HousePrecheckCheck an address

20 Niagara StToronto · zoning, lot size and permit records

Commercial residential employment · CRE (x1)22.9 × 37.5 m836 m²on Niagara Stbacks onto Ln E Bathurst S Wellington

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 23 107743 (Localized concrete slab repairs, 2023, status Permit Issued); 04 154190 (HVAC - Enlarge existing enclosed stair to roof top (from unit #603). Refer to C of A De..., 2005, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 18 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: King-BathurstThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
22.9 m frontage37.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: in a Heritage Conservation District (Part V)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 2 building permits open, the oldest since 2005

    Needs a closer look

    Still open in the City's records: 23 107743 (Localized concrete slab repairs, 2023, status Permit Issued); 04 154190 (HVAC - Enlarge existing enclosed stair to roof top (from unit #603). Refer to C of A De..., 2005, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0055/04TEY (The applicant is seeking relief from the provisions of Zoning By-law No. 438-86, as ame..., 2004).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 18 development applications open within 300 m

    Good to know

    18 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

14 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation25 260145 FEN 00 IRClosed

    Fence

    Nov 29, 2025 · 20 NIAGARA ST
  • Building permit23 175530Closed

    Plumbing - Interior alterations to existing condo unit. New plumping to accommodate these changes.

    Aug 21, 2023 · 20 NIAGARA ST
  • Building permit23 107743Permit Issued

    Localized concrete slab repairs.

    Feb 27, 2023 · 20 NIAGARA ST
  • Building permit15 152295Closed

    Proposal for balcony repairs on the west elevation

    May 15, 2015 · 20 NIAGARA ST
  • Building permit11 210055Closed

    Proposal to install 1 backflow prevention device in an existing apartment building.

    Jul 14, 2011 · 20 NIAGARA ST
  • Building permit11 211277Closed

    Proposal for interior alterations to ground floor condominimum unit (Unit 101). Proposal includes HVAC and plumbing.

    Jun 20, 2011 · 20 NIAGARA ST
  • Building permit10 129748Cancelled

    Permit for minor interior alterations to existing apartment building - suite 104

    Mar 12, 2010 · 20 NIAGARA ST
  • Building permit10 102886Closed

    Installation of a 2 1/2" backlfow prevention device within the P1 level of the apartment building.

    Feb 3, 2010 · 20 NIAGARA ST
Show 6 older records
  • Building permit10 105740Closed

    Proposal for interior alterations to unit 404 (apartment building) on fourth floor.

    Jan 21, 2010 · 20 NIAGARA ST
  • Building permit04 154190Permit Issued

    HVAC - Enlarge existing enclosed stair to roof top (from unit #603). Refer to C of A Decision. - Addition(s)

    Apr 15, 2005 · 20 NIAGARA ST
  • Minor varianceA0055/04TEYApproved

    The applicant is seeking relief from the provisions of Zoning By-law No. 438-86, as amended, to permit the construction of an rooftop enclosure addition to the existing rooftop stair enclosure at Unit#603 within the existing 6 storey (21 Unit) residental condominium.

    Mar 24, 2004 · 20 NIAGARA ST
  • Zoning review03 185084 ZPRClosed
    Oct 10, 2003 · 20 NIAGARA ST
  • Building permit98 024874Closed

    MAKE INTERIOR ALTERATIONS TO DEWLLING UNIT. SUITE 203. FEE $ 80.00

    Dec 15, 1998 · 20 NIAGARA ST
  • Zoning review89 029799 LTOClosed
    Feb 20, 1989 · 20 NIAGARA ST

Check before you build

  • Site-specific exception 900.12.10(1)

    Needs a closer look

    2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.12.10(1)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(2) 260 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(2) 270 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
836 m²
Frontage
22.9 m
Depth
37.5 m
Street
Niagara St
Corner lot
No
Public lane
Ln E Bathurst S Wellington, 7.4 m along it
Max height
23 m
Max lot coverage
—
  • Major Transit Station Area: King-Bathurst. The lot is inside the King-Bathurst Major Transit Station Area approved by the Province (Site and Area Specific Policy 761). Source
  • King-Spadina Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CRE (x1) (Commercial Residential Employment). Chapter 50, section 50.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: ginkgo (22 cm), ginkgo (16 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
90%19 of 21 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
52

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 21 variance decisions: more than at 52% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To alter the development standards for the mixed-use building (stepping up to 14-storeys (45 m), as approved under Site Specific Zoning By-law 1247-2022 (OLT), by increasing the building height, the number of storeys (stepping up to 17-storeys (54.5 m), the total gross floor area (for residential and non-residential uses), and the total number of residential dwelling units (including a reduction in the proportion of three-bedroom units). Also, to reduce the minimum required outdoor amenity space, the number of required residential and visitor parking spaces, the number of parking spaces equipped with an energized outlet, the number of oversized bicycle parking spaces, and the minimum width of two short-term bicycle parking spaces. The altered mixed-use building will contain commercial uses on the first and second storeys, indoor and outdoor amenity spaces on the second storey, and a total of 162 residential dwelling units.

    485 WELLINGTON ST W · Oct 7, 2026 · 221 m away
  • Minor varianceApproved

    To alter the development standards for the 15-storey (50 m) mixed-use building (as approved under Site Specific Zoning By-Law 1047-2022), by increasing the overall height, number of dwelling units, and residential gross floor area, and to reduce loading and bicycle parking spaces.

    462 WELLINGTON ST W · Mar 26, 2025 · 290 m away
  • Minor varianceApproved

    To permit the undersized loading spaces (Type C) in the parking level of a 15 storey mixed-use building (currently under construction).

    530 FRONT ST W · Jun 12, 2024 · 200 m away
  • Minor varianceApproved

    To construct a new two-storey building (to contain a restaurant) with a rooftop patio.

    480 ADELAIDE ST W · Mar 22, 2023 · 424 m away
  • Minor varianceApproved

    To permit a new eating establishment with an entertainment area (bowling alley) on Level P2 of Building D ("The Well").

    480 FRONT ST W · Sep 21, 2022 · 335 m away

Latest activity nearby

  • Building permit

    Rev 01 - Changing washroom/shower layout and reducing it down to 2 showersCommercial renovation to operate pilates fitness classes in a studio, and enhancing the plumbing to provide 3 washrooms and 3 showers.

    517 WELLINGTON ST W · Nov 23, 2026 · 159 m away
  • Building permit

    Proposal to demolish existing partial wall and construct a tenant demising wall at Level 1, Area C north lobby.

    530 FRONT ST W · Nov 18, 2026 · 200 m away
  • Building permit

    Proposal for alternative solution for the turnstiles for access control to meet the intent of the OBC for egress and barrier-free accessibility requirements

    530 FRONT ST W · Oct 30, 2026 · 200 m away
  • Building permit

    Proposal for interior alterations to office spaces on Level 01, 07 and 08.

    530 FRONT ST W · Oct 29, 2026 · 200 m away
  • Building permit

    1 Wall Sign****ORCHARD KITCHEN****

    700 KING ST W · Oct 28, 2026 · 273 m away
  • Building permit

    Installation of 2 maglocks on amenity floors

    701 KING ST W · Oct 26, 2026 · 245 m away
  • Zoning review

    Closed

    689 KING ST W · Oct 23, 2026 · 246 m away
  • Building permit

    Proposed installation of GeoExchange system consisting of 45 boreholes

    150 QUEENS WHARF RD · Oct 20, 2026 · 292 m away
  • Building permit

    1 Wall Sign****McCain Foods****

    530 FRONT ST W · Oct 20, 2026 · 200 m away
  • Minor varianceRefused

    To alter the development standards for the mixed-use building (stepping up to 14-storeys (45 m), as approved under Site Specific Zoning By-law 1247-2022 (OLT), by increasing the building height, the number of storeys (stepping up to 17-storeys (54.5 m), the total gross floor area (for residential and non-residential uses), and the total number of residential dwelling units (including a reduction in the proportion of three-bedroom units). Also, to reduce the minimum required outdoor amenity space, the number of required residential and visitor parking spaces, the number of parking spaces equipped with an energized outlet, the number of oversized bicycle parking spaces, and the minimum width of two short-term bicycle parking spaces. The altered mixed-use building will contain commercial uses on the first and second storeys, indoor and outdoor amenity spaces on the second storey, and a total of 162 residential dwelling units.

    485 WELLINGTON ST W · Oct 7, 2026 · 221 m away

Neighbourhood: Wellington Place

About the area around the lot, not the lot itself.

Nearest station
St. Andrew Station22 min walk
Nearest TTC stop
Bathurst St at Niagara St2 min walk
Nearest cycling route
Wellington St WBi-Directional Cycle Track, 1 min walk
Nearest traffic count
16,598 vehicles in 14 hBathurst St / Niagara St, 90 m away, Oct 14, 2026
Serious collisions within 500 m
82021–2026, killed or seriously injured: 0 fatal, 4 with pedestrians, 3 with cyclists
Parks
Victoria Memorial Square Park1 min walk
Northern Linear Park4 min walk
Draper Park4 min walk

Schools within 1 km

  • ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 7 min walk
  • ST MARY CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
  • NIAGARA STREET JR PUBLIC SCHOOL English Public 10 min walk
  • BISHOP MACDONELL CATHOLIC ELEMENTARY English Separate 10 min walk
  • JEAN LUMB PUBLIC SCHOOL English Public 10 min walk
  • CITY SCHOOL English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWellington PlaceMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home38%54%
Population (2021)25,57016,813
Homes built in 1960 or before2%29%
Homes needing major repairs1%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWellington PlaceCity median
Assault1169.6636.3
Robbery8269.5
Homicide5.35.3
Shootings10.610.5
Auto theft97.9192.6
Theft over $5,00087.346.1
Break and enter293.7172.8
Theft from vehicles211.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.