HousePrecheckCheck an address

2 Milepost PlToronto · zoning, lot size and permit records

Residential apartment · RA (f30.0; a930; d1.25)≈ 105.8 × 60.5 m4,813 m²on Milepost Pl

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 6 storeys, 77 rental units, built 1960More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 26 196387 NNY 15 OZ (Zoning By-law Amendment for three residential buildings containing 1,300 new and rental..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.
  • City upkeep score: 92 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Thorncliffe ParkThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
≈ 105.8 m frontage≈ 60.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2008

    Needs a closer look

    Still open in the City's records: 19 209977 (Proposed interior alterations to existing apartment building, 2019, status Inspection); 08 154296 (Exterior roof sab replacement, 2008, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 4 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards, Zoning): 26 209935 ZON 00 IR (Zoning, 2026); 25 197735 PRS 00 IR (Property Standards, 2025); 25 136608 PRS 00 IR (Property Standards, 2025); and 1 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 196387 NNY 15 OZ (Zoning By-law Amendment for three residential buildings containing 1,300 new and rental..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 92 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (6 storeys, 77 units, built 1960).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 209935 ZON 00 IRClosed

    Zoning

    Jul 28, 2026 · 2 MILEPOST PL
  • Zoning review26 196387 PRZClosed
    Jul 27, 2026 · 2 MILEPOST PL
  • Development application26 196387 NNY 15 OZUnder Review

    Zoning By-law Amendment for three residential buildings containing 1,300 new and rental replacement dwelling units.

    Jul 6, 2026 · 2 MILEPOST PL · City file
  • By-law investigation25 197735 PRS 00 IRClosed

    Property Standards

    Jul 21, 2025 · 2 MILEPOST PL
  • By-law investigation25 136608 PRS 00 IRClosed

    Property Standards

    Mar 28, 2025 · 2 MILEPOST PL
  • By-law investigation25 103578 PRS 00 IRClosed

    Property Standards

    Jan 11, 2025 · 2 MILEPOST PL
  • Building permit24 229607Closed

    Proposal for balcony repairs with guard replacement to an existing apartment building.

    Nov 20, 2024 · 2 MILEPOST PL
  • Building permit19 209977Inspection

    Proposed interior alterations to existing apartment building.

    Nov 19, 2019 · 2 MILEPOST PL
Show 4 older records
  • Building permit09 160605Closed

    Install one back flow preventer

    Sep 4, 2009 · 2 MILEPOST PL
  • Building permit08 154296Inspection

    Exterior roof sab replacement

    Aug 12, 2008 · 2 MILEPOST PL
  • Building permit02 179856Closed

    FIRE ALARM SYSTEM UPGRADE

    Oct 29, 2002 · 2 MILEPOST PL
  • Building permit98 207097Closed

    CONC.RALGS/BAL.REPAIRS

    Apr 19, 2001 · 2 MILEPOST PL

Lot facts

Area
4,813 m²
Frontage
105.8 mestimated, irregular lot
Depth
60.5 mestimated, irregular lot
Street
Milepost Pl
Corner lot
No
Public lane
None
House footprint
1,242 m²roof up to 23.9 m
Back yard
9.3 mhouse to rear lot line
Side yards
11.5 m and 31.6 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
28 m
Max lot coverage
30%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Thorncliffe Park. The lot is inside the Thorncliffe Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 767). Source
  • Minimum frontage 30 m. Frontage is about 105.8 m (estimated, irregular lot): meets the zone minimum. Source
  • Minimum lot area 930 m². Lot area is 4,813 m²: meets the minimum. Source
  • Zone RA (f30.0; a930; d1.25) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source

Around this lot

Minor variances approved
100%2 of 2 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    convert storage space in apt building to new 3 bedroom apt unit

    26 THORNCLIFFE PARK DR · Jun 22, 2017 · 220 m away

Latest activity nearby

  • Zoning review

    Closed

    1 LEASIDE PARK DR · Oct 5, 2026 · 251 m away
  • Building permit

    Proposal for interior alterations to combine existing Units 1 and 2 and fit out the space as a restaurant, with an occupant load of 25. No changes are proposed to the building envelope or structure.

    1 LEASIDE PARK DR · Aug 24, 2026 · 251 m away
  • Zoning review

    Closed

    2 MILEPOST PL · Jul 27, 2026 · 15 m away
  • Zoning review

    Cancelled

    1 LEASIDE PARK DR · Jul 21, 2026 · 251 m away
  • Building permit

    Proposed interior alteations to existing Community Services- no change in use or occupancy

    18 THORNCLIFFE PARK DR · Jul 20, 2026 · 209 m away
  • Development application

    Zoning By-law Amendment for three residential buildings containing 1,300 new and rental replacement dwelling units.

    2 MILEPOST PL · Jul 6, 2026 · 15 m away · City file
  • Zoning review

    Closed

    1 LEASIDE PARK DR · Jun 15, 2026 · 251 m away
  • Building permit

    Removal and replacement of deteriorated balcony components, including concrete spall repair,delamination repair, soffit repair, and through-slab repairs. Supply and installation of new balconywaterproofing membrane (approximately 600 m²). Removal and replacement of sealants at balconydoors, windows, and joints. Repair of localized EIFS cladding and associated work.

    1 LEASIDE PARK DR · Jun 4, 2026 · 251 m away
  • Building permit

    Proposal to replace Fire Alarm Panel

    15 THORNCLIFFE PARK DR · Apr 17, 2026 · 99 m away
  • Zoning review

    Closed

    1 LEASIDE PARK DR · Mar 17, 2026 · 251 m away

Neighbourhood: Thorncliffe Park

About the area around the lot, not the lot itself.

Nearest station
Sunnybrook Park Station26 min walk
Nearest TTC stop
Thorncliffe Park Dr at Milepost Pl2 min walk
Nearest cycling route
Thorncliffe Park DrCycle Track, 2 min walk
Nearest traffic count
19,697 vehicles in 14 hOverlea Blvd / Leaside Park Dr, 260 m away, Sep 16, 2026
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 0 with cyclists
Parks
Leaside Park1 min walk
E.T. Seton Park2 min walk
R.V. Burgess Park4 min walk

Schools within 1 km

  • OVERLEA LINC English Public 5 min walk
  • THORNCLIFFE PARK PUBLIC SCHOOL English Public 8 min walk
  • FRASER MUSTARD EARLY LEARNING ACADEMY English Public 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureThorncliffe ParkMedian neighbourhood
Median household income (2020)$67,000$84,500
Households that own their home14%54%
Population (2021)20,40016,813
Homes built in 1960 or before21%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleThorncliffe ParkCity median
Assault638636.3
Robbery83.969.5
Auto theft377.7192.6
Theft over $5,00054.646.1
Break and enter104.9172.8
Theft from vehicles226.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.