HousePrecheckCheck an address

2 The Donway EToronto · zoning, lot size and permit records

Residential multiple · RM (f21.0; a835; d1.0)56.9 × 88.0 m4,365 m²on The Donway Ecorner, also on Guytoi Crt

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 40 rental units, built 1950More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 23 139212 NNY 16 SA (2023); 21 223797 NNY 16 SB (Zoning By-law Amendment and Draft Plan of Subdivision applications to permit four resid..., 2021); 21 223792 NNY 16 OZ (Zoning By-law Amendment and Draft Plan of Subdivision applications to permit four resid..., 2021). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 29 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.
  • City upkeep score: 94 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
56.9 m frontage88.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 6 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 185807 PRS 00 IV (Order Issued Property Standards: In a dwelling unit, a window located more than 2,000 m..., 2026); 26 185799 PRS 00 IR (Property Standards, 2026); 26 170602 000 00 IR (Adequate Heat, 2026); and 3 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 23 139212 NNY 16 SA (2023); 21 223797 NNY 16 SB (Zoning By-law Amendment and Draft Plan of Subdivision applications to permit four resid..., 2021); 21 223792 NNY 16 OZ (Zoning By-law Amendment and Draft Plan of Subdivision applications to permit four resid..., 2021).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 29 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 94 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (4 storeys, 40 units, built 1950).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 185807 PRS 00 IVClosed

    Order Issued Property Standards: In a dwelling unit, a window located more than 2,000 millimetres above grade opens within 1,500 millimetres of the floor not leading to a balcony does not emplo

    Jun 16, 2026 · 2 THE DONWAY E
  • By-law investigation26 185799 PRS 00 IRClosed

    Property Standards

    Jun 16, 2026 · 2 THE DONWAY E
  • By-law investigation26 170602 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 2 THE DONWAY E
  • By-law investigation26 170601 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 2 THE DONWAY E
  • By-law investigation25 260304 PRS 00 IRClosed

    Property Standards

    Nov 29, 2025 · 2 THE DONWAY E
  • By-law investigation25 213767 PRS 00 IRClosed

    Property Standards

    Aug 20, 2025 · 2 THE DONWAY E
  • Development application23 139212 NNY 16 SAUnder Review
    Apr 28, 2023 · 2 THE DONWAY E · City file
  • Development application21 223797 NNY 16 SBUnder Review

    Zoning By-law Amendment and Draft Plan of Subdivision applications to permit four residential buildings ranging in height from 12 to 29 storeys. The proposal also includes a new public park and a new public street.

    Oct 8, 2021 · 2 THE DONWAY E · City file
Show 5 older records
  • Development application21 223792 NNY 16 OZOMB Appeal

    Zoning By-law Amendment and Draft Plan of Subdivision applications to permit four residential buildings ranging in height from 12 to 29 storeys. The proposal also includes a new public park and a new public street.

    Oct 8, 2021 · 2 THE DONWAY E · City file
  • Building permit14 240284Closed

    Fire alarm audibility upgrade

    Nov 13, 2014 · 2 THE DONWAY E
  • Building permit14 162590Closed

    Backflow preventor installation for premises isolation and expansion tank installation

    Jul 4, 2014 · 2 THE DONWAY E
  • Building permit12 180771Closed

    Berkley property management Balcony/Guard Repairs to 19 balcony repairs

    May 30, 2012 · 2 THE DONWAY E
  • Building permit08 142252Closed

    Convert existing 2-car garage into office space

    Jun 26, 2008 · 2 THE DONWAY E

Lot facts

Area
4,365 m²
Frontage
56.9 m
Depth
88 m
Street
The Donway E
Corner lot
Yes, also on Guytoi Crt88 m along it
Public lane
None
House footprint
1,032 m²roof up to 18.4 m
Back yard
9.1 mhouse to rear lot line
Side yards
12.6 m and 26.9 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
35%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Central Don Mills Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Minimum frontage 21 m. Frontage is about 56.9 m: meets the zone minimum. Source
  • Minimum lot area 835 m². Lot area is 4,365 m²: meets the minimum. Source
  • Zone RM (f21.0; a835; d1.0) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source

Around this lot

Minor variances approved
100%8 of 8 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
5

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 8 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To increase the maximum permitted height and number of storeys and reduce the required number of vehicular parking spaces.

    1030 DON MILLS RD · Mar 20, 2025 · 165 m away
  • Minor varianceApproved

    To construct a one storey rear addition and a second floor addition.

    22 FOXDEN RD · Jul 8, 2021 · 436 m away
  • Minor varianceApproved

    To facilitate in the development of two residential towers with at-grade retail uses and a shared parking garage. Please note, this application was previously deferred Thursday, September 26, 2019, in order to allow proper notification to be provided to the Public.

    1090 DON MILLS RD · Oct 23, 2019 · 454 m away
  • Minor varianceApproved

    To alter the existing dwelling by constructing an attached garage and a storage room addition.

    45 MOCCASIN TRL · Sep 27, 2018 · 420 m away
  • Minor varianceApproved

    To construct two 11-storey towers connected by a 4-storey podium with 296 residential units and 1 retail unit.

    99 THE DONWAY W · Feb 5, 2014 · 424 m away

Latest activity nearby

  • Building permit

    Back water valve installation

    20 MOCCASIN TRL · Sep 29, 2026 · 245 m away
  • Building permit

    Proposal for an addition on the front and rear of existing bungalow and interior alterations,

    4 NORTH HILLS TER · Jun 2, 2026 · 275 m away
  • Building permit

    Proposed interior alterations to finish basement. A front ground floor addition is also proposed.

    15 GUYTOI CRT · Mar 31, 2026 · 129 m away
  • Zoning review

    Not Started

    1030 DON MILLS RD · Mar 25, 2026 · 165 m away
  • Minor varianceApproved

    To alter the existing one-storey detached dwelling by constructing one-storey rear and front additions.

    4 NORTH HILLS TER · Feb 19, 2026 · 275 m away
  • Zoning review

    Application On Hold

    4 NORTH HILLS TER · Dec 8, 2025 · 275 m away
  • Building permit

    Proposd installation of inside back water walve

    1 NORTH HILLS TER · Oct 28, 2025 · 258 m away
  • Building permit

    1 Wall Sign1 Projecting Sign

    49 CLOCK TOWER RD · Jun 3, 2025 · 228 m away
  • Building permit

    Proposal to construct a 3m wide 6m deep attached garage at the end of asphalt driveway adjoining to existing bungalow house.

    1 MOCCASIN TRL · Mar 31, 2025 · 118 m away
  • Minor varianceApproved

    To increase the maximum permitted height and number of storeys and reduce the required number of vehicular parking spaces.

    1030 DON MILLS RD · Mar 20, 2025 · 165 m away

Neighbourhood: Banbury-Don Mills

About the area around the lot, not the lot itself.

Nearest station
Don Valley Station21 min walk
Nearest TTC stop
Don Mills Rd at The Donway East (South) North Side1 min walk
Nearest cycling route
Moccasin TrlMulti-Use Trail, 2 min walk
Nearest traffic count
17,840 vehicles in 8 hDon Mills Rd / The Donway E / The Donway W (South), 70 m away, Feb 28, 2023
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Moccasin Trail Park2 min walk
Don Mills Local Park4 min walk
Macklin Hancock Park9 min walk

Schools within 1 km

  • GREENLAND PUBLIC SCHOOL English Public 4 min walk
  • DON MILLS COLLEGIATE INSTITUTE English Public 7 min walk
  • DON MILLS MDL SCHOOL English Public 7 min walk
  • SENECA HILL PRIVATE SCHOOL Private 8 min walk
  • OVERLAND LEARNING CENTRE English Public 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBanbury-Don MillsMedian neighbourhood
Median household income (2020)$91,000$84,500
Households that own their home60%54%
Population (2021)27,15516,813
Homes built in 1960 or before24%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBanbury-Don MillsCity median
Assault404.9636.3
Robbery101.269.5
Shootings9.210.5
Auto theft220.9192.6
Theft over $5,00067.546.1
Break and enter248.5172.8
Theft from vehicles211.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.