HousePrecheckCheck an address

201 Guildwood PkwyToronto · zoning, lot size and permit records

Also 191 Guildwood Pkwy, 215 Guildwood Pkwy, 241 Guildwood Pkwy

≈ 445.7 × 573.2 m171,546 m²on Guildwood Pkwycorner, also on Navarre Cres

Not a home

Guild Park And Gardens

The City of Toronto's real estate inventory lists Guild Park And Gardens here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 26 115118 (Proposal to install a temporary seasonal event tent from May 1, 2026 to October 31, 202..., 2026); 26 235540 (Restoration of Guild Park Log Cabin, which will include: Replacement of the foundation..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
N50 m
≈ 445.7 m frontage≈ 573.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • TRCA regulated area (60% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (65% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Environmentally Significant Area: Guild Woods

    Needs a closer look

    The lot touches an Environmentally Significant Area shown on Official Plan Map 12.

    What it means. Development in or next to the area needs an impact study and may be limited.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 12
  • 3 building permits open, the oldest since 2012

    Needs a closer look

    Still open in the City's records: 16 247753 (REV 01: Revision to the Site servicing drawingsProposal to change the sanitary piping,..., 2017, status Revision Issued); 16 237530 (BUILDING A: NEW ONE STOREY GARAGE (48.8M2). BUILDING B: ALTERATION/REPAIR (94.74M2) BUI..., 2016, status Permit Issued); 12 156957 (Replace roof, structural, windows and garage doors plus re-roof section of greenhouse, 2012, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (78% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 115118 (Proposal to install a temporary seasonal event tent from May 1, 2026 to October 31, 202..., 2026); 26 235540 (Restoration of Guild Park Log Cabin, which will include: Replacement of the foundation..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

32 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review26 257378 ZAPNot Started
    Oct 20, 2026 · 201 GUILDWOOD PKWY
  • Building permit26 235540Examiner's Notice Sent

    Restoration of Guild Park Log Cabin, which will include: Replacement of the foundation and flooring, stabilization and restoration of the existing log walls, restoration of wood windows and doors, deteriorated brick replacement and repointing of fireplace and chimney, repairs to interior wood millwork, repairs to wood shingle roof and gable side boards. Additional to the architectural restoration is upgrading of electrical and lighting infrastructure, water supply infrastructure and landscaping of surrounding area.

    Sep 10, 2026 · 201 GUILDWOOD PKWY
  • Building permit26 115118Inspection

    Proposal to install a temporary seasonal event tent from May 1, 2026 to October 31, 2026. The Guild Inn.

    Feb 25, 2026 · 201 GUILDWOOD PKWY
  • By-law investigation25 158444 GRA 00 IRClosed

    Graffiti

    May 12, 2025 · 201 GUILDWOOD PKWY
  • Building permit25 103275Closed

    Proposal to install a temporary seasonal tent for a private event from May 1, 2025 to October 31, 2025 - Guild Inn Estate

    Jan 22, 2025 · 201 GUILDWOOD PKWY
  • Building permit24 119051Closed

    Proposal to install a temporary seasonal tent for a private event from May 1, 2024 to October 31, 2024 - Guild Inn Estate

    Mar 12, 2024 · 201 GUILDWOOD PKWY
  • Building permit23 105787Closed

    Installation of a seasonal/removable event tent from May 1, 2023 - October 31, 2023 - Guild Inn Estate

    Jan 31, 2023 · 201 GUILDWOOD PKWY
  • Building permit22 157954Closed

    Installation of a seasonal/removable event tent from May 1, 2022 - October 31, 2022

    Jun 24, 2022 · 201 GUILDWOOD PKWY
Show 24 older records
  • Building permit21 125597Closed

    Installation of a seasonal/removable event tent

    Mar 19, 2021 · 201 GUILDWOOD PKWY
  • Building permit21 121429Closed

    Proposal to construct a roof canopy over the open air terrace of an existing banquet hall.

    Mar 19, 2021 · 201 GUILDWOOD PKWY
  • Building permit18 229229Closed

    Rev 01: Revision to ULC fire rated assembly for floor type 1 from ULC F804 to ULC F920

    Sep 9, 2020 · 191 GUILDWOOD PKWY
  • Building permit18 230805Closed

    Proposal to restore the existing sculptors cabin at The Guild Inn Estate, scope of work includes new painting, new millwork, repair windows, new plumbing and electrical.

    Oct 29, 2018 · 201 GUILDWOOD PKWY
  • Zoning review17 232793 PSPClosed
    Apr 10, 2018 · 191 GUILDWOOD PKWY
  • Development application17 232793 ESC 43 SAClosed

    Proposed 3rd storey addition to the existing building to create the new Guild Park and Gardens Arts and Cultural Facility (Clark Centre for the Arts).

    Sep 14, 2017 · 191 GUILDWOOD PKWY · City file
  • Zoning review17 207275 ZZCClosed
    Jul 28, 2017 · 191 GUILDWOOD PKWY
  • Building permit16 247753Revision Issued

    REV 01: Revision to the Site servicing drawingsProposal to change the sanitary piping, storm piping, fire line, domestic water service, 5 catch basins, 23 manholes, and 2 backflow prevention devices.

    Mar 1, 2017 · 191 GUILDWOOD PKWY
  • Building permit16 237530Permit Issued

    BUILDING A: NEW ONE STOREY GARAGE (48.8M2). BUILDING B: ALTERATION/REPAIR (94.74M2) BUILDING C: REPAINTING ONLY. NEW ASPHALT IN COMPOUND.

    Nov 29, 2016 · 201 GUILDWOOD PKWY
  • Building permit15 239795Closed

    GOLDSTARHVAC - Iinterior alterations of the Guild Inn to accommodate restaurant and office uses. The new banquet facility would be 2,081 square metres (22,404 square feet) in size and located west of the Guild Inn building, while the new ceremonial building would be approximately 389 square metres (4,187 square feet) in size and constructed to the east.

    Jun 8, 2016 · 201 GUILDWOOD PKWY
  • Zoning review16 137736 ZZUClosed
    Apr 8, 2016 · 201 GUILDWOOD PKWY
  • Building permit15 118770Closeddemolition

    partial demolition of banquet hall, east & west wings of former "Guild Inn"

    Jul 28, 2015 · 191 GUILDWOOD PKWY
  • Zoning review14 157782 PSPClosed
    Mar 23, 2015 · 191 GUILDWOOD PKWY
  • Development application14 154257 ESC 43 SAClosed

    The interior of the Guild Inn would be adaptively reused to accommodate restaurant and office uses. Additions added to the building over time would be removed, and the exterior would be restored to its 1932 appearance. The new banquet facility would be 2,081 square metres (22,404 square feet) in size and located west of the Guild Inn building, while the new ceremonial building would be approximately 389 square metres (4,187 square feet) in size and constructed to the east. Approximately 300 parking spaces are proposed (which include both existing and new spaces).

    May 9, 2014 · 191 GUILDWOOD PKWY
  • Building permit12 156957Inspection

    Replace roof, structural, windows and garage doors plus re-roof section of greenhouse

    May 11, 2012 · 191 GUILDWOOD PKWY
  • Building permit08 232094Closeddemolition

    demolition existing building

    Apr 15, 2009 · 191 GUILDWOOD PKWY
  • Building permit09 103523Closeddemolition

    DEMOLISH STUDIO BUILDING FROM FIRE DAMAGE

    Jan 23, 2009 · 201 GUILDWOOD PKWY
  • Building permit08 158599Closed

    Certified tent-06-118714 - 60' x 40' Tents for one day symposium- one for food, one for stage

    May 28, 2008 · 191 GUILDWOOD PKWY
  • Building permit06 110559Closed

    HVAC - TEMP TRAILER (WASHROOMS) GUILD INN -2006 - Trailers

    May 9, 2006 · 191 GUILDWOOD PKWY
  • Building permit05 109646Cancelled

    HVAC - TEMP TRAILER (WASHROOMS) GUILD INN - Trailers

    Feb 17, 2005 · 191 GUILDWOOD PKWY
  • Building permit04 112552Closed

    HVAC - TEMP TRAILER (WASHROOMS) GUILD INN - Trailers

    Mar 11, 2004 · 191 GUILDWOOD PKWY
  • Building permit03 121526Closed

    HVAC - TEMP TRAILER (WASHROOMS) GUILD INN - Trailers

    May 16, 2003 · 191 GUILDWOOD PKWY
  • Building permit02 131878Closed

    HVAC - TEMP TRAILER (WASHROOMS) GUILD INN - Trailers

    May 29, 2002 · 191 GUILDWOOD PKWY
  • Building permit02 131876Cancellednew building

    TEMPORARY TRAILER (WASHROOMS) FOR GUILD INN

    May 1, 2002 · 191 GUILDWOOD PKWY

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
171,546 m²
Frontage
445.7 mestimated, irregular lot
Depth
573.2 mestimated, irregular lot
Street
Guildwood Pkwy
Corner lot
Yes, also on Navarre Cres573.2 m along it
Public lane
None
House footprint
2,790 m²
Back yard
357.9 mhouse to rear lot line
Side yards
64.7 m and 299.2 mhouse to side lot lines
Buildings on the lot
7house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 14 City trees in front of this lot. The City's street tree inventory lists 14 trees at this address: ash, white (72 cm), ash, white (71 cm), ash, green (63 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To demolish the existing dwelling and to construct a new two storey detached dwelling.

    228 GUILDWOOD PKWY · Sep 18, 2024 · 302 m away
  • Minor varianceApproved

    To construct a rear/side addition and a rear deck to the existing one storey dwelling.

    96 TOYNBEE TRL · Apr 3, 2024 · 485 m away
  • Minor varianceApproved

    To construct a rear yard sunroom addition to existing dwelling.

    260 GUILDWOOD PKWY · Feb 10, 2022 · 378 m away
  • Minor varianceApproved

    To permit an additional variance for the dwelling currently under construction. A previous Committee of Adjustment decision (A0121/17SC) approved variances for front main wall height, side yard setback and rear deck projection.

    4 CADBURY CRT · Feb 15, 2018 · 472 m away
  • Minor varianceApproved

    To construct a second storey addition over the existing detached dwelling.

    4 CADBURY CRT · Jun 22, 2017 · 472 m away

Latest activity nearby

  • Zoning review

    Not Started

    201 GUILDWOOD PKWY · Oct 20, 2026 · 119 m away
  • Building permit

    Restoration of Guild Park Log Cabin, which will include: Replacement of the foundation and flooring, stabilization and restoration of the existing log walls, restoration of wood windows and doors, deteriorated brick replacement and repointing of fireplace and chimney, repairs to interior wood millwork, repairs to wood shingle roof and gable side boards. Additional to the architectural restoration is upgrading of electrical and lighting infrastructure, water supply infrastructure and landscaping of surrounding area.

    201 GUILDWOOD PKWY · Sep 10, 2026 · 119 m away
  • Building permit

    Proposal to install a temporary seasonal event tent from May 1, 2026 to October 31, 2026. The Guild Inn.

    201 GUILDWOOD PKWY · Feb 25, 2026 · 119 m away
  • Building permit

    Proposal to install a temporary seasonal tent for a private event from May 1, 2025 to October 31, 2025 - Guild Inn Estate

    201 GUILDWOOD PKWY · Jan 22, 2025 · 119 m away
  • Building permit

    Proposal to install a temporary seasonal tent for a private event from May 1, 2024 to October 31, 2024 - Guild Inn Estate

    201 GUILDWOOD PKWY · Mar 12, 2024 · 119 m away
  • Building permit

    Installation of a seasonal/removable event tent from May 1, 2023 - October 31, 2023 - Guild Inn Estate

    201 GUILDWOOD PKWY · Jan 31, 2023 · 119 m away
  • Building permit

    Installation of a seasonal/removable event tent from May 1, 2022 - October 31, 2022

    201 GUILDWOOD PKWY · Jun 24, 2022 · 119 m away
  • Building permit

    Installation of a seasonal/removable event tent

    201 GUILDWOOD PKWY · Mar 19, 2021 · 119 m away
  • Building permit

    Proposal to construct a roof canopy over the open air terrace of an existing banquet hall.

    201 GUILDWOOD PKWY · Mar 19, 2021 · 119 m away
  • Building permit

    Rev 01: Revision to ULC fire rated assembly for floor type 1 from ULC F804 to ULC F920

    191 GUILDWOOD PKWY · Sep 9, 2020 · 182 m away

Neighbourhood: Guildwood

About the area around the lot, not the lot itself.

Nearest station
Guildwood Station17 min walk
Nearest TTC stop
Guildwood Pkwy at Guild Park and Gardens East Side5 min walk
Nearest cycling route
Waterfront TrlMulti-Use Trail, 2 min walk
Nearest traffic count
3,531 vehicles in 8 hGalloway Rd / Guildwood Pkwy / Guildwood Park Trl, 370 m away, Oct 22, 2014
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Guild Park and Gardens1 min walk
Livingston Road Park South8 min walk
Guildwood Village Park11 min walk

Schools within 1 km

  • SIR WILFRID LAURIER & NATIVE LEARNING CTR EAST English Public 7 min walk
  • JACK MINER SR PUBLIC SCHOOL English Public 8 min walk
  • ST URSULA CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
  • GUILDWOOD JR PUBLIC SCHOOL English Public 13 min walk
  • POPLAR ROAD JR PUBLIC SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureGuildwoodMedian neighbourhood
Median household income (2020)$102,000$84,500
Households that own their home78%54%
Population (2021)9,68016,813
Homes built in 1960 or before24%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleGuildwoodCity median
Assault399.4636.3
Robbery55.769.5
Shootings18.610.5
Auto theft74.3192.6
Theft over $5,00027.946.1
Break and enter55.7172.8
Theft from vehicles204.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.