HousePrecheckCheck an address

20 Jenoves PlToronto · zoning, lot size and permit records

Also 109 George St S, 111 George St S, 113 George St S, 115 George St S, 117 George St S and 20 more

Residential · R (d1.0) (x4)35.5 × 65.1 m2,290 m²on Jenoves Plcorner, also on George St Sbacks onto Taylor's Wharf Lane

Not a single house

Several homes on one parcel

26 different civic addresses share this parcel: a townhouse row, a co-op or a complex of homes rather than one house. Build options for a house do not apply to one home here, and the City's records for the parcel may be about any of them.

Looking at a house nearby? What this means for you

  • 26 homes on one parcel of 0.2 haA denser block than the houses around it: more cars and people, often with shared driveways and parking.
  • 5 development applications open within 300 m, up to 46 storeysNew buildings may go up around here in the next years. More change nearby than at 97% of Toronto houses.
  • Major Transit Station Area: CorktownThe City plans more homes around the station: good for transit, and more building over time.

Want to check a home here before you buy?

We are building checks for homes in complexes and co-ops. Leave your email and we will tell you when it is ready.

N20 m
35.5 m frontage65.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 24 253996 PRS 00 IR (Property Standards, 2024).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0707/07TEY (To convert 936 m2 of the ground floor of the existing three-storey building from office..., 2007).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 46 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • By-law investigation24 253996 PRS 00 IRClosed

    Property Standards

    Dec 27, 2024 · 125 GEORGE ST S
  • Building permit09 175652Closed

    Installation of two(2) 2" DCVA backflow prevention devices.

    Oct 9, 2009 · 109 GEORGE ST S
  • Building permit07 287110Cancelled

    Make interior alterations to third floor. Dec 13/11 out to Bill Tan

    Dec 18, 2007 · 109 GEORGE ST S
  • Minor varianceA0707/07TEYApproved

    To convert 936 m2 of the ground floor of the existing three-storey building from office to a retail grocery store.

    Nov 21, 2007 · 109 GEORGE ST S
  • Zoning review06 127675 ZPUClosed
    Apr 21, 2006 · 109 GEORGE ST S
  • Building permit04 189224Closed

    Make interior alterations to portion of the 3rd floor. Tenant: Univeris Corporation.

    Nov 25, 2004 · 109 GEORGE ST S

Check before you build

  • Site-specific exception 900.2.10(4)

    Needs a closer look

    2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(4)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    The lands must comply with exception 900.2.10(7). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 232 of former City of Toronto By-law 438-86

  2. Older by-law B

    on 310 to 320 Gerrard Street East, former City of Toronto By-law 664-1991.

By-law 569-2013, Chapter 900

Lot facts

Area
2,290 m²
Frontage
35.5 m
Depth
65.1 m
Street
Jenoves Pl
Corner lot
Yes, also on George St S65.1 m along it
Public lane
Taylor's Wharf Lane, 44.6 m along it
House footprint
651 m²roof up to 28.5 m
Back yard
3.4 mhouse to rear lot line
Side yards
0.4 m and 22.6 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
14 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Corktown. The lot is inside the Corktown Major Transit Station Area approved by the Province (Site and Area Specific Policy 764). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x4) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
14

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing three-storey townhouse by constructing a rear two-storey addition with a spiral staircase.

    14 AITKEN PL · Apr 3, 2019 · 424 m away
  • Minor varianceApproved

    To modify the redevelopment plan for a 17-storey office building, approved under Site-specific By-law 818-2013 (as amended by Site-specific By-law 401-2014), by constructing a mezzanine within a ground floor eating establishment.

    351 KING ST E · Jun 27, 2018 · 469 m away
  • Minor varianceApproved

    To modify the redevelopment plan approved under Site Specific By-law 1412-2007 for a 22-storey residential building with 354 dwelling units and retail space at grade, by allowing an office (inclusive of a medical/dental office) at grade, and reducing the requirement for office use parking.

    400 ADELAIDE ST E · Jul 12, 2017 · 407 m away
  • Minor varianceApproved

    To alter the redevelopment plan for a 17-storey mixed use building approved under Site Specific By-law 765-2012 (OMB) by altering parking requirements.

    251 KING ST E · Oct 21, 2015 · 259 m away
  • Minor varianceApproved

    To modify the redevelopment plan for the 17-storey office building, approved under Site Specific By-law 818-2013, by amending the minimum required parking facility access width, as well as the building heights specified on Map 2 of the By-law.

    351 KING ST E · Dec 10, 2014 · 469 m away

Latest activity nearby

  • Zoning review

    Application Acceptable

    201 FREDERICK ST · Nov 27, 2026 · 260 m away
  • Zoning review

    Application On Hold

    91 FRONT ST E · Nov 24, 2026 · 178 m away
  • Building permit

    Interior alterations to units 101 & 102 for building 204 King St E.

    214 KING ST E · Nov 19, 2026 · 250 m away
  • Zoning review

    Cancelled

    180 FRONT ST E · Nov 5, 2026 · 246 m away
  • Zoning review

    Closed

    178 FRONT ST E · Nov 5, 2026 · 244 m away
  • Building permit

    REVISION- 03Rev 02 - Scope clarified and simplified for future tenant (Back to Base project with plumbing rough-ins). Build out of future space by others (under separate future permit).REVISION 01:Interior alterations - back to base building - group A occupancy

    71 FRONT ST E · Nov 5, 2026 · 284 m away
  • Zoning review

    Cancelled

    201 FREDERICK ST · Nov 3, 2026 · 260 m away
  • Building permit

    Revision 01: revision to permit 25-138538 BLD 00 BA to revise layout.Convert the existing gym to a retail store - DollaramaConvenience address is 98 The Esplanade

    71 FRONT ST E · Nov 3, 2026 · 284 m away
  • Zoning review

    Closed

    145 FRONT ST E · Oct 30, 2026 · 84 m away
  • Building permit

    Demolition and reconstruction of staircase, podium slab, and wall with waterproofing repairs

    200 KING ST E · Oct 27, 2026 · 212 m away

Neighbourhood: St Lawrence-East Bayfront-The Islands

About the area around the lot, not the lot itself.

Nearest station
King Station11 min walk
Nearest TTC stop
The Esplanade at Lower Jarvis St East Side2 min walk
Nearest cycling route
The EsplanadeBi-Directional Cycle Track, 1 min walk
Nearest traffic count
1,173 vehicles in 8 hThe Esplanade / George St S / David Crombie Park Trl, 80 m away, Jun 15, 2022
Serious collisions within 500 m
102021–2026, killed or seriously injured: 3 fatal, 5 with pedestrians, 4 with cyclists
Parks
David Crombie Park1 min walk
Market Lane Park3 min walk
St. James Park4 min walk

Schools within 1 km

  • ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 2 min walk
  • DOWNTOWN ALTERNATIVE SCHOOL English Public 3 min walk
  • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 3 min walk
  • MARKET LANE JR & SR PUBLIC SCHOOL English Public 7 min walk
  • KEYSTONE INTERNATIONAL SCHOOLS Private 9 min walk
  • VICTORIA STREET LINC English Public 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSt Lawrence-East Bayfront-The IslandsMedian neighbourhood
Median household income (2020)$87,000$84,500
Households that own their home40%54%
Population (2021)31,28516,813
Homes built in 1960 or before3%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSt Lawrence-East Bayfront-The IslandsCity median
Assault1059.7636.3
Robbery96.369.5
Shootings4.510.5
Auto theft24.6192.6
Theft over $5,00078.446.1
Break and enter163.5172.8
Theft from vehicles163.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.