Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: listed
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage RegisterBuilding permit open since 2017
Needs a closer lookStill open in the City's records: 16 271832 (Installation of maglocks for 2 emergency doors, 2017, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)9 development applications open within 300 m
Good to know9 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 64 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
5 records on file: more than at 93% of Toronto houses (median 0).
- Building permit16 271832Inspection
Installation of maglocks for 2 emergency doors.
Feb 3, 2017 · 202 ST PATRICK ST - Zoning review09 185638 LPRClosedNov 5, 2009 · 200 ST PATRICK ST
- Zoning review05 130025 ZPRClosedMay 6, 2005 · 200 ST PATRICK ST
- Building permit03 111479Closed - Dormant
Alter existing-install new high efficiency furnace to existing system.
Mar 13, 2003 · 200 ST PATRICK ST - Zoning review88 030757 LTOClosedOct 21, 1988 · 200 ST PATRICK ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 2,272 m²
- Frontage
- 59.8 m
- Depth
- 38.2 m
- Street
- St Patrick St
- Corner lot
- No
- Public lane
- None
- House footprint
- 707 m²roof up to 80.6 m
- Back yard
- 0.1 mhouse to rear lot line
- Side yards
- 0 m and 39.4 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 2house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: horsechestnut (59 cm), horsechestnut (56 cm), elm, siberian (14 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%20 of 20 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 14
- Development applications
- 27
Within 300 m, last 10 years. 14 suite and multiplex permits: more than at 81% of Toronto houses (median 3). 20 variance decisions: more than at 51% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing rear two-storey detached ancillary building (containing one laneway suite and a two-car garage, abutting the laneway) by constructing a one-storey addition (patio enclosure) on the south side of this building. There is a total of two residential dwelling units on this lot (one unit within the main building and one unit within the ancillary building).
122 D'ARCY ST · Jul 15, 2026 · 495 m away - Minor varianceApproved
To alter the parking length standard for one residential parking space (Unit 11) on Parking Level 1 of the 32-storey mixed-use building, containing three levels of below grade parking.
292 DUNDAS ST W · Mar 4, 2026 · 83 m away - Minor varianceApproved
To construct a new three-storey detached dwelling (sixplex) with a covered front porch and stairs, a front basement walkout, a rear basement walkout, as well as rear first storey, second storey and third storey balconies with stairs. There will be a total of six dwelling units on the lot.
28 GRANGE AVE · Feb 4, 2026 · 416 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).
130 ELIZABETH ST · Jan 14, 2026 · 426 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by converting the existing office space (Unit 1 located within the basement at the southern portion of the building) into medical office space with accessory uses.
150 BEVERLEY ST · Nov 19, 2025 · 300 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever a portion of land for the purpose of a lot addition, and to create and maintain easements/rights-of-way.
317 DUNDAS ST W · Dec 16, 2026 · 231 m away - Consent (lot split)Pending
To obtain consent to sever a portion of land for the purpose of a lot addition, and to create and maintain easements/rights-of-way.
100 MCCAUL ST · Dec 16, 2026 · 250 m away - Zoning review
Application On Hold
522 UNIVERSITY AVE · Nov 24, 2026 · 150 m away - Building permit
Proposed interior alteration of the exisitng CATH Lab room on floor 16 of the building and replacement of the existing equipment.
600 UNIVERSITY AVE · Nov 19, 2026 · 257 m away - Building permit
Interior alteration to existing office space (Unit 2200)
400 UNIVERSITY AVE · Nov 18, 2026 · 289 m away - Building permit
Interior alterations, HVAC & plumbing. Conversion of existing Heydon Park Secondary School to elementary school.
70 D'ARCY ST · Nov 10, 2026 · 287 m away - Building permit
Interior renovation project to update architectural finishes in the fourth floor ambulatory corridor. Architectural new works involve new rubber sheet flooring, painting and installing ceiling tiles. Demolition scope involves removal of existing floor and wall finishes, ceiling tiles and lights.
600 UNIVERSITY AVE · Nov 10, 2026 · 257 m away - Building permit
Proposed replacement of hot water recirculation lines.
96 ST PATRICK ST · Nov 9, 2026 · 253 m away - Zoning review
Not Started
300 SIMCOE ST · Nov 6, 2026 · 116 m away - Building permit
Mechanical retrofit to improve building energy efficiency including working in various building mechanical rooms and roofs on the chilled water, heating water, and glycol piping networks. Some new equipment will be installed including a an air source heat pump, heat recovery chiller, and fan coil units.
500 UNIVERSITY AVE · Nov 5, 2026 · 149 m away
Neighbourhood: Kensington-Chinatown
About the area around the lot, not the lot itself.
- Nearest station
- St Patrick Station4 min walk
- Nearest TTC stop
- Dundas St West at McCaul St2 min walk
- Nearest cycling route
- University AveCycle Track, 3 min walk
- Nearest traffic count
- 15,018 vehicles in 14 hDundas St W / St Patrick St, 100 m away, Oct 9, 2025
- Serious collisions within 500 m
- 42021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 1 with cyclists
- Parks
- Gallery Park1 min walk
- Grange Park4 min walk
- McCaul - Orde Parkette4 min walk
Schools within 1 km
- OCAD UNIVERSITY - ROSALIE SHARP PAVILION University 2 min walk
- OCAD UNIVERSITY - ANNEX BUILDING University 2 min walk
- CONTACT ALTERNATIVE SCHOOL English Public 3 min walk
- OCAD UNIVERSITY - THE LEARNING ZONE University 3 min walk
- OCAD UNIVERSITY - MAIN BUILDING 416 977-6000 University 4 min walk
- CORNERSTONE PREPARATORY SCHOOL - MAIN CAMPUS Private 4 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Kensington-Chinatown | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $62,000 | $84,500 |
| Households that own their home | 32% | 54% |
| Population (2021) | 18,120 | 16,813 |
| Homes built in 1960 or before | 26% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Kensington-Chinatown | City median |
|---|---|---|
| Assault | 2017.5 | 636.3 |
| Robbery | 193 | 69.5 |
| Shootings | 21.9 | 10.5 |
| Auto theft | 118.4 | 192.6 |
| Theft over $5,000 | 219.3 | 46.1 |
| Break and enter | 443 | 172.8 |
| Theft from vehicles | 850.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.