HousePrecheckCheck an address

2001 Bloor St WToronto · zoning, lot size and permit records

Residential detached · RD (f12.0; d0.35) (x961)≈ 55.7 × 68.2 m3,175 m²on Ellis Park Rdcorner, also on Bloor St Wbacks onto Hush Lane

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 60 rental units, built 1930More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 18 153322 (Proposed Backflow Prevention Devices (Water only), 2018, status Inspection); 17 204718 (Balcony repairs (11) and railings, 2017, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 m, up to 8 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
  • City upkeep score: 94 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: RunnymedeThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
≈ 55.7 m frontage≈ 68.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Cultural Heritage Evaluation Report required

    Needs a closer look

    This property is listed under Official Plan Amendment 720: a heritage evaluation is needed before redevelopment.

    What it means. Plans to tear down or rebuild will need a heritage evaluation first.

    How to confirm. Heritage Planning at the City confirms the status. Details

    Official Plan Amendment 720
  • TRCA regulated area (49% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (37% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • 2 building permits open, the oldest since 2017

    Needs a closer look

    Still open in the City's records: 18 153322 (Proposed Backflow Prevention Devices (Water only), 2018, status Inspection); 17 204718 (Balcony repairs (11) and railings, 2017, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (10% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 6 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 205374 PRS 00 IV (Order Issued Property Standards: A window in a stairway that extends to less than 1,070..., 2026); 26 205112 PRS 00 IR (Property Standards, 2026); 26 171632 000 00 IR (Adequate Heat, 2026); and 3 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 8 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 94 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (4 storeys, 60 units, built 1930).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 205374 PRS 00 IVClosed

    Order Issued Property Standards: A window in a stairway that extends to less than 1,070 millimetres above the landing is protected by a guard that is less than 1,070 millimetres high measured t; Handrails on both sides of stair or ramp 1,100mm in width or more not provided. Namely, the stairwells require 2 handrails.

    Jul 20, 2026 · 2001 BLOOR ST W
  • By-law investigation26 205112 PRS 00 IRClosed

    Property Standards

    Jul 20, 2026 · 2001 BLOOR ST W
  • By-law investigation26 171632 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 2001 BLOOR ST W
  • By-law investigation26 171631 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 2001 BLOOR ST W
  • By-law investigation25 265471 HEA 00 IRClosed

    Adequate Heat

    Dec 11, 2025 · 2001 BLOOR ST W
  • By-law investigation25 141734 PRS 00 IRClosed

    Property Standards

    Apr 8, 2025 · 2001 BLOOR ST W
  • By-law investigation25 122672 WST 00 IRClosed

    Waste

    Feb 27, 2025 · 2001 BLOOR ST W
  • Building permit18 153322Inspection

    Proposed Backflow Prevention Devices (Water only)

    May 8, 2018 · 2001 BLOOR ST W
Show 2 older records
  • Building permit17 204718Inspection

    Balcony repairs (11) and railings

    Jul 26, 2017 · 2001 BLOOR ST W
  • Building permit13 264873Closed

    To repair and/or construct various balconies on existing residential apartment building

    Nov 20, 2013 · 2001 BLOOR ST W

Check before you build

  • Site-specific exception 900.3.10(961)

    Needs a closer look

    2 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.3.10(961)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Despite regulation 10.5.40.60(1), in a front yard or rear yard , a platform with a floor higher than the first floor of the building above established grade may not encroach into the required yard setback. [TO: 438-86; 6(3) Part II, 8. K.]

  2. Rule B

    Parking Access to a lot abutting a lane or flanking street must be from the lane or flanking street .

1 part for other addresses
  • A On the lands municipally known as 380, 382, 384, 386 Rosewell Ave. and part of 1451 Avenue Rd. in 1988, Section 12(1)8 of former City of Toronto By-law 438-86.
By-law 569-2013, Chapter 900

Lot facts

Area
3,175 m²
Frontage
55.7 mestimated, irregular lot
Depth
68.2 mestimated, irregular lot
Street
Ellis Park Rd
Corner lot
Yes, also on Bloor St W68.2 m along it
Public lane
Hush Lane, 3.7 m along it
House footprint
1,525 m²roof up to 16 m
Back yard
1.1 mhouse to rear lot line
Side yards
3.8 m and 5.5 mhouse to side lot lines
Buildings on the lot
10house, garage, sheds
Max height
14 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Runnymede. The lot is inside the Runnymede Major Transit Station Area approved by the Province (Site and Area Specific Policy 651). Source
  • Swansea Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Minimum frontage 12 m. Frontage is about 55.7 m (estimated, irregular lot): meets the zone minimum. Source
  • Zone RD (f12.0; d0.35) (x961) (Residential Detached). Chapter 10, section 10.20 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: tree of heaven (23 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
96%24 of 25 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
1
Development applications
2

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 25 variance decisions: more than at 57% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new three-storey detached dwelling with green roof, a front two-car integral garage, a front cantilevered terrace with stairs, front second storey and rear first storey green roof canopies, a rear basement walkout, a rear first floor deck with an integral hot tub and stairs, and front and rear third storey balconies. There will be one secondary suite within the basement.

    80 ELLIS PARK RD · Mar 4, 2026 · 235 m away
  • Minor varianceApproved

    The current application is necessitated to identify a revised side yard setback to the detached dwelling (as cited in Variance Number 1 below). To construct a new three-storey detached dwelling with a front ground covered deck with stairs, a front integral garage, two front second storey balconies (with planters), a rear second storey balcony (with planters), a front third storey balcony, and two rear third storey balconies (with planters) as approved by Minor Variance Decision A0789/23TEY.

    14 DACRE CRES · Feb 28, 2024 · 278 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling with a front integral garage, a front covered porch and stairs, a rear ground floor covered porch and stairs, front balconies on the second and third storeys, as well as rear second storey Juliet balconies.

    76 ELLIS PARK RD · Nov 22, 2023 · 259 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling with a front staircase, a front ground floor deck with stairs, an integral garage with a ramp up entry, two front second storey balconies, a front second storey platform with planter, a front third storey balcony, a rear second storey balcony, a rear platform with planter along the second storey, two rear third storey balconies, and two rear third storey platforms with planter.

    14 DACRE CRES · Nov 8, 2023 · 278 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey detached dwelling by constructing a partial rear one-storey addition, a partial rear second storey addition over a rear ground floor deck, and a rear second storey deck.

    84 ELLIS PARK RD · Aug 16, 2023 · 210 m away

Latest activity nearby

  • Zoning review

    Application On Hold

    2187 BLOOR ST W · Nov 17, 2026 · 278 m away
  • Building permit

    3 wall signs.***NO FRILLS***

    2187 BLOOR ST W · Nov 17, 2026 · 278 m away
  • Building permit

    1 Wall Sign****Jeff De Bruges****

    2184 BLOOR ST W · Nov 2, 2026 · 253 m away
  • Building permit

    3 Wall Sign*****NO FRILLS*****

    2187 BLOOR ST W · Oct 28, 2026 · 278 m away
  • Building permit

    1 Wall Sign****Jeff De Bruges****

    2184 BLOOR ST W · Oct 27, 2026 · 253 m away
  • Zoning review

    Notice Sent

    1990 BLOOR ST W · Oct 2, 2026 · 233 m away
  • Building permit

    Proposed Underpinning to increase the height of the basement

    53 KENNEDY PARK RD · Sep 11, 2026 · 275 m away
  • Building permit

    REVISION-01Proposal to lower basement, new basement washrooms, laundry room, wet bar.

    36 GLENDONWYNNE RD · Aug 24, 2026 · 287 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 107-2015(OMB)), for the existing 11-storey mixed-use building, by permitting clinic and office uses (physician(s) and healthcare practitioner(s)), to be located on a portion of the first level. There is a total of 104 residential dwelling units on this lot.

    1990 BLOOR ST W · Aug 12, 2026 · 233 m away
  • Building permit

    Proposal to construct a rear yard 3-season unheated enclosure addition over an existing rear deck and alteration of the rear first-floor wall to widen the existing opening for a new sliding glass door system.

    59 KENNEDY PARK RD · Jul 17, 2026 · 286 m away

Neighbourhood: High Park-Swansea

About the area around the lot, not the lot itself.

Nearest station
High Park Station5 min walk
Nearest TTC stop
Bloor St West at Clendenan Ave2 min walk
Nearest cycling route
Bloor St WCycle Track, 1 min walk
Nearest traffic count
11,824 vehicles in 8 hBloor St W / Kennedy Park Rd, 60 m away, Jan 23, 2020
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
Parks
Kennedy - Margdon Parkette2 min walk
High Park2 min walk
Parkview Gardens Parkette3 min walk

Schools within 1 km

  • HUMBERSIDE MONTESSORI SCHOOL Private 5 min walk
  • URSULA FRANKLIN ACADEMY English Public 10 min walk
  • THE STUDENT SCHOOL English Public 10 min walk
  • WESTERN TECHNICAL COMMERCIAL SCHOOL English Public 11 min walk
  • RUNNYMEDE JR & SR PUBLIC SCHOOL English Public 11 min walk
  • ERUDITE ELEMENTARY SCHOOL Private 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHigh Park-SwanseaMedian neighbourhood
Median household income (2020)$101,000$84,500
Households that own their home60%54%
Population (2021)22,66516,813
Homes built in 1960 or before54%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHigh Park-SwanseaCity median
Assault465.8636.3
Robbery46.669.5
Shootings7.810.5
Auto theft89.3192.6
Theft over $5,00023.346.1
Break and enter229172.8
Theft from vehicles128.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.