line

  20. Rule T

    Section 600.10 with respect to Building Setback Overlay District Map does not apply

  21. Rule U

    Section 600.20 with respect to Priority Retail Streets Overlay Map does not apply

  22. Rule V

    A mixed-use building also includes a building with a student residence and a non-residential use

  23. Rule W

    The provisions of this Exception respecting the height of any building or structure , including permitted exceptions, are subject to any further limitations as may be set out in a by-law passed under an agreement pursuant to Section 5.81 of the Aeronautics Act, R.S.C. 1985, c. A-2

  24. Rule X

    Despite any existing or future severance, partition or division of the lands shown on Diagram 1 of By-law 897-2021, the provisions of this Exception and By-law 569-2013, as amended, apply to the lands as one lot , as if no severance, partition or division occurred.

By-law 569-2013, Chapter 900

Lot facts

Area
3,826 m²
Frontage
58.3 m
Depth
72.8 m
Street
Jarvis St
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 4.0 (c2.0; r4.0) SS1 (x307) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
95%21 of 22 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
14
Development applications
41

Within 300 m, last 10 years. 14 suite and multiplex permits: more than at 81% of Toronto houses (median 3). 22 variance decisions: more than at 53% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.

    212 DUNDAS ST E · Jul 15, 2026 · 158 m away
  • Minor varianceApproved

    To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.

    134 JARVIS ST · Nov 12, 2025 · 377 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.

    53 MUTUAL ST · Oct 1, 2025 · 232 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.

    53 A MUTUAL ST · Oct 1, 2025 · 229 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).

    241 CHURCH ST · Jul 30, 2025 · 151 m away

Latest activity nearby

  • Zoning review

    Not Started

    319 GEORGE ST · Nov 26, 2026 · 268 m away
  • Building permit

    Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies

    145 MUTUAL ST · Nov 20, 2026 · 195 m away
  • Building permit

    Proposal for interior alterations of existing commercial unit to a medical clinic and prescription pharmacy with Level B compounding room.

    231 DUNDAS ST E · Nov 19, 2026 · 202 m away
  • Zoning review

    Closed

    78 MUTUAL ST · Oct 28, 2026 · 185 m away
  • Zoning review

    Not Started

    207 JARVIS ST · Oct 21, 2026 · 227 m away
  • Building permit

    Proposal for replacement of existing 1-1/2" Watts 375XL reduced pressure (RP) backflow prevention device serving existing high-rise condominium building. Device located in PH mechanical room.

    181 DUNDAS ST E · Oct 8, 2026 · 114 m away
  • Building permit

    Proposal to replace existing make-up air unit and associated structural reinforcement work.

    192 JARVIS ST · Oct 2, 2026 · 124 m away
  • Building permit

    Proposal to replace roof top mounted mechanical units.

    311 JARVIS ST · Oct 1, 2026 · 207 m away
  • Building permit

    Balcony Remedial work - Isolated conc. repair and brick masonry repair, Installation of new waterproofing system, Replace existing balcony guardrail with new.Convenience address is 279 Jarvis St

    257 JARVIS ST · Sep 25, 2026 · 71 m away
  • Building permit

    Proposal to replace existing make-up air unit and associated structural reinforcement work.

    192 JARVIS ST · Sep 16, 2026 · 124 m away

Neighbourhood: Downtown Yonge East

About the area around the lot, not the lot itself.

Nearest station
TMU Station7 min walk
Nearest TTC stop
Dundas St East at Jarvis St1 min walk
Nearest cycling route
Shuter StCycle Track, 4 min walk
Nearest traffic count
11,150 vehicles in 8 hDundas St E / Jarvis St, 80 m away, Dec 3, 2022
Serious collisions within 500 m
232021–2026, killed or seriously injured: 3 fatal, 18 with pedestrians, 3 with cyclists
Parks
Arena Gardens2 min walk
45 Dalhousie St Park5 min walk
Moss Park5 min walk

Schools within 1 km

  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 3 min walk
  • TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 4 min walk
  • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 4 min walk
  • ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 5 min walk
  • ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 5 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 5 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDowntown Yonge EastMedian neighbourhood
Median household income (2020)$69,500$84,500
Households that own their home36%54%
Population (2021)17,70016,813
Homes built in 1960 or before7%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDowntown Yonge EastCity median
Assault2360.8636.3
Robbery143.369.5
Shootings11.910.5
Auto theft75.6192.6
Theft over $5,00099.546.1
Break and enter274.7172.8
Theft from vehicles390.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.