HousePrecheckCheck an address

20 Gerrard St EToronto · zoning, lot size and permit records

Also 22 Gerrard St E

Commercial residential · CR 3.0 (c2.0; r3.0) SS1 (x2446)49.0 × 30.9 m1,410 m²on Gerrard St Ebacks onto Ln W Church S Mc Gill

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 166459 STE 13 SA (Site Plan Approval for a 7-storey addition to the existing Covenant House Toronto. The..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 18 development applications open within 300 m, up to 85 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: WellesleyThe City plans more homes around the station: good for transit, and more building over time.
N20 m
49.0 m frontage30.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 2 building permits open, the oldest since 2005

    Needs a closer look

    Still open in the City's records: 18 196666 (Proposal for interior alterations to the existing Municipal Shelter, scope of work incl..., 2018, status Permit Issued); 04 188357 (Access for barrier free elevator to east elevation of bldg, 2005, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 166459 STE 13 SA (Site Plan Approval for a 7-storey addition to the existing Covenant House Toronto. The..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 18 development applications open within 300 m

    Good to know

    18 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review26 166459 PSPClosed
    Jun 5, 2026 · 20 GERRARD ST E
  • Development application26 166459 STE 13 SAUnder Review

    Site Plan Approval for a 7-storey addition to the existing Covenant House Toronto. The proposal would increase its youth crisis and supportive housing capacity with 158 beds (provided across a mix of dwelling rooms and dwelling units).

    May 25, 2026 · 20 GERRARD ST E · City file
  • Zoning review26 124035 ZAPClosed
    Mar 3, 2026 · 20 GERRARD ST E
  • Building permit22 139464Closed

    REPAIR AND REINSTATE BUILDING DUE TO WATER LOSS.

    Jun 14, 2022 · 20 GERRARD ST E
  • Building permit18 196666Permit Issued

    Proposal for interior alterations to the existing Municipal Shelter, scope of work includes renovations to the hvac and plumbing in the administrative, critical support, lounge and art areas.

    Aug 1, 2018 · 20 GERRARD ST E
  • Building permit11 102387Closed

    To erect and display one wall sign at the first and second storey building wall of the southerly facing elevation, in conjunction with the existing community service use located on the premises. **Covenant House**

    Jan 31, 2011 · 20 GERRARD ST E
  • Building permit08 231633Closed

    Minor interior alterations to existing hostel on the 2nd floor.

    Jan 27, 2009 · 20 GERRARD ST E
  • Building permit05 195669Closed

    install one mag lock at ground level

    Oct 26, 2005 · 20 GERRARD ST E
Show 4 older records
  • Building permit04 188357Inspection

    Access for barrier free elevator to east elevation of bldg.

    Jan 31, 2005 · 20 GERRARD ST E
  • Building permit04 137424Closed

    Install maglock on ground floor

    May 20, 2004 · 20 GERRARD ST E
  • Building permit00 144661Closed

    MAKE INTERIOR ALTERTAIONS TO PORTION OF 4TH FLOOR BY CREATING NEW OPENING BETWEEN BUILDINGS. ALSO INSTALL NEW RAMP ON ROOF OF 4TH FLOOR. (LANCE CUMBERBATCH IS FAMILIAR) EDC

    Jun 19, 2000 · 20 GERRARD ST E
  • Zoning review00 148326 000Closed
    May 5, 2000 · 20 GERRARD ST E

Check before you build

  • Site-specific exception 900.11.10(2446)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2446)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands, a parking facility is only permitted, if: (i) it is located on the same lot as a residential building , non-residential building , or a mixed use building ; and (ii) it has no more than 125% of the number of parking spaces required to be provided for the building on the lot . [TO: 438-86; 12 (2) 80]

  2. Older by-law A

    Section 12(2) 132 of former City of Toronto By-law 438-86

1 part for other addresses
  • B On 40 Gerrard St. E., former City of Toronto by-laws 277-69 and 310-71.
By-law 569-2013, Chapter 900

Lot facts

Area
1,410 m²
Frontage
49 m
Depth
30.9 m
Street
Gerrard St E
Corner lot
No
Public lane
Ln W Church S Mc Gill, 33.8 m along it
House footprint
1,257 m²roof up to 26.9 m
Back yard
0 mhouse to rear lot line
Side yards
0.1 m and 3.1 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
5house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 151, 865. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 3.0 (c2.0; r3.0) SS1 (x2446) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: honey locust (20 cm), honey locust (16 cm), honey locust (16 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
93%14 of 15 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
28

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

    332 YONGE ST · Oct 14, 2026 · 238 m away
  • Minor varianceApproved

    To alter the development standards for the previously approved 32-storey and 46-storey, two-tower mixed-use, purpose built rental development with 30 Percent affordable dwelling units and a child care center (approved under Site Specific Zoning By-law 1096-2021), by redistributing the building heights to 33 and 41storeys, increasing podium setbacks, reducing street wall heights, reducing the size of podium to create two separate buildings connected only below grade, decreasing the amount of indoor amenity space, reducing the number of two or more bedroom units, eliminating the resident and non-residential parking requirements, and decreasing the amount of residential visitor spaces. Site plan control application 19 127591 STE 13 SA is under review.

    27 GROSVENOR ST · Jul 30, 2025 · 456 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).

    241 CHURCH ST · Jul 30, 2025 · 466 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 193-2024(OLT)), for a new 59-storey mixed-use building, by permitting a private student residence use on this lot. There will be a total of 587 residential dwelling units within this building.

    510 YONGE ST · Mar 19, 2025 · 493 m away
  • Minor varianceApproved

    To alter the existing 15-storey apartment building by constructing a garbage storage enclosure (to be located on the upper-level of the underground parking garage), which will be the cause for a reduction in two vehicular parking spaces.

    145 MUTUAL ST · Feb 26, 2025 · 410 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.

    50 GERRARD ST E · Nov 25, 2026 · 173 m away
  • Zoning review

    Closed

    450 YONGE ST · Nov 23, 2026 · 272 m away
  • Zoning review

    Closed

    335 YONGE ST · Nov 23, 2026 · 239 m away
  • Building permit

    Four wall signs.***INTERNATIONAL BUSINESS UNIVERSITY***

    655 BAY ST · Nov 19, 2026 · 287 m away
  • Zoning review

    Closed

    66 GERRARD ST E · Nov 9, 2026 · 211 m away
  • Building permit

    Proposal for interior alterations, fit out for new eating establishment with karaoke rooms on the 2nd floor.

    332 YONGE ST · Nov 5, 2026 · 238 m away
  • Zoning review

    Not Started

    66 GERRARD ST E · Nov 4, 2026 · 211 m away
  • Building permit

    REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"

    355 CHURCH ST · Oct 30, 2026 · 251 m away
  • Building permit

    Proposal to install a maglock in existing office space.

    355 CHURCH ST · Oct 28, 2026 · 251 m away
  • Building permitsecondary suite

    Interior alteration, second floor additional unit

    27 MCGILL ST · Oct 27, 2026 · 64 m away

Neighbourhood: Downtown Yonge East

About the area around the lot, not the lot itself.

Nearest station
College Station2 min walk
Nearest TTC stop
Yonge St at Gerrard St West South Side2 min walk
Nearest cycling route
Gerrard St ECycle Track, 1 min walk
Nearest traffic count
17,506 vehicles in 14 hYonge St / Gerrard St E / Gerrard St W, 70 m away, Apr 12, 2025
Serious collisions within 500 m
132021–2026, killed or seriously injured: 3 fatal, 9 with pedestrians, 3 with cyclists
Parks
Joseph Sheard Parkette1 min walk
College Park2 min walk
Toronto Metropolitan University Square4 min walk

Schools within 1 km

  • TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 2 min walk
  • TMU - HEASLIP HOUSE University 5 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 5 min walk
  • TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 5 min walk
  • TAIE INTERNATIONAL INSTITUTE SCHOOL Private 5 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDowntown Yonge EastMedian neighbourhood
Median household income (2020)$69,500$84,500
Households that own their home36%54%
Population (2021)17,70016,813
Homes built in 1960 or before7%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDowntown Yonge EastCity median
Assault2360.8636.3
Robbery143.369.5
Shootings11.910.5
Auto theft75.6192.6
Theft over $5,00099.546.1
Break and enter274.7172.8
Theft from vehicles390.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.