HousePrecheckCheck an address

200 Murison BlvdToronto · zoning, lot size and permit records

Also 800 Milner Ave, 802 Milner Ave, 804 Milner Ave, 806 Milner Ave, 808 Milner Ave and 3 more

Residential multiple · RM (au263.0) (x410)≈ 146.4 × 223.4 m23,962 m²on Split Maple Crtcorner, also on Murison Blvd

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 2.4 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 22 212178 (Relevelling of slab on grade, sistering of floor joists, window and patio door replacem..., 2022, status Inspection); 20 155057 (Foundation Underpinning to existing Townhouse, 2020, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 146.4 m frontage≈ 223.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2020

    Needs a closer look

    Still open in the City's records: 22 212178 (Relevelling of slab on grade, sistering of floor joists, window and patio door replacem..., 2022, status Inspection); 20 155057 (Foundation Underpinning to existing Townhouse, 2020, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • By-law investigation26 264198 ELS 00 IRClosed

    Election Signs

    Nov 2, 2026 · 200 MURISON BLVD
  • By-law investigation25 230243 APP 00 IRClosed

    Appliance (Emergency)

    Sep 24, 2025 · 200 MURISON BLVD
  • Building permit22 212178Inspection

    Relevelling of slab on grade, sistering of floor joists, window and patio door replacement. Paint walls, ceilings and millwork within all floor areas - Unit 90

    Oct 11, 2022 · 200 MURISON BLVD
  • Building permit22 139870Closed

    Proposal for interior alterations on the main floor by adding a 3 piece bathroom.

    May 17, 2022 · 200 MURISON BLVD
  • Building permit20 155057Inspection

    Foundation Underpinning to existing Townhouse

    Sep 15, 2020 · 200 MURISON BLVD
  • Building permit11 172318Closed

    interior alteration to 2nd and 3rd floor plumbing - replace 4 fixtures at the same location

    Apr 21, 2011 · 200 MURISON BLVD
  • Building permit10 305747Closed

    Re-route sanitary drain; work in conjuction with Unit 43

    Nov 30, 2010 · 200 MURISON BLVD
  • Building permit10 305737Closed

    Re-route sanitary drain; work in conjuction with Unit 47

    Nov 30, 2010 · 200 MURISON BLVD

Check before you build

  • Site-specific exception 900.6.10(410)

    Needs a closer look

    7 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.6.10(410)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum building setback from a front lot line is: (i) 14.0 metres, if the lot line abuts Sheppard Ave.; and (ii) 7.5 metres in all other cases

  2. Rule B

    The minimum building setback from a side lot line or rear lot line is: (i) 12.0 metres if the lot line abuts a lot in an RD, RS or RT zone; and (ii) 10.5 metres in all other cases

  3. Rule C

    The maximum lot coverage is 30%

  4. Rule D

    A minimum of 50% of the lot area must be used for soft landscaping

  5. Rule E

    The minimum building setback from a lot line for a below grade parking structures is the greater of: (i) 3.0 metres; and (ii) a distance equivalent to the vertical distance from the surface of the lowest floor of the structure to the average elevation of grade at the front lot line

  6. Rule F

    Parking spaces must be provided at a minimum rate of: (i) 1.0 for each dwelling unit and used for resident parking; and (ii) 0.3 for each dwelling unit and used for surface visitor parking

  7. Rule G

    A building used for the storage of waste is permitted in a yard that abuts a street if: (i) it is wholly enclosed with walls and a roof; and (ii) is located a minimum of 1.5 metres from a lot line that abuts a street .

By-law 569-2013, Chapter 900

Lot facts

Area
23,962 m²
Frontage
146.4 mestimated, irregular lot
Depth
223.4 mestimated, irregular lot
Street
Split Maple Crt
Corner lot
Yes, also on Murison Blvd223.4 m along it
Public lane
None
Max height
—
Max lot coverage
33%
  • Zone RM (au263.0) (x410) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source

Around this lot

Minor variances approved
100%2 of 2 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Single sided third party ground sign

    825 MILNER AVE · Aug 27, 2026 · 266 m away
  • Building permit

    Proposal for a sunroom addition on rear side of main dwelling.

    8 SPLIT MAPLE CRT · Jun 4, 2026 · 151 m away
  • Zoning review

    Closed

    799 MILNER AVE · May 27, 2026 · 257 m away
  • Building permitsecondary suite

    New secondary suite within basement

    155 MURISON BLVD · Apr 20, 2026 · 240 m away
  • Zoning review

    Closed

    825 MILNER AVE · Feb 26, 2026 · 266 m away
  • Zoning review

    Closed

    1150-1176 MORNINGSIDE AVE · Nov 25, 2025 · 179 m away
  • Building permit

    1 THIRD PARTY GROUND SIGN FOR EV CHARGER**JOLT**

    1150-1176 MORNINGSIDE AVE · Oct 20, 2025 · 179 m away
  • Building permit

    Proposal for interior alterations to convert vacant unit (211) into a nail salon.

    1150 MORNINGSIDE AVE · Oct 17, 2025 · 179 m away
  • Zoning review

    Closed

    1150 MORNINGSIDE AVE · Aug 4, 2025 · 179 m away
  • Zoning review

    Closed

    1150 MORNINGSIDE AVE · Jul 29, 2025 · 179 m away

Neighbourhood: Malvern East

About the area around the lot, not the lot itself.

Nearest TTC stop
Murison Blvd at Split Maple Crt South Side1 min walk
Nearest cycling route
Sheppard Ave EBike Lane, 5 min walk
Nearest traffic count
9,855 vehicles in 8 hMurison Blvd / Milner Ave, 130 m away, Jul 11, 2017
Serious collisions within 500 m
22021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
Parks
Murison Park2 min walk
Malvern Woods3 min walk
John Tabor Park9 min walk

Schools within 1 km

  • ST FLORENCE CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • EMILY CARR PUBLIC SCHOOL English Public 11 min walk
  • LUCY MAUD MONTGOMERY PUBLIC SCHOOL English Public 11 min walk
  • GREY OWL JR PUBLIC SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMalvern EastMedian neighbourhood
Median household income (2020)$85,000$84,500
Households that own their home70%54%
Population (2021)26,09516,813
Homes built in 1960 or before4%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMalvern EastCity median
Assault505.9636.3
Robbery80.869.5
Auto theft224.8192.6
Theft over $5,00035.146.1
Break and enter80.8172.8
Theft from vehicles186.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.