HousePrecheckCheck an address

2 Leafy WoodwayToronto · zoning, lot size and permit records

Also 10 Leafy Woodway, 12 Leafy Woodway, 18 Leafy Woodway, 20 Leafy Woodway, 22 Leafy Woodway and 5 more

39.6 × 71.1 m2,624 m²on Leafy Woodway

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.3 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 5 development applications open within 300 m, up to 50 storeysNew buildings may go up around here in the next years. More change nearby than at 91% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
39.6 m frontage71.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 50 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,624 m²
Frontage
39.6 m
Depth
71.1 m
Street
Leafy Woodway
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%7 of 7 decisions
    Garden suite permits
    1
    Laneway suite permits
    0
    Multiplex permits
    3
    Development applications
    7

    Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 7 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To convert the existing building into a place of worship.

      95 JONESVILLE CRES · Jun 18, 2026 · 490 m away
    • Minor varianceApproved

      To construct a new two-storey detached dwelling with an integral garage.

      62 SADDLE RIDGE DR · Oct 10, 2024 · 189 m away
    • Minor varianceApproved

      To reduce the number of required residential, non-residential and visitor parking spaces. Cross Reference Draft Plan of Subdivision Application No. 21 208865 ESC 20 SB, which is currently under review. Cross Reference Minor Variance Application No. A0237/23SC. This application correctly identifies all municipal addresses subject of the application.

      1 EGLINTON SQ · Jul 24, 2024 · 294 m away
    • Minor varianceApproved

      To reduce the number of required residential, non-residential and visitor parking spaces. Cross Reference Consent Application B0039/22SC under review, previous Consent Application B015/01SC. This property is subject to an Official Plan and Zoning By-law Amendment application which was approved by the Ontario Land Tribunal (OLT Decision OLT-22-003152). The property is also subject of a Draft Plan of Subdivision Application File # 21 208865 ESC 20 SB, which is currently under review.

      1 EGLINTON SQ · Jan 17, 2024 · 294 m away
    • Minor varianceApproved

      Proposal for a rear addition.

      25 TISDALE AVE · Nov 23, 2023 · 181 m away

    Latest activity nearby

    • Zoning review

      Application On Hold

      1861 O'CONNOR DR · Nov 26, 2026 · 104 m away
    • Building permit

      Interior demolition of 2 storey former HBC building to shell condition, make safe electrical and mechanical systems in preparation for next phase.

      1 EGLINTON SQ · Nov 12, 2026 · 294 m away
    • Building permit

      Proposal to demolish existing garage and build a new garage

      22 BARTLEY DR · Oct 16, 2026 · 141 m away
    • Zoning review

      Notice Sent

      79 BARTLEY DR · Oct 14, 2026 · 158 m away
    • Zoning review

      Closed

      1861 O'CONNOR DR · Jul 28, 2026 · 104 m away
    • Building permit

      Proposed interior alterations to an optical store. Scope includes demolition of existing partition walls and addition of new partition walls for an optical retailer with an on-site optometrist.

      1 EGLINTON SQ · Jul 8, 2026 · 294 m away
    • Building permit

      Replacement of Existing Fire Protection System, including Fire Pump, Jockey Pump, pumpof the proposed work controllers, and bringing up-to-code Normal and Emergency Power Supply to Fire Pump.

      1420 VICTORIA PARK AVE · May 6, 2026 · 167 m away
    • Building permit

      Proposal to replace existing standpipe fire pump.

      1880 O'CONNOR DR · Apr 10, 2026 · 77 m away
    • Building permit

      Proposal to replace the existing block partywall in the attic due to structural damage. New fire rated partywall in the attic between 64 and 66 Pinewood Ave.

      66 PINEBROOK AVE · Mar 12, 2026 · 257 m away
    • Building permit

      Proposal to replace the existing block partywall in the attic due to structural damage. New fire rated partywall in the attic between 64 and 66 Pinewood Ave.

      64 PINEBROOK AVE · Mar 12, 2026 · 254 m away

    Neighbourhood: Victoria Village

    About the area around the lot, not the lot itself.

    Nearest station
    O'Connor Station6 min walk
    Nearest TTC stop
    O'Connor Dr at Cranborne Ave3 min walk
    Nearest cycling route
    Eglinton Ave EBike Lane, 5 min walk
    Nearest traffic count
    11,063 vehicles in 8 hO'Connor Dr: Sunrise Ave - Leafy Woodway, 180 m away, May 19, 2015
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
    Parks
    Warner Park4 min walk
    Victoria Park - Eglinton Parkette4 min walk
    Bartley Park5 min walk

    Schools within 1 km

    • O'CONNOR PUBLIC SCHOOL English Public 10 min walk
    • CLAIRLEA PUBLIC SCHOOL English Public 15 min walk
    • IMAM ALI ISLAMIC CENTRE AND AL HAADI ACADEMY SCHOOL Private 16 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureVictoria VillageMedian neighbourhood
    Median household income (2020)$68,000$84,500
    Households that own their home41%54%
    Population (2021)17,36516,813
    Homes built in 1960 or before29%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleVictoria VillageCity median
    Assault591.2636.3
    Robbery20.469.5
    Auto theft285.4192.6
    Theft over $5,00030.646.1
    Break and enter208.9172.8
    Theft from vehicles178.4188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 29, 2026, published Nov 27, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
    • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
    • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
    • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
    • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
    • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
    • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
    • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.