HousePrecheckCheck an address

200 Rockcliffe CrtToronto · zoning, lot size and permit records

≈ 78.8 × 112.3 m5,681 m²on Symes Rdcorner, also on Rockcliffe Crt

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N20 m
≈ 78.8 m frontage≈ 112.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (100% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. B0092/16EYK (To obtain consent to sever the lot into four lots, 2017).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • Consent (lot split)B0092/16EYKApproved

    To obtain consent to sever the lot into four lots.

    Oct 12, 2017 · 200 ROCKCLIFFE CRT
  • Zoning review14 263852 ZPRClosed
    Dec 13, 2014 · 200 ROCKCLIFFE CRT
  • Zoning review09 174660 ZPRClosed
    Oct 1, 2009 · 200 ROCKCLIFFE CRT

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
5,681 m²
Frontage
78.8 mestimated, irregular lot
Depth
112.3 mestimated, irregular lot
Street
Symes Rd
Corner lot
Yes, also on Rockcliffe Crt112.3 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • 10 City trees in front of this lot. The City's street tree inventory lists 10 trees at this address: maple, manitoba (25 cm), maple, manitoba (20 cm), maple, manitoba (20 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
93%13 of 14 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a second storey addition above the existing detached garage. The altered garage will be converted into a garden suite.

    20 BLAKLEY AVE · May 28, 2026 · 248 m away
  • Minor varianceApproved

    To construct an ancillary structure (shed) in the rear yard.

    130 SPEARS ST · Feb 12, 2026 · 397 m away
  • Minor varianceApproved

    To legalize and to maintain the existing Entertainment Place of Assembly.

    131 MC CORMACK ST · Jul 10, 2025 · 355 m away
  • Minor varianceApproved

    To construct a new detached dwelling. The existing detached garage in the rear yard will be maintained.

    22 FELTHAM AVE · Aug 1, 2024 · 430 m away
  • Minor varianceApproved

    To legalize and maintain the existing triplex.

    111 CAYUGA AVE · Apr 27, 2023 · 489 m away

Latest activity nearby

  • Building permit

    Revision to - sealing an existing basement window in the laundry room areaProposal for interior alterations to main floor and basement, including plumbing and drain.

    2 HILLDALE RD · Oct 5, 2026 · 145 m away
  • Building permitgarden suite

    Proposed rear garden suite on existing garage.

    20 BLAKLEY AVE · Sep 17, 2026 · 248 m away
  • Building permit

    Revision 04- Remove proposed R12 insulation note on bsmt plan (A2) and section (A4)Revision 03- Adding front porch.Proposal for interior alterations to an existing SFD-detached dwelling.

    39 BLAKLEY AVE · Aug 26, 2026 · 166 m away
  • Minor varianceApproved

    To construct a second storey addition above the existing detached garage. The altered garage will be converted into a garden suite.

    20 BLAKLEY AVE · May 28, 2026 · 248 m away
  • Building permit

    finish basement

    5 BLAKLEY AVE · Apr 29, 2026 · 292 m away
  • Building permit

    STAND ALONE BACK WATER VALVE

    38 BLAKLEY AVE · Mar 13, 2026 · 174 m away
  • Building permit

    Backwater valve installation

    26 CRISCOE ST · Jan 20, 2026 · 267 m away
  • Building permitsecondary suite

    Rev 01: convert basement to new secondary suite, additional scope of new rear deck, front porch, walk-out stairs. cold storage under new rear deckProposal to underpin existing basement foundation to lower basement floor, to create a finished basement.

    10 BLAKLEY AVE · Nov 21, 2025 · 277 m away
  • Building permit

    Proposal for interior alterations to basement.

    2 HILLDALE RD · Oct 14, 2025 · 145 m away
  • Building permit

    Replace interior waterproofing, install deltawrap, weeping tile, and sump pump. Replace plumbing to basement bathroom, replace support beam in basement. Finish basement with laundry room, bathroom, utility room, and rec room. Increase front window. Add wall to main floor bedroom.

    2 HILLDALE RD · Sep 30, 2025 · 145 m away

Neighbourhood: Rockcliffe-Smythe

About the area around the lot, not the lot itself.

Nearest station
Mount Dennis Station28 min walk
Nearest TTC stop
Runnymede Rd at Henrietta St7 min walk
Nearest cycling route
Lavender Creek TrlMulti-Use Trail, 1 min walk
Nearest traffic count
2,774 vehicles in 14 hSymes Rd / Hillborn Ave, 70 m away, Nov 12, 2024
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Gaffney Park2 min walk
Black Creek Site East5 min walk
Henrietta Park5 min walk

Schools within 1 km

  • IQRA NEJASHI ISLAMIC SCHOOL Private 5 min walk
  • HARWOOD PUBLIC SCHOOL English Public 6 min walk
  • ROCKCLIFFE MDL SCHOOL English Public 9 min walk
  • FRANK OKE SECONDARY SCHOOL English Public 10 min walk
  • CORDELLA JR PUBLIC SCHOOL English Public 11 min walk
  • ST OSCAR ROMERO CATHOLIC SECONDARY SCHOOL English Separate 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRockcliffe-SmytheMedian neighbourhood
Median household income (2020)$69,000$84,500
Households that own their home56%54%
Population (2021)22,23516,813
Homes built in 1960 or before45%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRockcliffe-SmytheCity median
Assault742.7636.3
Robbery74.769.5
Shootings16.610.5
Auto theft157.7192.6
Theft over $5,00037.346.1
Break and enter132.8172.8
Theft from vehicles224188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.