HousePrecheckCheck an address

2 Scarfair PtwyToronto · zoning, lot size and permit records

Also 10 Scarfair Ptwy, 11 Scarfair Ptwy, 12 Scarfair Ptwy, 14 Scarfair Ptwy, 15 Scarfair Ptwy and 47 more

Residential multiple · RM (au270.0) (x405)≈ 147.0 × 144.9 m17,455 m²on Scarfair Ptwy

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 1.7 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 147.0 m frontage≈ 144.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit24 254889Closedsecondary suite

    Proposal for a second suite

    Jan 20, 2025 · 46 SCARFAIR PTWY
  • Building permit21 239658Closed

    Installation of a back water valve

    Nov 19, 2021 · 73 SCARFAIR PTWY
  • Building permit21 225435Closed

    Installation of backwater valve

    Oct 19, 2021 · 66 SCARFAIR PTWY
  • Building permit10 242079Closedsecondary suite

    construct new 2nd suite in basement, close main door from upper level

    Sep 17, 2010 · 66 SCARFAIR PTWY
  • Building permit10 172078Closed

    fire damage - in basement and floor joists over the basement, cracks in brick veneer at exterior window

    May 21, 2010 · 66 SCARFAIR PTWY

Check before you build

  • Site-specific exception 900.6.10(405)

    Needs a closer look

    6 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.6.10(405)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum building setback from a lot line that abuts a street is: (i) 6.0 metres for the part of main wall with a vehicle entrance to a parking space ; (ii) 6.0 metres if the lot line abuts Sewells Rd. or McLevin Avenue; and (iii) 3.0 metres in all other cases

  2. Rule B

    The minimum building setback from a lot line that does not abut a street is 6.0 metres

  3. Rule C

    The minimum building setback from a lot line for a below grade parking structures is the greater of: (i) 3.0 metres; and (ii) a distance equivalent to the vertical distance from the surface of the lowest floor of the structure to the average elevation of grade at the front lot line

  4. Rule D

    A minimum of 45% of the lot areas must be used for soft landscaping

  5. Rule E

    Parking spaces must be provided at a minimum rate of: (i) 1.4 parking spaces per dwelling unit for residents; and (ii) 0.2 parking spaces per dwelling unit must be provided for visitors

  6. Rule F

    Of the required resident parking spaces , a minimum of 1.0 parking space per dwelling unit must be either in an attached garage or below grade

By-law 569-2013, Chapter 900

Lot facts

Area
17,455 m²
Frontage
147 mestimated, irregular lot
Depth
144.9 mestimated, irregular lot
Street
Scarfair Ptwy
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
33%
  • Zone RM (au270.0) (x405) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: linden, littleleaf (27 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposed repairs to two units due to fire loss - unit # 49

    70-112 ALFORD CRES · Dec 4, 2025 · 150 m away
  • Building permit

    Proposed repairs to two units due to fire loss - unit # 47

    70-112 ALFORD CRES · Dec 4, 2025 · 150 m away
  • Building permitsecondary suite

    Proposal to convert existing single family detached dwelling to two units and add a basement walk out.

    62 CARONIA SQ · Oct 15, 2025 · 296 m away
  • Building permitsecondary suite

    Proposal for a second suite

    46 SCARFAIR PTWY · Jan 20, 2025 · 57 m away
  • Building permit

    Garage Waterproofing Replacement and concrete repairs

    182-250 BRENYON WAY · Apr 30, 2024 · 265 m away
  • Building permit

    Garage Waterproofing Replacement and concrete repairs

    182-250 BRENYON WAY · Apr 30, 2024 · 265 m away
  • Building permit

    Renovation of four existing boys and girls washrooms on the 1st and 2nd floors with new interior finishes and plumbing fixtures.

    10 JOHN TABOR TRL · Mar 12, 2024 · 190 m away
  • Building permit

    REVISED - updated guardrailsProposed Balcony Remedial Work at Apartment Building:Isolated Concrete and Brick Masonry Repair at All BalconiesReplacement of Existing Guardrails and Dividing Panels with New at All BalconiesWaterproofing Application at All BalconiesReplacement of Exisitng Metal Railing with New at Specified Locations at Ground Level

    35 SEWELLS RD · Feb 23, 2024 · 278 m away
  • Building permit

    Proposed Building Envelope Remedial Work at all Townhouse Blocks:-Reconstruct wood decks and stairs at specified rear patios with new to suit re-cladding work-Rebuild wood balconies with new wood balconies & pref. alum. guardrails to suit re-cladding work

    245 BRENYON WAY · Nov 3, 2023 · 215 m away
  • Building permit

    Repair to existing dwelling due to fire damage and new rear exterior deck

    36 WAYFORD CRES · Jun 30, 2023 · 150 m away

Neighbourhood: Malvern East

About the area around the lot, not the lot itself.

Nearest TTC stop
McLevin Ave at Empringham Dr East Side3 min walk
Nearest cycling route
Scarborough Railpath TrlMulti-Use Trail, 12 min walk
Nearest traffic count
5,524 vehicles in 14 hSewells Rd / Alford Cres, 260 m away, Dec 11, 2024
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Malvern Park5 min walk
Wickson Trail Park6 min walk
Shawn "blu" Rose Park6 min walk

Schools within 1 km

  • ST COLUMBA CATHOLIC ELEMENTARY SCHOOL English Separate 3 min walk
  • ST MOTHER TERESA CATHOLIC ACADEMY English Separate 5 min walk
  • GREY OWL JR PUBLIC SCHOOL English Public 7 min walk
  • EMILY CARR PUBLIC SCHOOL English Public 8 min walk
  • MALVERN MONTESSORI SCHOOL Private 8 min walk
  • ALEXANDER STIRLING PUBLIC SCHOOL English Public 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMalvern EastMedian neighbourhood
Median household income (2020)$85,000$84,500
Households that own their home70%54%
Population (2021)26,09516,813
Homes built in 1960 or before4%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMalvern EastCity median
Assault505.9636.3
Robbery80.869.5
Auto theft224.8192.6
Theft over $5,00035.146.1
Break and enter80.8172.8
Theft from vehicles186.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.