HousePrecheckCheck an address

2 Grandstand PlToronto · zoning, lot size and permit records

Residential apartment · RA (f30.0; a930; d1.25)≈ 71.1 × 106.8 m3,886 m²on Grandstand Pl

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 6 storeys, 60 rental units, built 1960More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.
  • 2 open orders or by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 224765 PRS 00 IV (Order Issued Property Standards: Required guard does not prevent the passage of a spher..., 2026, status Order Issued); 26 224649 PRS 00 IR (Property Standards, 2026, status Order Issued).
  • City upkeep score: 90 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Thorncliffe ParkThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
≈ 71.1 m frontage≈ 106.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 open orders or by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 224765 PRS 00 IV (Order Issued Property Standards: Required guard does not prevent the passage of a spher..., 2026, status Order Issued); 26 224649 PRS 00 IR (Property Standards, 2026, status Order Issued).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 11 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 232133 PRS 00 IV (Order Issued Property Standards: Ceiling not maintained free of holes, cracks, damaged..., 2026); 26 231373 PRS 00 IR (Property Standards, 2026); 26 221910 PRS 00 IV (Order Issued Property Standards: The plumbing system is not kept in good working order...., 2026); and 8 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 90 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (6 storeys, 60 units, built 1960).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

15 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 232133 PRS 00 IVClosed

    Order Issued Property Standards: Ceiling not maintained free of holes, cracks, damaged and deteriorated materials.Namely: Black discolouration on ceiling.; The ventilation system or unit is not kept in good repair and maintained in good working condition at all times.Namely: Ventilation does not appear to be functi

    Sep 2, 2026 · 2 GRANDSTAND PL
  • By-law investigation26 231373 PRS 00 IRClosed

    Property Standards

    Sep 2, 2026 · 2 GRANDSTAND PL
  • By-law investigation26 224765 PRS 00 IVOrder Issued

    Order Issued Property Standards: Required guard does not prevent the passage of a sphere having a diameter more than 100 millimetres.; Required handrails on stairs or ramps are less than 865mm or more than 965mm high; The location and size of openings present a hazard as they are designed with members or attachments between 140 millimetres and 900 millimetres above the level

    Aug 24, 2026 · 2 GRANDSTAND PL
  • By-law investigation26 224649 PRS 00 IROrder Issued

    Property Standards

    Aug 24, 2026 · 2 GRANDSTAND PL
  • By-law investigation26 221910 PRS 00 IVClosed

    Order Issued Property Standards: The plumbing system is not kept in good working order.Namely: Bathroom sink has issues draining and may be clogged.

    Aug 17, 2026 · 2 GRANDSTAND PL
  • By-law investigation26 220813 PRS 00 IRClosed

    Property Standards

    Aug 17, 2026 · 2 GRANDSTAND PL
  • By-law investigation26 170808 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 2 GRANDSTAND PL
  • By-law investigation26 170807 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 2 GRANDSTAND PL
Show 7 older records
  • By-law investigation26 110768 PRS 00 IRClosed

    Property Standards

    Jan 29, 2026 · 2 GRANDSTAND PL
  • By-law investigation25 241492 PRS 00 IRClosed

    Property Standards

    Oct 17, 2025 · 2 GRANDSTAND PL
  • By-law investigation25 221867 PRS 00 IRClosed

    Property Standards

    Sep 8, 2025 · 2 GRANDSTAND PL
  • By-law investigation25 196240 PRS 00 IRClosed

    Property Standards

    Jul 18, 2025 · 2 GRANDSTAND PL
  • By-law investigation25 124355 PRS 00 IRClosed

    Property Standards

    Mar 4, 2025 · 2 GRANDSTAND PL
  • Building permit20 193210Closed

    BProposed balcony localized concrete repairs and guardrails replacement

    Oct 6, 2020 · 2 GRANDSTAND PL
  • Building permit15 261990Closed

    Backflow prevention device

    Dec 21, 2015 · 2 GRANDSTAND PL

Lot facts

Area
3,886 m²
Frontage
71.1 mestimated, irregular lot
Depth
106.8 mestimated, irregular lot
Street
Grandstand Pl
Corner lot
No
Public lane
None
House footprint
1,075 m²roof up to 23.3 m
Back yard
47.1 mhouse to rear lot line
Side yards
10.6 m and 13.2 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
28 m
Max lot coverage
30%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Thorncliffe Park. The lot is inside the Thorncliffe Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 767). Source
  • Minimum frontage 30 m. Frontage is about 71.1 m (estimated, irregular lot): meets the zone minimum. Source
  • Minimum lot area 930 m². Lot area is 3,886 m²: meets the minimum. Source
  • Zone RA (f30.0; a930; d1.25) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source

Around this lot

Minor variances approved
100%4 of 4 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To demolish the existing two-storey, 72-space parking lot and replace it with a 38-space surface parking lot.

    54 THORNCLIFFE PARK DR · Nov 8, 2017 · 363 m away
  • Minor varianceApproved

    convert storage space in apt building to new 3 bedroom apt unit

    26 THORNCLIFFE PARK DR · Jun 22, 2017 · 100 m away

Latest activity nearby

  • Zoning review

    Closed

    2 MILEPOST PL · Jul 27, 2026 · 214 m away
  • Building permit

    Proposed interior alteations to existing Community Services- no change in use or occupancy

    18 THORNCLIFFE PARK DR · Jul 20, 2026 · 63 m away
  • Development application

    Zoning By-law Amendment for three residential buildings containing 1,300 new and rental replacement dwelling units.

    2 MILEPOST PL · Jul 6, 2026 · 230 m away · City file
  • Building permit

    Proposal to replace Fire Alarm Panel

    15 THORNCLIFFE PARK DR · Apr 17, 2026 · 151 m away
  • Building permit

    Proposal for removal for fire damage of compressed wood fibre boards, sandwiched in the 25mm interstitial space between the perimeter shear walls of 11 Thorncliffe Park Drive and 21 Overlea. See also 26 126986 BLD 00 BA

    11 THORNCLIFFE PARK DR · Mar 13, 2026 · 213 m away
  • Building permit

    Proposal for removal for fire damage of compressed wood fibre boards, sandwiched in the 25mm interstitial space between the perimeter shear walls of 11 Thorncliffe Park Drive and 21 Overlea. See also 26 126976 BLD 00 BA

    21 OVERLEA BLVD · Mar 12, 2026 · 258 m away
  • Building permit

    1 Wall Sign

    45 OVERLEA BLVD · Jan 26, 2026 · 168 m away
  • Building permit

    Replace Existing Fire Control Panel and Annunciator Panel with new Fire Control Panel and new Annunciator Panel.

    26 THORNCLIFFE PARK DR · Jan 23, 2026 · 100 m away
  • Building permit

    Proposal to replace defective 3" DCVA Backflow Preventer located in north east sprinkler room.

    45 OVERLEA BLVD · Jan 12, 2026 · 168 m away
  • Building permit

    Revision 01 - shift in elevator locationProposed elevator in existing 2-storey church building, from the basement level to the second floor.

    30 THORNCLIFFE PARK DR · Jan 5, 2026 · 161 m away

Neighbourhood: Thorncliffe Park

About the area around the lot, not the lot itself.

Nearest station
Sunnybrook Park Station24 min walk
Nearest TTC stop
Thorncliffe Park Dr at Milepost Pl2 min walk
Nearest cycling route
Thorncliffe Park DrCycle Track, 1 min walk
Nearest traffic count
11,680 vehicles in 8 hOverlea Blvd to Thorncliffe Park Dr, 300 m away, Jul 17, 2019
Serious collisions within 500 m
42021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 1 with cyclists
Parks
R.V. Burgess Park1 min walk
Leaside Park2 min walk
E.T. Seton Park3 min walk

Schools within 1 km

  • THORNCLIFFE PARK PUBLIC SCHOOL English Public 4 min walk
  • FRASER MUSTARD EARLY LEARNING ACADEMY English Public 5 min walk
  • OVERLEA LINC English Public 7 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureThorncliffe ParkMedian neighbourhood
Median household income (2020)$67,000$84,500
Households that own their home14%54%
Population (2021)20,40016,813
Homes built in 1960 or before21%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleThorncliffe ParkCity median
Assault638636.3
Robbery83.969.5
Auto theft377.7192.6
Theft over $5,00054.646.1
Break and enter104.9172.8
Theft from vehicles226.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.