HousePrecheckCheck an address

20 Victoria StToronto · zoning, lot size and permit records

Commercial residential · CR 12.0 (c8.0; r11.7) SS1 (x2327)≈ 33.5 × 26.9 m704 m²on Victoria St

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 215877 (Proposed interior alterations of office for new partition/ door to secure elevator lobb..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 15 development applications open within 300 m, up to 80 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: QueenThe City plans more homes around the station: good for transit, and more building over time.
N20 m
≈ 33.5 m frontage≈ 26.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 215877 (Proposed interior alterations of office for new partition/ door to secure elevator lobb..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 15 development applications open within 300 m

    Good to know

    15 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Building permit26 215877Inspection

    Proposed interior alterations of office for new partition/ door to secure elevator lobby for full floor tenant.

    Aug 31, 2026 · 20 VICTORIA ST
  • Building permit24 124679Closed

    PROPOSED: Replacement of existing 175kW generator and ATS in existing generator room.

    Jun 7, 2024 · 20 VICTORIA ST
  • Building permit18 137626Closed

    Proposal fro interior alterations to the 4th floor of the existing office building. Scope of work includes new layout of an office and hvac.

    Apr 13, 2018 · 20 VICTORIA ST
  • Building permit16 219568Closed

    Install one new Electromagnetic Locks on the 3rd floor.

    Oct 5, 2016 · 20 VICTORIA ST

Check before you build

  • Site-specific exception 900.11.10(2327)

    Needs a closer look

    3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2327)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(1) 397 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(2) 132 of former City of Toronto By-law 438-86

  3. Older by-law C

    Section 12(2) 276 of former City of Toronto By-law 438-86

1 part for other addresses
  • D On 1 Adelaide St. E., former City of Toronto by-law 996-88.
By-law 569-2013, Chapter 900

Lot facts

Area
704 m²
Frontage
33.5 mestimated, irregular lot
Depth
26.9 mestimated, irregular lot
Street
Victoria St
Corner lot
No
Public lane
None
House footprint
686 m²
Back yard
0.5 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
3house, garage, sheds
Max height
76 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Queen. The lot is inside the Queen Major Transit Station Area approved by the Province (Site and Area Specific Policy 605). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 12.0 (c8.0; r11.7) SS1 (x2327) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
93%13 of 14 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
30

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).

    20 KING ST W · Jun 17, 2026 · 162 m away
  • Minor varianceApproved

    To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.

    89 CHURCH ST · Jan 15, 2025 · 286 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 552-2019(LPAT)), for the existing four-storey commercial/office building, by permitting the dwelling unit use through the conversion of the second and third storeys from commercial/offices uses into residential dwelling units (live/work units). Also, to permit a new residential lobby, facing King Street East. No visitor parking spaces and accessible parking spaces will be provided on-site. There will be a total of three commercial units and 11 residential dwelling units (7 dwelling units and 1 commercial unit on the second level, and 4 dwelling units and 2 commercial units on the third level) within this mixed-use building.

    71 KING ST E · Dec 11, 2024 · 156 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-laws 218-2021 and 219-2021), for a new 34-storey mixed-use building (which is currently under construction), by reducing the minimum number of vehicular parking spaces. There will be a total of 369 residential dwelling units on this lot.

    90 QUEEN ST E · Oct 23, 2024 · 468 m away
  • Minor varianceApproved

    To alter the development standards for the 33-storey mixed-use building (approved under Site Specific Zoning By-Law 1195-2022), by converting the required office use space into hotel use space (for 142 hotel suites and related facilities) on floors 1 through 10. The site is subject to a current Site Plan Control Application (File 2017 235087 STE 28 SA).

    34 KING ST E · Sep 25, 2024 · 57 m away

Latest activity nearby

  • Building permit

    Revision #1 to layout changes and hvac changes due to site conditions.Proposal for interior alterations for restaurant use.

    1 ADELAIDE ST E · Nov 25, 2026 · 77 m away
  • Building permit

    Modification of the existing sprinkler system for a new tenant layout (Cubecom) on the 6th floor. Related Permit no. 26 223212 BLD 00 BA

    4 KING ST W · Nov 23, 2026 · 132 m away
  • Building permit

    Revision 01 - Relocate 2 smoke detectors at the interior staircase.---------------------------------------------------------------Proposal to extend existing interconnected stair between 55th and 56th floor to 57th floor

    40 KING ST W · Nov 23, 2026 · 202 m away
  • Building permit

    Proposed interior fit-out for new tenant 'SMART & BIGGAR'.

    40 KING ST W · Nov 20, 2026 · 202 m away
  • Building permit

    Proposed interior alterations Building, plumbing and HVAC work to tenant space.

    151 YONGE ST · Nov 20, 2026 · 192 m away
  • Building permit

    Revision No.1: New Fire Shutter Window

    30 ADELAIDE ST E · Nov 20, 2026 · 111 m away
  • Building permit

    Proposal for interior alterations - demolition of interior partition layout and ceilings back to base condition; washroom renovation/corridor and plumbing fixture/finish

    199 BAY ST · Nov 19, 2026 · 278 m away
  • Building permit

    nstallation of Eighteen (18) electromagnetic locking device including all associated life safety requirements

    50 RICHMOND ST E · Nov 19, 2026 · 267 m away
  • Building permit

    Revision 01 - Revision to permit 26 155898 BLD 00 BA and 26 155898 HVA 00 BA. (Revised Layout)Proposed interior alteration to 21st and 22nd floor office

    199 BAY ST · Nov 19, 2026 · 278 m away
  • Building permit

    PROPOSED INTERIOR ALTERATION TO EXISTING GROUP D OCCUPANCY FOR KALOS LLP. INCLUDING BUILDING,MECHANICAL, PLUMBING AND MAGLOCK PERMITS.

    40 KING ST W · Nov 18, 2026 · 202 m away

Neighbourhood: Downtown Yonge East

About the area around the lot, not the lot itself.

Nearest station
King Station3 min walk
Nearest TTC stop
King Station - Northbound Platform1 min walk
Nearest cycling route
Adelaide St ECycle Track, 1 min walk
Nearest traffic count
13,584 vehicles in 14 hAdelaide St E / Victoria St, 70 m away, Mar 5, 2025
Serious collisions within 500 m
182021–2026, killed or seriously injured: 2 fatal, 9 with pedestrians, 4 with cyclists
Parks
Courthouse Square Park2 min walk
Cloud Gardens3 min walk
Berczy Park4 min walk

Schools within 1 km

  • KEYSTONE INTERNATIONAL SCHOOLS Private 2 min walk
  • VICTORIA STREET LINC English Public 2 min walk
  • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 9 min walk
  • ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 9 min walk
  • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 9 min walk
  • ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDowntown Yonge EastMedian neighbourhood
Median household income (2020)$69,500$84,500
Households that own their home36%54%
Population (2021)17,70016,813
Homes built in 1960 or before7%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDowntown Yonge EastCity median
Assault2360.8636.3
Robbery143.369.5
Shootings11.910.5
Auto theft75.6192.6
Theft over $5,00099.546.1
Break and enter274.7172.8
Theft from vehicles390.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.