HousePrecheckCheck an address

20 Mc Gee StToronto · zoning, lot size and permit records

Employment · E 2.0 (x299)15.0 × 33.8 m498 m²on Mc Gee St

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • 8 development applications open within 300 m, up to 48 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • 2 open orders or by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 253813 PRS 00 IV (Order Issued Property Standards, 2026, status Order Issued); 26 232183 PRS 00 IR (Property Standards, 2026, status Order Issued).
  • Major Transit Station Area: LeslievilleThe City plans more homes around the station: good for transit, and more building over time.
N10 m
15.0 m frontage33.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 open orders or by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 253813 PRS 00 IV (Order Issued Property Standards, 2026, status Order Issued); 26 232183 PRS 00 IR (Property Standards, 2026, status Order Issued).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • By-law investigation26 253813 PRS 00 IVOrder Issued

    Order Issued Property Standards

    Sep 3, 2026 · 20 MC GEE ST
  • By-law investigation26 232183 PRS 00 IROrder Issued

    Property Standards

    Sep 3, 2026 · 20 MC GEE ST

Check before you build

  • Site-specific exception 900.20.10(299)

    Needs a closer look

    1 site-specific rule applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.20.10(299)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    A vehicle depot , warehouse and associated open storage are also permitted uses on the lot , if: (i) a wall is provided along any lot line that abuts a lot in Open Space Zone category, the Residential Zone category, an Residential Apartment Zone category, or the Commercial Residential Zone category; or (ii) alternatively to (i), soft landscaping is provided on the lot to a minimum width of 2.0 metres along any lot line that abuts a lot in Open Space Zone category, the Residential Zone category, an Residential Apartment Zone category, or the Commercial Residential Zone category. [TO: 438-86; 12 (1) 52]

1 part for other addresses
  • A On 38 Mc Gee St., former City of Toronto by-law 95-0559.
By-law 569-2013, Chapter 900

Lot facts

Area
498 m²
Frontage
15 m
Depth
33.8 m
Street
Mc Gee St
Corner lot
No
Public lane
None
House footprint
147 m²roof up to 8.6 m
Back yard
7.4 mhouse to rear lot line
Side yards
0.4 m and 8.5 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
12 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 542. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Leslieville. The lot is inside the Leslieville Major Transit Station Area approved by the Province (Site and Area Specific Policy 765). Source
  • Zone E 2.0 (x299) (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
100%44 of 44 decisions
Garden suite permits
9
Laneway suite permits
9
Multiplex permits
8
Development applications
19

Within 300 m, last 10 years. 26 suite and multiplex permits: more than at 92% of Toronto houses (median 3). 44 variance decisions: more than at 79% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit non-manufacturing related retail use within an existing two-storey commercial-industrial building.

    400 EASTERN AVE · Nov 21, 2018 · 52 m away
  • Minor varianceApproved

    To convert the vacant industrial building into a distillery with a bar and retail area.

    20 LOGAN AVE · Oct 24, 2018 · 497 m away
  • Minor varianceApproved

    To construct 18 pre-manufactured portable storage modules on a portion of the lot with an existing five-storey self-storage warehouse.

    356 EASTERN AVE · Mar 9, 2016 · 216 m away

Latest activity nearby

  • Building permit

    Proposed commercial kitchen ventilation system

    791 QUEEN ST E · Nov 24, 2026 · 197 m away
  • Minor variancePending

    In Progress

    870 QUEEN ST E · Nov 23, 2026 · 295 m away
  • Minor variancePending

    To alter the existing two-storey semi-detached dwelling by constructing a portion of the rear second storey addition. The sloped roof of the existing rear one-storey addition will be reduced.

    210 LOGAN AVE · Nov 23, 2026 · 278 m away
  • Building permit

    Proposal for replacing existing stairs to basement.

    66 MC GEE ST · Nov 18, 2026 · 128 m away
  • Zoning review

    Cancelled

    210 LOGAN AVE · Nov 3, 2026 · 278 m away
  • Zoning review

    Notice Sent

    210 LOGAN AVE · Nov 3, 2026 · 278 m away
  • Building permit

    Proposal for interior alterations to the ground and second floor

    210 LOGAN AVE · Oct 22, 2026 · 278 m away
  • Building permit

    Proposed work consists of targeted structural repairs to the welding shop, including repairs to the concrete floor slab, concrete masonry walls, and localized floor drains, with associated localized reinstatement of the waterproofing system. The scope also includes the localized removal of corrosion products from exposed steel members, surface preparation, and application of a protective repainting system.

    433 EASTERN AVE · Oct 14, 2026 · 133 m away
  • Building permit

    Proposal to demolish an existing pergola and construction a detached garage

    116 LOGAN AVE · Oct 13, 2026 · 296 m away
  • Building permit

    INSTALL FIRST PARTY WALL SIGN **CHI JUNKY**

    70 MC GEE ST · Sep 24, 2026 · 136 m away

Neighbourhood: South Riverdale

About the area around the lot, not the lot itself.

Nearest station
Chester Station38 min walk
Nearest TTC stop
Queen St East at Boulton Ave4 min walk
Nearest cycling route
Logan AveSigned Route (No Pavement Markings), 4 min walk
Nearest traffic count
12,440 vehicles in 8 hEastern Ave / Mc Gee St, 80 m away, Feb 13, 2020
Serious collisions within 500 m
52021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 2 with cyclists
Parks
Saulter Street Parkette2 min walk
McCleary Playground2 min walk
Jimmie Simpson Park4 min walk

Schools within 1 km

  • MORSE STREET JR PUBLIC SCHOOL English Public 8 min walk
  • DUNDAS JR PUBLIC SCHOOL English Public 9 min walk
  • QUEEN ALEXANDRA MDL SCHOOL English Public 10 min walk
  • SEED ALTERNATIVE SCHOOL English Public 11 min walk
  • EASTDALE COLLEGIATE INSTITUTE English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth RiverdaleMedian neighbourhood
Median household income (2020)$100,000$84,500
Households that own their home57%54%
Population (2021)27,81516,813
Homes built in 1960 or before52%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth RiverdaleCity median
Assault828.7636.3
Robbery69.369.5
Shootings3.210.5
Auto theft217.4192.6
Theft over $5,00088.246.1
Break and enter264.7172.8
Theft from vehicles349.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.