HousePrecheckCheck an address

20 Polson StToronto · zoning, lot size and permit records

232.9 × 92.9 m21,632 m²on Polson St

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
232.9 m frontage92.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Natural Heritage System (36% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

15 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review25 208028 LPRApplication On Hold
    Aug 11, 2025 · 20 POLSON ST
  • Zoning review25 160818 LPRCancelled
    May 16, 2025 · 20 POLSON ST
  • Building permit20 189278Closed

    Proposal to erect temporary entrance structures for TIFF. (start date September 8, 2020 and teardown September 22, 2020)

    Sep 8, 2020 · 20 POLSON ST
  • Building permit18 133517Closed

    Proposal to erect a 20' x 20' x 40' temporary display for a bell commercial activation. display would have self contained lights and signs covering it, structure to be erected on March 29, 2018 and removed April 07, 2018.

    Apr 23, 2018 · 20 POLSON ST
  • Building permit16 207786Closed

    Proposal to erect 17 temporary structures on existing parking lot for Swatch Beach Vollyball FIVB World Tour Finals. Aug 24 - Sept 26/2016.

    Aug 26, 2016 · 20 POLSON ST
  • Building permit16 212547Approved

    Alternative Solution in connection to 16 207786 TPS for raised floor structure in tent.

    Aug 24, 2016 · 20 POLSON ST
  • Zoning review13 273344 LPRClosed
    Dec 3, 2013 · 20 POLSON ST
  • Building permit07 269712Closed

    Permit for one certified temporary tent - Docks Parkinglot - 06-126982BLD - install Oct 17/07 and dismantle Oct 18/07

    Oct 17, 2007 · 20 POLSON ST
Show 7 older records
  • Zoning review03 167729 PSPClosed
    Aug 20, 2003 · 20 POLSON ST
  • Zoning review02 123480 ZPRClosed
    Apr 4, 2002 · 20 POLSON ST
  • Building permit01 160220Closed

    install 3 temporary tent structures (30' x 40'). to be assembled on july 19th, 2001 and dismantled by july 26th, 2001.

    Jul 19, 2001 · 20 POLSON ST
  • Building permit01 138732Closed

    install 3 temporary tent structures - install Jun 11 01 dismantle Jun 15 01 cert. # 00-55026 (40 x 30m) 00-55027 (20x40') 00-55029 (40x80')

    Jun 15, 2001 · 20 POLSON ST
  • Zoning review00 012521 LTOClosed
    May 8, 2000 · 20 POLSON ST
  • Zoning review00 012195 LTOClosed
    Feb 22, 2000 · 20 POLSON ST
  • Zoning review96 025503 LTOClosed
    Sep 25, 1996 · 20 POLSON ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
21,632 m²
Frontage
232.9 m
Depth
92.9 m
Street
Polson St
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: poplar, eastern cottonwood (34 cm), maple, norway (28 cm), poplar, eastern cottonwood (28 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new building which is to be used as a recreation centre (Basketball Courts).

    185 CHERRY ST · May 14, 2008 · 493 m away

Latest activity nearby

  • Zoning review

    Not Started

    55 POLSON ST · Nov 17, 2026 · 147 m away
  • Building permit

    EXISTING TEMPORARY AIR SUPPORTED DOME end of Oct 2026- end of April 2027.

    176 CHERRY ST · Oct 8, 2026 · 162 m away
  • Building permit

    Proposal to install one custom 15m*55m temporary tent [(1) 15m x 45m + (1) 15m x 10m] for a wedding reception from Oct 16 to Oct 20.

    11 POLSON ST · Sep 25, 2026 · 99 m away
  • Zoning review

    Closed

    238 CHERRY ST · May 26, 2026 · 252 m away
  • Zoning review

    Application On Hold

    11 POLSON ST · Nov 4, 2025 · 99 m away
  • Zoning review

    Closed

    176 CHERRY ST · Oct 10, 2025 · 162 m away
  • Zoning review

    Closed

    15 POLSON ST · Sep 16, 2025 · 89 m away
  • Building permit

    Installation of a 40' x 45' Temporary Tent, anchored with concrete weights for a Boat Christening Event. Installation: Sept 17. Event Sept 18 - 9:30am - 12:30pm. Removal Sept 19. Certified plans 25 135929

    54 POLSON ST · Sep 16, 2025 · 165 m away
  • Zoning review

    Application On Hold

    176 CHERRY ST · Sep 11, 2025 · 162 m away
  • Building permit

    Proposal for a temporary structure (container) for cabana pool bar. Installation date: 08-23-2025, removal date:

    11 POLSON ST · Aug 25, 2025 · 99 m away

Neighbourhood: South Riverdale

About the area around the lot, not the lot itself.

Nearest station
Queens Quay/Ferry Docks Station30 min walk
Nearest TTC stop
Commissioners St at Cherry St East Side6 min walk
Nearest cycling route
Biidaasige Park TrlMulti-Use Trail, 5 min walk
Nearest traffic count
7,449 vehicles in 14 hCommissioners St / Cherry St, 330 m away, Oct 6, 2026
Serious collisions within 500 m
12021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
Parks
Jennifer Kateryna Koval's'kyj Park1 min walk
Biidaasige Park2 min walk
Water's Edge Promenade10 min walk

Schools within 1 km

  • GEORGE BROWN COLLEGE - WATERFRONT CAMPUS College 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth RiverdaleMedian neighbourhood
Median household income (2020)$100,000$84,500
Households that own their home57%54%
Population (2021)27,81516,813
Homes built in 1960 or before52%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth RiverdaleCity median
Assault828.7636.3
Robbery69.369.5
Shootings3.210.5
Auto theft217.4192.6
Theft over $5,00088.246.1
Break and enter264.7172.8
Theft from vehicles349.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.