Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Work or applications in progress
Good to knowRecent records on this lot: 26 266183 (Proposal for site servicing for a temporary construction trailer compound ( 25 230802 B..., 2026); 24 253151 (New Main Entrance Building, Secondary Entrance Building, Gunns Road Sloped Pathway with..., 2024); 22 239951 STE 09 SA (Proposed St. Clair - Old Weston GO station (Smart Track) by Metrolinx. Proposal compris..., 2022); and 2 more.
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications15 development applications open within 300 m
Good to know15 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 49 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
25 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 266183Examiner's Notice Sent
Proposal for site servicing for a temporary construction trailer compound ( 25 230802 BLD 00 NB), reconnecting water and sanitary services to existing service laterals presently extended to and capped at the property line.
Nov 5, 2026 · 2 UNION ST - Building permit25 230802Closed
Proposal for temporary structure.2-4 Union St is the site of a proposed rail-to-road transit station, currently being occupied by the construction manager as a construction laydown area to facilitate early works of the SCOW project. the temporary structure building permit is required for one(1) large trailer without wheels
Feb 3, 2026 · 2 UNION ST - Building permit24 253151Examiner's Notice Sent
New Main Entrance Building, Secondary Entrance Building, Gunns Road Sloped Pathway with two connected Pedestrian Tunnels access to the two Platforms. A new St. Clair Ave West pedestrian sloped pathway access connecting to the St. Clair Ave sidewalk.
Dec 23, 2024 · 2 UNION ST - Building permit24 182135Closed
Proposal to demolish an abandoned scale house.
Aug 22, 2024 · 2 UNION ST - Zoning review23 138819 PRZClosedSep 15, 2023 · 2 UNION ST
- Development application23 138819 STE 09 OZClosed
Proposed St. Clair - Old Weston SmartTrack (GO) station. Two new station entrance buildings with below grade connections to station platforms within the Metrolinx rail corridor and a new TTC bus loop with 7 bus bays that can accomodate 3 articulated buses, 3 standard buses and 1 Wheel-Trans bus.Proposed rezoning is intended to provide site-specific standards for building setbacks, parking and bike parking.
Apr 27, 2023 · 2 UNION ST · City file - Zoning review22 239951 PSPClosedJan 12, 2023 · 2 UNION ST
- Development application22 239951 STE 09 SAUnder Review
Proposed St. Clair - Old Weston GO station (Smart Track) by Metrolinx. Proposal comprises:- 3 entrance buildings: main entrance located at south end of site adjacent to Union St. Seconary entrance at north end of sit adjacent to Union St. Third entrance located on west side of rail corridor near planned extension of Gunns Rd.- Increase from three tracks to four mainline tracks- Three platforms to serve all four Metrolinx tracks, with canopies over at least 85% of the platformlength, enclosures at the top of stairs and elevators, passenger shelters, and all amenities such aslighting, public address, digital and static signage, and snowmelt.- Two tunnels to connect each of the platforms to a station building on the east side of the rail corridor.- Corridor station facilities including six-bay bus loop to accommodate TTC vehicle and Wheel Trans, aplaza, sidewalk, MUP and circulation space to accommodate all pedestrian and cycling activity,secure and covered cycling facilities, as well as landscaping, street furniture and plantings.
Dec 15, 2022 · 2 UNION ST · City file
Show 17 older records
- Zoning review22 226033 ZAPNotice SentNov 4, 2022 · 2 UNION ST
- Zoning review21 235872 POZClosedDec 8, 2021 · 2 UNION ST
- Development application21 235877 STE 09 SBUnder Review
3 blocks
Nov 9, 2021 · 80 UNION ST · City file - Development application21 235872 STE 09 OZOMB Appeal
The Official Plan and Zoning By-law Amendment application proposes the redevelopment of the site to permit three buildings ranging in height between 39 and 49-storeys. The application proposes 97,921 square metres of gross floor area (GFA), including 91,425 square metres of residential GFA, 6,009 square metres of office space, and 487 square metres of retail space. A total of 1,364 residential units are proposed.
Nov 9, 2021 · 80 UNION ST · City file - Zoning review19 113482 LPRClosedFeb 8, 2019 · 2 UNION ST
- Zoning review12 120281 LPRClosedFeb 9, 2012 · 2 UNION ST
- Zoning review12 117099 ZPUClosedFeb 3, 2012 · 2 UNION ST
- Zoning review09 132797 LPRClosedMay 1, 2009 · 2 UNION ST
- Zoning review09 126292 LTOClosedApr 15, 2009 · 2 UNION ST
- Building permit05 114519Closed
Demolish existing warehouse/garage & two sheds
Jun 2, 2005 · 2 UNION ST - Zoning review01 012554 LTOClosedApr 17, 2001 · 2 UNION ST
- Zoning review98 026410 LTOClosedJul 15, 1998 · 2 UNION ST
- Zoning review93 025415 LTOClosedAug 4, 1993 · 2 UNION ST
- Zoning review93 025298 LTOClosedJul 2, 1993 · 2 UNION ST
- Zoning review85 026502 LTOClosedMar 18, 1985 · 2 UNION ST
- Zoning review84 026992 LTOClosedNov 21, 1984 · 2 UNION ST
- Zoning review84 026449 LTOClosedMay 23, 1984 · 2 UNION ST
Check before you build
Site-specific exception 900.20.10(287)
Needs a closer look1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On a lot , no gross floor area maximums apply for any permitted use, subject to complying with all other applicable provisions of this By-law. [TO: 438-86; 12(1) 135]
- Older by-law A
Section 12(1) 292 of former City of Toronto By-law 438-86
2 parts for other addresses
- B On 6 Townsley St. and 31 Union St., former City of Toronto by-law 150-90
- C On 200 Union St., former City of Toronto by-law 941-88.
Lot facts
- Area
- 7,841 m²
- Frontage
- 269.9 mestimated, irregular lot
- Depth
- 64.9 mestimated, irregular lot
- Street
- Union St
- Corner lot
- No
- Public lane
- None
- House footprint
- Not showna new house or demolition permit since the City's 3D survey
- Max height
- 14 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: St. Clair-Old Weston. The lot is inside the St. Clair-Old Weston Major Transit Station Area approved by the Province (Site and Area Specific Policy 630). Source
- Keele-St.Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Zone E 1.0 (x287) (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
Around this lot
- Minor variances approved
- 67%2 of 3 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 20
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
Proposal for site servicing for a temporary construction trailer compound ( 25 230802 BLD 00 NB), reconnecting water and sanitary services to existing service laterals presently extended to and capped at the property line.
2 UNION ST · Nov 5, 2026 · 80 m away - Zoning review
Closed
90 WESTON RD · Sep 23, 2026 · 279 m away - Building permit
3 wall signs.***LOGO*** for shipping & delivery entrances for Walmart in shipping yard.
77 UNION ST · Sep 15, 2026 · 88 m away - Building permit
Proposed Exterior: New signage for deliveries and drivers, New signage for parking stalls Interior: Demolish existing rooms as noted on plan D1 .0, New shelving and stand alone refrigeration equipment, New washrooms per A 1.0, New weatherstripping on exterior doors, New millwork in offices, New penetrations for satellite dish thru roof, New RTU to suit layout per A1 .1 and mechanical drawings
77 UNION ST · Jul 9, 2026 · 88 m away - Building permit
PERMIT TO CONSTRUCT NEW EXIT CORRIDOR
77 UNION ST · Jun 18, 2026 · 88 m away - Building permit
Proposal for interior alterations to an existing restaurant
30 WESTON RD · Jun 9, 2026 · 249 m away - Building permit
Proposal to demolish existing building to prepare for the Davenport Rd Extension
1900 ST CLAIR AVE W · Jun 2, 2026 · 172 m away - Building permit
Proposal for interior alterations to fit out "Sephora" commercial retail unit.
30 WESTON RD · Apr 23, 2026 · 249 m away - Building permit
Proposal for temporary structure.2-4 Union St is the site of a proposed rail-to-road transit station, currently being occupied by the construction manager as a construction laydown area to facilitate early works of the SCOW project. the temporary structure building permit is required for one(1) large trailer without wheels
2 UNION ST · Feb 3, 2026 · 80 m away - Zoning review
Closed
611 KEELE ST · Jan 9, 2026 · 287 m away
Neighbourhood: Weston-Pelham Park
About the area around the lot, not the lot itself.
- Nearest station
- Keelesdale Station31 min walk
- Nearest TTC stop
- Weston Rd at Birdstone Cres (North)4 min walk
- Nearest cycling route
- Lavender Creek TrlMulti-Use Trail, 8 min walk
- Nearest traffic count
- 14,677 vehicles in 8 hWeston Rd / Birdstone Cres (South), 200 m away, Mar 19, 2008
- Serious collisions within 500 m
- 52021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
- Parks
- Upper Junction Park3 min walk
- S.A.D.R.A. Park3 min walk
- Turnberry South Park4 min walk
Schools within 1 km
- GENERAL MERCER JR PUBLIC SCHOOL English Public 8 min walk
- CARLETON VILLAGE JR & SR PUBLIC SCHOOL English Public 9 min walk
- ST MATTHEW CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
- ST PAUL VI CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
- HARWOOD PUBLIC SCHOOL English Public 16 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Weston-Pelham Park | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $81,000 | $84,500 |
| Households that own their home | 59% | 54% |
| Population (2021) | 10,680 | 16,813 |
| Homes built in 1960 or before | 58% | 29% |
| Homes needing major repairs | 10% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Weston-Pelham Park | City median |
|---|---|---|
| Assault | 611.3 | 636.3 |
| Robbery | 57.8 | 69.5 |
| Homicide | 8.3 | 5.3 |
| Shootings | 8.3 | 10.5 |
| Auto theft | 123.9 | 192.6 |
| Theft over $5,000 | 24.8 | 46.1 |
| Break and enter | 190 | 172.8 |
| Theft from vehicles | 404.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.