HousePrecheckCheck an address

200 Woolner AveToronto · zoning, lot size and permit records

Residential apartment commercial · RAC (x145)≈ 91.9 × 211.8 m14,953 m²on Woolner Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 16 storeys, 304 rental units, built 1968More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • City upkeep score: 86 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
≈ 91.9 m frontage≈ 211.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (16% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (12% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (4% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 7 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 246442 PRS 00 IR (Property Standards, 2026); 26 222491 PRS 00 IR (Property Standards, 2026); 26 173608 000 00 IR (Adequate Heat, 2026); and 4 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Rental building evaluation: 86 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (16 storeys, 304 units, built 1968).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 246442 PRS 00 IRClosed

    Property Standards

    Sep 29, 2026 · 200 WOOLNER AVE
  • By-law investigation26 222491 PRS 00 IRClosed

    Property Standards

    Aug 19, 2026 · 200 WOOLNER AVE
  • By-law investigation26 173608 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 200 WOOLNER AVE
  • By-law investigation26 173607 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 200 WOOLNER AVE
  • By-law investigation25 200870 PRS 00 IRClosed

    Property Standards

    Jul 27, 2025 · 200 WOOLNER AVE
  • By-law investigation25 169100 WST 00 IRClosed

    Waste

    May 31, 2025 · 200 WOOLNER AVE
  • By-law investigation25 108247 PRS 00 IRClosed

    Property Standards

    Jan 23, 2025 · 200 WOOLNER AVE
  • By-law investigation24 250515 PRS 00 IRClosed

    Property Standards

    Dec 15, 2024 · 200 WOOLNER AVE
Show 2 older records
  • Building permit21 251163Closed

    Porposal to install a Backflow Preventer for Premise Isolation

    Jan 19, 2022 · 200 WOOLNER AVE
  • Zoning review13 245649 ZSVClosed
    Oct 3, 2013 · 200 WOOLNER AVE

Check before you build

  • Site-specific exception 900.8.10(145)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.8.10(145)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 16(129) of the former City of York Zoning By-law No. 1-83.

By-law 569-2013, Chapter 900

Lot facts

Area
14,953 m²
Frontage
91.9 mestimated, irregular lot
Depth
211.8 mestimated, irregular lot
Street
Woolner Ave
Corner lot
No
Public lane
None
House footprint
1,807 m²roof up to 56.7 m
Back yard
108.2 mhouse to rear lot line
Side yards
8.4 m and 14 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
24 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone RAC (x145) (Residential Apartment Commercial). Chapter 15, section 15.20 of the by-law. Source

Around this lot

Minor variances approved
100%4 of 4 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
1
Development applications
0

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Install back water valve

    21 HANDEL ST · Aug 17, 2026 · 290 m away
  • Building permitsecondary suite

    Proposal for multiple projects including a ground & second-floor rear addition, interior alterations, and second suite in existing basement.See also 25-159305 ZAP 00 ZR

    67 CORBETT AVE · Aug 5, 2026 · 280 m away
  • Building permit

    Proposal for replacement of two makeup air units and ten exhaust fans, complete with all associated electrical and structural work to support the new equipment.

    190 WOOLNER AVE · Feb 5, 2026 · 94 m away
  • Building permit

    Isolated concrete and waterproofing repairs of the underground garage roof slab, intermediate slab & foundation walls.

    190 WOOLNER AVE · Nov 7, 2025 · 94 m away
  • Building permit

    Proposal for multiple projects (basement underpinning, walk out stair and interior alterations).

    108 CORBETT AVE · Oct 23, 2025 · 262 m away
  • Building permit

    Proposal for a party wall admin permit for work relating to adjacent property (108 Corbett Ave).

    106 CORBETT AVE · Oct 16, 2025 · 260 m away
  • Zoning review

    Closed

    814 JANE ST · Aug 11, 2025 · 267 m away
  • Building permitsecondary suite

    Proposal to construct a second and third floor balcony.

    58 CORBETT AVE · Jun 8, 2025 · 243 m away
  • Zoning review

    Application On Hold

    67 CORBETT AVE · May 14, 2025 · 280 m away
  • Minor varianceApproved

    To maintain the existing second storey front platform.

    58 CORBETT AVE · Apr 17, 2025 · 243 m away

Neighbourhood: Rockcliffe-Smythe

About the area around the lot, not the lot itself.

Nearest station
Mount Dennis Station28 min walk
Nearest TTC stop
Jane St at Woolner Ave4 min walk
Nearest cycling route
Black Creek TrlMulti-Use Trail, 3 min walk
Nearest traffic count
19,056 vehicles in 14 hJane St / Ellins Ave, 210 m away, Nov 12, 2024
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 1 with cyclists
Parks
Black Creek Site West2 min walk
Woolner Park2 min walk
Marie Baldwin Park4 min walk

Schools within 1 km

  • ROCKCLIFFE MDL SCHOOL English Public 4 min walk
  • GEORGE SYME COMMUNITY SCHOOL English Public 7 min walk
  • FRANK OKE SECONDARY SCHOOL English Public 9 min walk
  • THE HANEY CENTRE SCHOOL English Public 10 min walk
  • CORDELLA JR PUBLIC SCHOOL English Public 12 min walk
  • LAMBTON PARK COMMUNITY SCHOOL English Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRockcliffe-SmytheMedian neighbourhood
Median household income (2020)$69,000$84,500
Households that own their home56%54%
Population (2021)22,23516,813
Homes built in 1960 or before45%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRockcliffe-SmytheCity median
Assault742.7636.3
Robbery74.769.5
Shootings16.610.5
Auto theft157.7192.6
Theft over $5,00037.346.1
Break and enter132.8172.8
Theft from vehicles224188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.