HousePrecheckCheck an address

2 Portland StToronto · zoning, lot size and permit records

Also 10B Portland St, 10C Portland St, 11 Niagara St, 12A Portland St, 12B Portland St and 24 more

Commercial residential employment · CRE (x1)≈ 80.4 × 105.9 m5,270 m²on Front St Wcorner, also on Portland St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.5 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 26 126924 STE 10 SA (The 2025 Proposal is a 37-storey tower with a total of 268 units and ~350m2 of ground f..., 2026); 22 151499 STE 10 OZ (Official Plan Amendment for a 23 storey mixed-use building, having a non-residential gr..., 2022); 21 232793 STE 10 OZ (Resubmission of the Zoning By-law Amendment to permit the redevelopment of the site wit..., 2021). Larger work can mean noise and trucks next door; read what each one is for.
  • 11 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: King-BathurstThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 80.4 m frontage≈ 105.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2013

    Needs a closer look

    Still open in the City's records: 14 134517 (Proposal for interior alterations on all levels, 2014, status Inspection); 13 166244 (Change/replacement of defective potable water piping (25 m) in existing townhouse - SFD, 2013, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 126924 STE 10 SA (The 2025 Proposal is a 37-storey tower with a total of 268 units and ~350m2 of ground f..., 2026); 22 151499 STE 10 OZ (Official Plan Amendment for a 23 storey mixed-use building, having a non-residential gr..., 2022); 21 232793 STE 10 OZ (Resubmission of the Zoning By-law Amendment to permit the redevelopment of the site wit..., 2021).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 11 development applications open within 300 m

    Good to know

    11 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • Development application26 126924 STE 10 SAApplication Received

    The 2025 Proposal is a 37-storey tower with a total of 268 units and ~350m2 of ground floor non-residential GFA. Of the 268 units, over 50% of the units are larger two- and three-bedroom units and 30% of the total units are planned to be affordable.

    Mar 9, 2026 · 150 QUEENS WHARF RD · City file
  • Development application25 257206 STE 10 OZClosed

    Proposed increase in height from the previously approved 29-storey tower to a 37-storey tower. The proposal increases the GFA by 3591 square metres and reduces the number of dwelling units from 282 to 268 total units.

    Nov 21, 2025 · 150 QUEENS WHARF RD · City file
  • Development application22 151499 STE 10 OZOMB Approved

    Official Plan Amendment for a 23 storey mixed-use building, having a non-residential gross floor area of 2,640 square metres, and a residential gross floor area of 14,459.90 square metres. A total of 182 residential dwelling units are proposed. (This proposal is being reviewed in conjunction with an application to Amend the Zoning By-law, File No. 21-232793 STE 10 OZ)

    May 25, 2022 · 9 NIAGARA ST · City file
  • Development application21 232793 STE 10 OZOMB Approved

    Resubmission of the Zoning By-law Amendment to permit the redevelopment of the site with a 18-storey mixed-use building (60 metres including mechanical penthouse) containing retail and office space on the ground floor, two levels of office space, and 162 dwelling units above.

    Nov 1, 2021 · 9 NIAGARA ST · City file
  • Development application21 146032 STE 10 OZClosed

    150 Queens Wharf Road Housing Now Zoning By-law Amendment application to facilitate the development of the site for a 29-storey mixed-use building having a non-residential gross floor area of 307.0 square metres, and a residential gross floor area of 21,593.0 square metres. A total of 282 residential dwelling units are proposed.

    Apr 26, 2021 · 150 QUEENS WHARF RD · City file
  • Building permit14 134517Inspection

    Proposal for interior alterations on all levels

    Apr 2, 2014 · 15 NIAGARA ST
  • Building permit14 105561Closed

    relocate kitchen fixtures from front to rear of house, piping only

    Feb 19, 2014 · 15 NIAGARA ST
  • Building permit13 166244Inspection

    Change/replacement of defective potable water piping (25 m) in existing townhouse - SFD

    May 10, 2013 · 27 NIAGARA ST
Show 1 older records
  • Building permit00 361111Cancellednew building, new house

    Alter plans as approved under file 422130 by installing heat detection and audible signal system to row housing 4 blocks consisting of 73 units. originally taken under 10 Portland St.

    Dec 18, 2000 · 11 NIAGARA ST

Check before you build

  • Site-specific exception 900.12.10(1)

    Needs a closer look

    2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.12.10(1)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(2) 260 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(2) 270 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
5,270 m²
Frontage
80.4 mestimated, irregular lot
Depth
105.9 mestimated, irregular lot
Street
Front St W
Corner lot
Yes, also on Portland St105.9 m along it
Public lane
None
Max height
30 m
Max lot coverage
—
  • Major Transit Station Area: King-Bathurst. The lot is inside the King-Bathurst Major Transit Station Area approved by the Province (Site and Area Specific Policy 761). Source
  • King-Spadina Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CRE (x1) (Commercial Residential Employment). Chapter 50, section 50.10 of the by-law. Source
  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: linden, littleleaf (31 cm), linden, littleleaf (28 cm), linden, littleleaf (28 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
94%16 of 17 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
36

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 17 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To alter the development standards for the mixed-use building (stepping up to 14-storeys (45 m), as approved under Site Specific Zoning By-law 1247-2022 (OLT), by increasing the building height, the number of storeys (stepping up to 17-storeys (54.5 m), the total gross floor area (for residential and non-residential uses), and the total number of residential dwelling units (including a reduction in the proportion of three-bedroom units). Also, to reduce the minimum required outdoor amenity space, the number of required residential and visitor parking spaces, the number of parking spaces equipped with an energized outlet, the number of oversized bicycle parking spaces, and the minimum width of two short-term bicycle parking spaces. The altered mixed-use building will contain commercial uses on the first and second storeys, indoor and outdoor amenity spaces on the second storey, and a total of 162 residential dwelling units.

    485 WELLINGTON ST W · Oct 7, 2026 · 167 m away
  • Minor varianceApproved

    To alter the development standards for the 15-storey (50 m) mixed-use building (as approved under Site Specific Zoning By-Law 1047-2022), by increasing the overall height, number of dwelling units, and residential gross floor area, and to reduce loading and bicycle parking spaces.

    462 WELLINGTON ST W · Mar 26, 2025 · 255 m away
  • Minor varianceApproved

    To permit the undersized loading spaces (Type C) in the parking level of a 15 storey mixed-use building (currently under construction).

    530 FRONT ST W · Jun 12, 2024 · 85 m away
  • Minor varianceApproved

    To construct a new two-storey building (to contain a restaurant) with a rooftop patio.

    480 ADELAIDE ST W · Mar 22, 2023 · 483 m away
  • Minor varianceApproved

    To permit a new eating establishment with an entertainment area (bowling alley) on Level P2 of Building D ("The Well").

    480 FRONT ST W · Sep 21, 2022 · 236 m away

Latest activity nearby

  • Building permit

    Rev 01 - Changing washroom/shower layout and reducing it down to 2 showersCommercial renovation to operate pilates fitness classes in a studio, and enhancing the plumbing to provide 3 washrooms and 3 showers.

    517 WELLINGTON ST W · Nov 23, 2026 · 124 m away
  • Building permit

    Proposal for installation of pre-fabricated wood frame geodesic dome structure and accompanying floor system. three domes to be installed, QTY 2 17' wide domes and QTY 1 22' wide dome. Domes to be used as a temporary event space during the winter months

    486 FRONT ST W · Nov 18, 2026 · 205 m away
  • Building permit

    Proposal to demolish existing partial wall and construct a tenant demising wall at Level 1, Area C north lobby.

    530 FRONT ST W · Nov 18, 2026 · 85 m away
  • Building permit

    Proposal for interior alterations to PH-7 unit

    21 ICEBOAT TER · Nov 17, 2026 · 236 m away
  • Building permit

    REVISION - designate the patio as a private patio Proposal for interior alterations -Restaurant greater than 30 seats

    486 FRONT ST W · Nov 10, 2026 · 205 m away
  • Building permit

    Proposal for alternative solution for the turnstiles for access control to meet the intent of the OBC for egress and barrier-free accessibility requirements

    530 FRONT ST W · Oct 30, 2026 · 85 m away
  • Zoning review

    Closed

    480 FRONT ST W · Oct 29, 2026 · 236 m away
  • Building permit

    Proposal for interior alterations to office spaces on Level 01, 07 and 08.

    530 FRONT ST W · Oct 29, 2026 · 85 m away
  • Building permit

    Proposal for one tiny pub and one pergola at the well open area, install date November 24th 2026 , tear down dates : November 30th 2026

    486 FRONT ST W · Oct 29, 2026 · 205 m away
  • Building permit

    Structural slab infill at openings on L4&6.

    480 FRONT ST W · Oct 28, 2026 · 236 m away

Neighbourhood: Wellington Place

About the area around the lot, not the lot itself.

Nearest station
St. Andrew Station21 min walk
Nearest TTC stop
Bathurst St at Niagara St3 min walk
Nearest cycling route
Bridge of LightMulti-Use Trail - Boulevard, 1 min walk
Nearest traffic count
8,130 vehicles in 14 hPortland St / Front St W / Bridge of Light, 70 m away, Jun 30, 2026
Serious collisions within 500 m
102021–2026, killed or seriously injured: 0 fatal, 5 with pedestrians, 4 with cyclists
Parks
Victoria Memorial Square Park1 min walk
Draper Park3 min walk
Northern Linear Park3 min walk

Schools within 1 km

  • ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 7 min walk
  • JEAN LUMB PUBLIC SCHOOL English Public 8 min walk
  • BISHOP MACDONELL CATHOLIC ELEMENTARY English Separate 8 min walk
  • ST MARY CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • CITY SCHOOL English Public 10 min walk
  • THE WATERFRONT SCHOOL English Public 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWellington PlaceMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home38%54%
Population (2021)25,57016,813
Homes built in 1960 or before2%29%
Homes needing major repairs1%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWellington PlaceCity median
Assault1169.6636.3
Robbery8269.5
Homicide5.35.3
Shootings10.610.5
Auto theft97.9192.6
Theft over $5,00087.346.1
Break and enter293.7172.8
Theft from vehicles211.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.