HousePrecheckCheck an address

2 Prospect StToronto · zoning, lot size and permit records

Also 565 Ontario St

Residential · R (d1.0) (x881)19.4 × 21.8 m399 m²on Prospect Stcorner, also on Ontario St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 15 rental units, built 1910More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 20 210318 (Proposal to install sprinklers in an existing apartment building, 2020, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 47 storeysNew buildings may go up around here in the next years. More change nearby than at 97% of Toronto houses.
  • City upkeep score: 73 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: SherbourneThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N10 m
19.4 m frontage21.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: in a Heritage Conservation District (Part V)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Building permit open since 2020

    Needs a closer look

    Still open in the City's records: 20 210318 (Proposal to install sprinklers in an existing apartment building, 2020, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 7 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 257681 PRS 00 IR (Property Standards, 2026); 26 245459 PRS 00 IR (Property Standards, 2026); 26 236447 PRS 00 IR (Property Standards, 2026); and 4 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 47 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 73 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (4 storeys, 15 units, built 1910).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

11 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 257681 PRS 00 IRClosed

    Property Standards

    Oct 20, 2026 · 2 PROSPECT ST
  • By-law investigation26 245459 PRS 00 IRClosed

    Property Standards

    Sep 28, 2026 · 2 PROSPECT ST
  • By-law investigation26 236447 PRS 00 IRClosed

    Property Standards

    Sep 12, 2026 · 2 PROSPECT ST
  • By-law investigation26 231256 PRS 00 IRClosed

    Property Standards

    Sep 2, 2026 · 2 PROSPECT ST
  • By-law investigation26 226023 WST 00 IRClosed

    Waste

    Aug 26, 2026 · 2 PROSPECT ST
  • By-law investigation26 219616 PRS 00 IRClosed

    Property Standards

    Aug 13, 2026 · 2 PROSPECT ST
  • By-law investigation26 199434 LGW 00 IRClosed

    Long Grass and Weeds

    Jul 10, 2026 · 2 PROSPECT ST
  • By-law investigation26 148730 PRS 00 IRClosed

    Property Standards

    Apr 23, 2026 · 2 PROSPECT ST
Show 3 older records
  • By-law investigation25 245900 HEA 00 IRClosed

    Adequate Heat

    Oct 28, 2025 · 2 PROSPECT ST
  • Building permit20 210318Permit Issued

    Proposal to install sprinklers in an existing apartment building.

    Nov 26, 2020 · 2 PROSPECT ST
  • Building permit14 173199Closed

    To repair the deocrative cornices on the south and west second floor balonconies of the exisiting four storey apartment building.

    Jun 18, 2014 · 2 PROSPECT ST

Check before you build

  • Site-specific exception 900.2.10(881)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(881)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(4).

  2. Older by-law A

    Section 12(1) 434 of former City of Toronto By-law 438-86

2 parts for other addresses
  • B On 54 Aberdeen Ave., former City of Toronto by-law 234-69
  • C On 253 Wellesley St. E., former City of Toronto by-law 326-87.
By-law 569-2013, Chapter 900

Lot facts

Area
399 m²
Frontage
19.4 m
Depth
21.8 m
Street
Prospect St
Corner lot
Yes, also on Ontario St21.8 m along it
Public lane
None
House footprint
266 m²roof up to 14.2 m
Back yard
4.3 mhouse to rear lot line
Side yards
0 m and 1 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
2house, garage, sheds
Max height
13 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Sherbourne. The lot is inside the Sherbourne Major Transit Station Area approved by the Province (Site and Area Specific Policy 601). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x881) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: maple, norway (45 cm), maple, norway (37 cm), maple, norway columnar (14 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
88%14 of 16 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
7
Development applications
13

Within 300 m, last 10 years. 8 suite and multiplex permits: more than at 70% of Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a side (south) two storey addition. Also, to construct rear ground floor and second storey bay windows, a rear second storey balcony, and a rear third storey rooftop pergola and terrace extension (above the second storey roof).

    380 BERKELEY ST · Jun 3, 2026 · 434 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear (east) ground floor addition and a rear third storey addition with a rear roof deck.

    21 METCALFE ST · Apr 29, 2026 · 422 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a ground floor stair landing, and a side (south) basement walkout. The existing basement walkout and rear deck with be demolished, and a portion of the rear second storey roof will be reconstructed. Also, to construct one additional parking space (for a total of two parking spaces), abutting the laneway.

    388 BERKELEY ST · Feb 18, 2026 · 413 m away
  • Minor varianceApproved

    To alter the existing three-storey semi-detached dwelling by constructing a rear third storey addition (enclosing a portion of the existing terrace).

    32 SALISBURY AVE · Jul 30, 2025 · 486 m away
  • Minor varianceApproved

    To alter the existing three-storey townhouse dwelling by constructing a new rear one-storey addition (with basement below), a side (east) basement walkout and a rear second storey rooftop deck (above the new rear addition). The existing rear one-storey addition will be demolished.

    20 ABERDEEN AVE · Nov 6, 2024 · 238 m away

Latest activity nearby

  • Minor variancePending

    To alter the existing two-and-one-half-storey semi-detached mixed-use building by constructing a rear one-storey addition. There is one non-residential unit (eating establishment) occupying the basement and ground floor, and one residential dwelling unit occupying the second and third levels. The existing rear yard parking space will be removed.

    546 PARLIAMENT ST · Nov 25, 2026 · 193 m away
  • Building permit

    REVISION - EXIT STAIR FLIPPED TO RUN SOUTH WITH NEW LANDING/FOUNDATIONS, EXIT DOOR RELOCATED, 2 NEW WINDOWS IN WEST WALL. NO CHANGE TO USE OR AREA.Proposal for interior alteration to add a partial new floor area on the 2nd floor of the building; Health & Fitness Club ( Group D & A2).

    159 BLEECKER ST · Nov 25, 2026 · 125 m away
  • Building permit

    Building a 10' x 12' deck to replace the previously existing deck.

    27 WINCHESTER ST · Nov 19, 2026 · 206 m away
  • Zoning review

    Not Started

    311 WELLESLEY ST E · Nov 10, 2026 · 269 m away
  • Building permit

    Proposal to undertake Exterior Renovations (AODA), including modifications to exterior parking areas, line painting, stairs (guards, handrails, and tactile warning indicators), installation of permeable pavers, and curbs to improve accessibility and bring the site into compliance with AODA requirements.

    439 SHERBOURNE ST · Nov 3, 2026 · 177 m away
  • Zoning review

    Closed

    405 SHERBOURNE ST · Oct 30, 2026 · 277 m away
  • Building permit

    Proposal for backwater valve installation

    490 ONTARIO ST · Oct 23, 2026 · 242 m away
  • Building permit

    Backwater valve installation

    488 ONTARIO ST · Oct 21, 2026 · 254 m away
  • Building permit

    Proposed geothermal system for new building

    405 SHERBOURNE ST · Oct 20, 2026 · 277 m away
  • Building permit

    Revision 04: Revision to permit, updating fire alarm and sprinkler layoutRevision 03: Proposed revision - scope of revision includes Unit #3 (partial 3rd floor and 4th floor) interior layout changes, Private elevator from Ground floor to 3rd floor for the use of Unit #3, Roof access stair and enclosure, cladding change at 4th floor (from stucco to metal siding)Revision 02 - Partial 4th storey at rear (east side), Dwelling Unit #3 to become a storey unit (no changes in unit count), interior layout changes to suit as-built, structural upgrades to accommodate additional storey.Revision 01 - roof access stair and enclosure (no occupancy on roof, maintenance only)To construct a rear addition, one storey front addition, basement underpinning, interior alterations - ground floor retail space (for future tenant) - four residential units

    549 PARLIAMENT ST · Oct 20, 2026 · 253 m away

Neighbourhood: Cabbagetown-South St.James Town

About the area around the lot, not the lot itself.

Nearest station
Sherbourne Station11 min walk
Nearest TTC stop
Wellesley St East at Ontario St2 min walk
Nearest cycling route
Wellesley St ECycle Track, 2 min walk
Nearest traffic count
5,772 vehicles in 8 hWellesley St E / Ontario St, 110 m away, Apr 7, 2022
Serious collisions within 500 m
52021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 1 with cyclists
Parks
Winchester Park1 min walk
Bleecker Parkette1 min walk
Winchester Square Park4 min walk

Schools within 1 km

  • WINCHESTER JR & SR PUBLIC SCHOOL English Public 1 min walk
  • OUR LADY OF LOURDES CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk
  • ROSE AVENUE JR PUBLIC SCHOOL English Public 7 min walk
  • JARVIS COLLEGIATE INSTITUTE English Public 8 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 9 min walk
  • NATIONAL BALLET SCHOOL - THE SHOE ROOM Private 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureCabbagetown-South St.James TownMedian neighbourhood
Median household income (2020)$76,500$84,500
Households that own their home45%54%
Population (2021)11,02016,813
Homes built in 1960 or before42%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleCabbagetown-South St.James TownCity median
Assault1078.6636.3
Robbery145.369.5
Auto theft91.8192.6
Theft over $5,00022.946.1
Break and enter321.3172.8
Theft from vehicles229.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.