Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2010
Needs a closer lookStill open in the City's records: 10 155076 (Pedestrian Walkway to connect 20 Production Dr to 30 Production Dr, 2010, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 26 190620 ESC 24 SA (Proposal to redevelopment of a part of an existing 1-storey commercial building, and to..., 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications5 Committee of Adjustment files on this lot
Good to know5 approved. A161/13SC (To construct an addition for a storage area at 30 Production Drive which would be conne..., 2013); A113/13SC (To construct an addition for a storage area at 20 Production Drive which would be conne..., 2013); B009/10SC (To grant an easement/right-of-way over the south and rear portions of the subject prope..., 2010); and 2 more.
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)2 development applications open within 300 m
Good to know2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
23 records on file: more than at 100% of Toronto houses (median 0).
- Development application26 190620 ESC 24 SAUnder Review
Proposal to redevelopment of a part of an existing 1-storey commercial building, and to construct 2 additional storeys above it without changing the building footprint. The proposed redevelopment consists of retaining 3799sqm of the existing 4929sqm building, and redeveloping the remaining 1130 sqm, and constructing 2x 1130 sqm floorplates above it. The total modified/new GFA is 3390sqm, and the overall total GFA including the existing retained building is 7189sqm. The building will have a height of 13.2m, 3-storeys, and 53 parking spaces.
Jun 24, 2026 · 30 PRODUCTION DR · City file - Building permit22 105145Closed
To erect and display one first party, static, illuminated wall sign. Sign is located in Ward #24 Scarborough-Guildwood, and is subject to sign district E-Employment.SIGN DIMENSIONS:1.74m L x 19.21m W x 0.08m D x 4.94m H **Best Deal Graphics & Printing**
Mar 29, 2022 · 30 PRODUCTION DR - Building permit21 157435Cancelled
Construct second floor office addition to existing industrial building.
May 19, 2021 · 20 PRODUCTION DR - Building permit13 255490Closed
Revision 01: changes to the hvac system
Mar 4, 2021 · 30 PRODUCTION DR - Zoning review19 239541 ZZCClosedOct 22, 2019 · 20 PRODUCTION DR
- Zoning review19 239540 000CancelledOct 22, 2019 · 20 PRODUCTION DR
- Zoning review19 221750 ZPRClosedSep 16, 2019 · 20 PRODUCTION DR
- Building permit16 128565Closed
Proposal to install a 3/4" DVCA back flow prevention device in the existing industrial building.
Apr 8, 2016 · 20 PRODUCTION DR
Show 15 older records
- Building permit16 128559Closed
Proposal to install a 1" DVCA back flow prevention device in the existing industrial building.
Apr 7, 2016 · 30 PRODUCTION DR - Minor varianceA161/13SCApproved
To construct an addition for a storage area at 30 Production Drive which would be connected with the adjacent industrial building at 20 Production Drive. Note: Committee of Adjustment decisions granted in March 2010, approved variances for side yard setbacks of 0 m to permit a loading bay addition connecting 20 Production Drive and 30 Production Drive (File A039/10SC and A040/10SC).
Oct 3, 2013 · 30 PRODUCTION DR - Minor varianceA113/13SCApproved
To construct an addition for a storage area at 20 Production Drive which would be connected with the adjacent industrial building at 30 Production Drive. Note: Committee of Adjustment decisions granted in March 2010, approved variances for side yard setbacks of 0 m to permit a loading bay addition connecting 20 Production Drive and 30 Production Drive (File A039/10SC and A040/10SC).
Oct 3, 2013 · 20 PRODUCTION DR - Zoning review13 125755 ZPRClosedFeb 27, 2013 · 30 PRODUCTION DR
- Zoning review13 125752 ZPRClosedFeb 27, 2013 · 20 PRODUCTION DR
- Building permit10 155076Inspection
Pedestrian Walkway to connect 20 Production Dr to 30 Production Dr
Aug 4, 2010 · 30 PRODUCTION DR - Building permit10 155067Closed
Pedestrian Walkway to connect 20 Production Dr to 30 Production Dr
Aug 4, 2010 · 20 PRODUCTION DR - Consent (lot split)B009/10SCApproved
To grant an easement/right-of-way over the south and rear portions of the subject property in favour of the adjacent property to the north, municipally known as No. 20 Production Drive for vehicle access purposes. The easement/right-of-way is indicated as Part 1 on the attached plan.
Mar 24, 2010 · 30 PRODUCTION DR - Minor varianceA039/10SCApproved
To construct a loading bay on the north side of the subject industrial building. This loading bay will connect with a loading bay that is proposed on the south side of the adjacent industrial building, municipally known as No. 20 Production Drive.
Mar 24, 2010 · 30 PRODUCTION DR - Minor varianceA040/10SCApproved
To construct a loading bay on the south side of the subject industrial building. This loading bay will connect with a loading bay that is proposed on the north side of the adjacent industrial building, municipally known as No. 30 Production Drive.
Mar 24, 2010 · 20 PRODUCTION DR - Building permit08 186432Closed
HVAC - Warehouse addition at rear of building
Sep 9, 2008 · 20 PRODUCTION DR - Zoning review08 170234 ZALClosedJun 13, 2008 · 20 PRODUCTION DR
- Zoning review04 198908 LTOClosedDec 8, 2004 · 20 PRODUCTION DR
- Zoning review03 100374 LTOClosedJan 6, 2003 · 30 PRODUCTION DR
- Zoning review02 188893 ZPUClosedNov 14, 2002 · 30 PRODUCTION DR
Check before you build
Site-specific exception 900.20.10(165)
Needs a closer look1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
The minimum building setback from the centre line of the creek is 15 metres. Prevailing By-laws and Prevailing Sections: (None Apply)
- Older by-law A
The minimum building setback from the centre line of the creek is 15 metres. Prevailing By-laws and Prevailing Sections: (None Apply)
Lot facts
- Area
- 9,219 m²
- Frontage
- 86.9 m
- Depth
- 106.3 m
- Street
- Production Dr
- Corner lot
- No
- Public lane
- None
- House footprint
- 2,670 m²roof up to 7.1 m
- Back yard
- 19.5 mhouse to rear lot line
- Side yards
- 12 m and 35 mhouse to side lot lines
- Buildings on the lot
- 3house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Zone E 0.7 (x165) (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
- 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: basswood, redmond (8 cm), basswood, redmond (7 cm), pear chanticleer (5 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%1 of 1 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 2
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
Interior alterations to the north wing to convert the existing church space into a day nursery.
801 PROGRESS AVE · Sep 10, 2025 · 327 m away - Minor varianceApproved
The applicant is seeking relief from the provisions of the Zoning By-law to permit manufacturing uses in units number 1 and 11 (359 square metres) and units number 2 to 10 inclusive for vehicle service and repair use (1835 square metres).
1120 BELLAMY RD N · Feb 28, 2019 · 477 m away - Minor varianceApproved
The applicant is seeking relief from the provisions of the Zoning By-law to permit the growing of micro greens in the existing organic food processing company, Crown Sprouts.
1147 BELLAMY RD N · Dec 13, 2018 · 187 m away
Latest activity nearby
- Zoning review
Application Acceptable
2010 ELLESMERE RD · Aug 26, 2026 · 297 m away - Zoning review
Closed
10 ESTATE DR · Aug 4, 2026 · 232 m away - Zoning review
Cancelled
1145 BELLAMY RD N · Jul 31, 2026 · 254 m away - Development application
Proposal to redevelopment of a part of an existing 1-storey commercial building, and to construct 2 additional storeys above it without changing the building footprint. The proposed redevelopment consists of retaining 3799sqm of the existing 4929sqm building, and redeveloping the remaining 1130 sqm, and constructing 2x 1130 sqm floorplates above it. The total modified/new GFA is 3390sqm, and the overall total GFA including the existing retained building is 7189sqm. The building will have a height of 13.2m, 3-storeys, and 53 parking spaces.
30 PRODUCTION DR · Jun 24, 2026 · 19 m away · City file - Zoning review
Closed
10 ESTATE DR · May 8, 2026 · 232 m away - Zoning review
Closed
1149 BELLAMY RD N · Jan 28, 2026 · 234 m away - Building permit
Updating the existing infrastructure to bring the building in line with net-zero energy design criteria.
821 PROGRESS AVE · Jan 23, 2026 · 238 m away - Building permit
1 GROUND SIGN**KAL TIRE**
16 ESTATE DR · Nov 4, 2025 · 288 m away - Building permit
Proposal to install a backflow prevention device.
860 PROGRESS AVE · Aug 22, 2025 · 195 m away - Building permit
Proposal for interior alterations for a new Compounding Pharmacy [Manufacturing (Compounding) , Warehousing, Wholesaling Use].
1149 BELLAMY RD N · Jul 8, 2025 · 234 m away
Neighbourhood: Woburn North
About the area around the lot, not the lot itself.
- Nearest station
- McCowan Rt Station19 min walk
- Nearest TTC stop
- Progress Ave at Production Dr2 min walk
- Nearest cycling route
- Ellesmere RdMulti-Use Trail - Boulevard, 11 min walk
- Nearest traffic count
- 11,049 vehicles in 8 hProgress Ave / Estate Dr (West), 190 m away, Mar 21, 2016
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- Trca Lands ( 77)6 min walk
- Morningside Park8 min walk
- Confederation Park8 min walk
Schools within 1 km
- TALENTA ACADEMY Private 7 min walk
- ADVANCED CHRISTIAN ACADEMY (Renamed) Private 8 min walk
- ADVANCED CHRISTIAN ACADEMY Private 8 min walk
- Z3 EDUCATION CENTRE SCHOOL Private 10 min walk
- MADINATUL ULOOM ACADEMY INC Private 11 min walk
- NEW COVENANT CHURCH SCHOOL Private 12 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Woburn North | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $74,500 | $84,500 |
| Households that own their home | 54% | 54% |
| Population (2021) | 26,580 | 16,813 |
| Homes built in 1960 or before | 23% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Woburn North | City median |
|---|---|---|
| Assault | 768.9 | 636.3 |
| Robbery | 76.5 | 69.5 |
| Shootings | 13.9 | 10.5 |
| Auto theft | 316.6 | 192.6 |
| Theft over $5,000 | 62.6 | 46.1 |
| Break and enter | 180.9 | 172.8 |
| Theft from vehicles | 281.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.