HousePrecheckCheck an address

20 High Meadow PlToronto · zoning, lot size and permit records

Employment · EH 1.0 (x9)140.2 × 233.1 m30,630 m²on High Meadow Pl

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • Major Transit Station Area: Signet ArrowThe City plans more homes around the station: good for transit, and more building over time.
N50 m
140.2 m frontage233.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Natural Heritage System (44% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • Building permit15 230045Closed

    install backflow preventer

    Oct 13, 2015 · 20 HIGH MEADOW PL
  • Zoning review02 139402 PSPClosed
    May 28, 2002 · 20 HIGH MEADOW PL
  • Building permit01 177857Closed

    INSTALL NEW SANITARY,STORM AND WATER SERVICES

    Oct 10, 2001 · 20 HIGH MEADOW PL
  • Building permit01 182316Closed

    NEW SITE SERVICES TO ORIG. PERMIT NO. 00-351027

    Oct 2, 2001 · 20 HIGH MEADOW PL
  • Building permit01 177320Closed

    NEW PLUMBING (INSIDE ONLY) TO CONSTRUCT A NEW INDUSTRIAL BUILDING. REVISE TO ORIG. PERMIT NO. 00-351027

    Sep 20, 2001 · 20 HIGH MEADOW PL
  • Building permit01 175368Closed

    TO INSTALL HVAC IN NEW INDUSTRIAL BUILDING. ORIGINAL BUILDING PERMIT NO. 00-351027.

    Sep 20, 2001 · 20 HIGH MEADOW PL
  • Building permit00 351027Closednew building

    TO CONSTRUCT A NEW INDUSTRIAL BUILDING. REVISE TO ORIG. PERMIT NO. 00-351027

    Aug 23, 2001 · 20 HIGH MEADOW PL
  • Zoning review00 341608 000Closed
    Sep 28, 2000 · 20 HIGH MEADOW PL

Check before you build

  • Site-specific exception 900.22.10(9)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.22.10(9)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The following regulations and clauses do not apply to a transportation use : 5.10.30.1, 60.30.30.20(1), and 60.30.40.70(3). Prevailing By-laws and Prevailing Sections: (A) Section 64.32(12), North York zoning by-law 7625.

  2. Older by-law A

    The following regulations and clauses do not apply to a transportation use : 5.10.30.1, 60.30.30.20(1), and 60.30.40.70(3). Prevailing By-laws and Prevailing Sections: (A) Section 64.32(12), North York zoning by-law 7625.

By-law 569-2013, Chapter 900

Lot facts

Area
30,630 m²
Frontage
140.2 m
Depth
233.1 m
Street
High Meadow Pl
Corner lot
No
Public lane
None
House footprint
1,388 m²roof up to 12.3 m
Back yard
192.3 mhouse to rear lot line
Side yards
45.5 m and 48.6 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Signet Arrow. The lot is inside the Signet Arrow Major Transit Station Area approved by the Province (Site and Area Specific Policy 700). Source
  • Zone EH 1.0 (x9) (Employment Heavy Industrial). Chapter 60, section 60.30 of the by-law. Source

Around this lot

Minor variances approved
100%3 of 3 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a vehicle dealership.

    3605 WESTON RD · May 23, 2024 · 187 m away
  • Minor varianceApproved

    To permit a parking deficiency to accommodate a proposed one-storey addition along the Fenmar Drive frontage.

    51 SIGNET DR · Feb 23, 2022 · 394 m away
  • Minor varianceApproved

    To construct a two-storey rectory.

    2 HIGH MEADOW PL · Feb 13, 2020 · 244 m away
  • Minor varianceApproved

    To construct a two-storey east side addition. A previous Committee of Adjusment application (A325/02NY) approved variances related to gross floor area and setbacks.

    51 HIGH MEADOW PL · May 9, 2019 · 262 m away
  • Minor varianceRefused

    To construct a one-storey building in the rear yard.

    12 HIGH MEADOW PL · Aug 18, 2016 · 132 m away

Latest activity nearby

  • Building permit

    Interior reno to dental office.

    2300 FINCH AVE W · Jul 22, 2026 · 223 m away
  • Building permit

    2 Wall Signs ** C **

    30 HIGH MEADOW PL · Jun 10, 2026 · 133 m away
  • Building permit

    3 WALL SIGNS**SCOTIABANK**

    2 TORYORK DR · Apr 2, 2026 · 242 m away
  • Building permit

    Revision 01: Revision to permit to revise the front entry screenProposal for interior alterations to existing office

    30 HIGH MEADOW PL · Apr 2, 2026 · 133 m away
  • Zoning review

    Closed

    2300 FINCH AVE W · Apr 1, 2026 · 223 m away
  • Building permit

    PROPOSED SPRINKLER HEAD RELOCATION AND EXTENSION OF EXISTING WINDOW SPRINKLER SYSTEM

    30 HIGH MEADOW PL · Feb 17, 2026 · 133 m away
  • Zoning review

    Closed

    2300 FINCH AVE W · Oct 2, 2025 · 223 m away
  • Minor varianceApproved

    To permit a vehicle dealership.

    3605 WESTON RD · May 23, 2024 · 187 m away
  • Building permit

    Install 1 third party ground sign. See related variance 23-150583

    2300 FINCH AVE W · Feb 29, 2024 · 223 m away
  • Zoning review

    Cancelled

    3605 WESTON RD · Feb 6, 2024 · 187 m away

Neighbourhood: Humber Summit

About the area around the lot, not the lot itself.

Nearest station
Emery Station6 min walk
Nearest TTC stop
Weston Rd at Fenmar Dr South Side4 min walk
Nearest cycling route
Humber River Recreational Trl extensionMulti-Use Trail, 13 min walk
Nearest traffic count
19,847 vehicles in 14 hWeston Rd / Toryork Dr, 260 m away, Nov 12, 2024
Serious collisions within 500 m
22021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
Parks
Lindylou Park9 min walk
West Humber Parkland13 min walk
Habitant Park15 min walk

Schools within 1 km

  • EMERY C.I. & EMERY EDVANCE ADULT LEARNING CENTRE English Public 13 min walk
  • DAYSTROM PUBLIC SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHumber SummitMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home72%54%
Population (2021)12,18516,813
Homes built in 1960 or before16%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHumber SummitCity median
Assault1031.8636.3
Robbery191.169.5
Shootings30.610.5
Auto theft672.6192.6
Theft over $5,000191.146.1
Break and enter397.4172.8
Theft from vehicles282.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.