HousePrecheckCheck an address

2 Glen Elm AveToronto · zoning, lot size and permit records

Commercial residential · CR 2.5 (c1.0; r1.5) SS2 (x2413)25.0 × 45.0 m1,063 m²on Yonge Stcorner, also on Glen Elm Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 6 storeys, 49 rental units, built 1934More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 18 115185 (Proposal for interior alterations within recycling and garbage discharge room, work roo..., 2018, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 7 development applications open within 300 m, up to 43 storeysNew buildings may go up around here in the next years. More change nearby than at 94% of Toronto houses.
  • City upkeep score: 94 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: St ClairThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
25.0 m frontage45.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2018

    Needs a closer look

    Still open in the City's records: 18 115185 (Proposal for interior alterations within recycling and garbage discharge room, work roo..., 2018, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards): 26 259027 PRS 00 IR (Property Standards, 2026); 26 116430 PRS 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 7 development applications open within 300 m

    Good to know

    7 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 43 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 94 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (6 storeys, 49 units, built 1934).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • By-law investigation26 259027 PRS 00 IRClosed

    Property Standards

    Oct 22, 2026 · 2 GLEN ELM AVE
  • Building permit24 186607Closed

    Revision 1: revision for the north foundation wall at 2 Glen Elm Avenue.Proposed underpinning for the north side of the wall of 2 GLEN ELM AVE. (Party Wall Admin Permits - Related to underpinning work at 1639 Yonge Street 24 125008 BLD 00 BA.)

    Jun 15, 2026 · 2 GLEN ELM AVE
  • By-law investigation26 116430 PRS 00 IRClosed

    Property Standards

    Feb 11, 2026 · 2 GLEN ELM AVE
  • Building permit24 250293Closed

    Proposal for backflow device.

    Dec 19, 2024 · 2 GLEN ELM AVE
  • Building permit18 115185Inspection

    Proposal for interior alterations within recycling and garbage discharge room, work room, and storage rooms to replace combustible construction with non-combustible fire rated construction as required Areas of work include recycling and garbage discharge room, work room, and storage rooms.

    May 10, 2018 · 2 GLEN ELM AVE
  • Building permit17 274117Cancelled

    Proposed interior alterations to existing apartment building in the basement.

    Dec 11, 2017 · 2 GLEN ELM AVE
  • Building permit16 169957Closed

    fire alarm audibility upgrade -add new fire alarm mini horn to each unit

    Jul 12, 2016 · 2 GLEN ELM AVE
  • Zoning review05 207291 ZPRClosed
    Dec 2, 2005 · 2 GLEN ELM AVE

Check before you build

  • Site-specific exception 900.11.10(2413)

    Needs a closer look

    2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2413)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(2) 262 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

1 part for other addresses
  • C On 1639 Yonge St., City of Toronto by-law 394-06.
By-law 569-2013, Chapter 900

Lot facts

Area
1,063 m²
Frontage
25 m
Depth
45 m
Street
Yonge St
Corner lot
Yes, also on Glen Elm Ave45 m along it
Public lane
None
House footprint
697 m²roof up to 25 m
Back yard
3 mhouse to rear lot line
Side yards
0.4 m and 4.3 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
14 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: St Clair. The lot is inside the St Clair Major Transit Station Area approved by the Province (Site and Area Specific Policy 721). Source
  • Yonge-St. Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 2.5 (c1.0; r1.5) SS2 (x2413) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: maple, manitoba (59 cm), linden, littleleaf (45 cm), maple, freeman autumn blaze (4 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
93%38 of 41 decisions
Garden suite permits
2
Laneway suite permits
0
Multiplex permits
6
Development applications
9

Within 300 m, last 10 years. 8 suite and multiplex permits: more than at 70% of Toronto houses (median 3). 41 variance decisions: more than at 76% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To construct a new three-storey non-residential building (including a mezzanine level), with various uses such as: adaptable spaces for community-oriented and commercial uses, a convertible auditorium space, an atrium gathering area, workshops, studios, meeting rooms, café, entertainment places of assembly, eating/take-out establishment(s), and recreation. There will be greenroof areas, an outdoor rooftop terrace, and the rooftop mechanical penthouse will be enclosed (above the second storey).

    1560 YONGE ST · May 27, 2026 · 207 m away
  • Minor varianceApproved

    To permit additional commercial use types on the ground floor of the 44-storey mixed-use building (currently under construction).

    1 DELISLE AVE · Feb 18, 2026 · 286 m away
  • Minor varianceApproved

    To permit a commercial school use (fitness studio occupying Units 106 and 109) on the first storey of the existing 21-storey non-residential building.

    2 ST CLAIR AVE W · Jan 28, 2026 · 365 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1032-2022) for a mixed-use development comprised of a 13-storey building (Building 1) and three towers (Tower 1 with 44-storeys, Tower 2 with 38-storeys and Tower 3 with 25-storeys) connected by a shared podium on the lot by reallocating a proportion of residential density from Building 1 to Tower 1, increasing the building height of Tower 1 from 44-storeys (144 m) to 46-storeys (161.2 m), decreasing the height of Building 1 from 13-storeys (53.5 m) to four-storeys (25 m), increasing the height and projections of the mechanical penthouse and architectural crowning elements associated with Tower 1, modifying setbacks and separation distance by relocating Tower 2 (north toward Building 1) and by altering the podium element below Tower 3.

    1 HEATH ST E · Dec 10, 2025 · 180 m away
  • Minor varianceApproved

    To redescribe the lands as a result of the conveyance of the rear portion of the lot for parkland dedication.

    40 ST CLAIR AVE W · Oct 29, 2025 · 385 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.

    1 DELISLE AVE · Aug 10, 2027 · 286 m away
  • Zoning review

    Closed

    1560 YONGE ST · Oct 19, 2026 · 207 m away
  • Zoning review

    Closed

    1590 YONGE ST · Oct 6, 2026 · 109 m away
  • Building permit

    Reivison Proposed construction of a second-storey addition over the existing garage.

    23 LONSDALE RD · Sep 29, 2026 · 207 m away
  • Development application

    Proposed four storey community centre with a gross floor area of 6,166sqm.

    1566 YONGE ST · Sep 25, 2026 · 181 m away · City file
  • Building permit

    Cap existing sanitary building drain from 47 Heath St E. Connect new sanitary building drain connection to newly provided city sewer tie-in.

    47 HEATH ST E · Sep 16, 2026 · 234 m away
  • Minor varianceApproved

    To permit additional uses within the existing two-storey non-residential detached building.

    8 LAWTON BLVD · Sep 9, 2026 · 97 m away
  • Zoning review

    Closed

    1570 YONGE ST · Aug 31, 2026 · 163 m away
  • Building permit

    Install Backwater valve on sanitary line

    3 BAKER AVE · Aug 17, 2026 · 277 m away
  • Building permit

    Plumbing - Converting existing classroom into maker space.

    1639 YONGE ST · Aug 7, 2026 · 27 m away

Neighbourhood: Rosedale-Moore Park

About the area around the lot, not the lot itself.

Nearest station
St. Clair Station7 min walk
Nearest TTC stop
Yonge St at Heath St West2 min walk
Nearest cycling route
Yonge StCycle Track, 1 min walk
Nearest traffic count
9,612 vehicles in 8 hYonge St / Glen Elm Ave / Lawton Parkette Trl, 40 m away, Mar 3, 2022
Serious collisions within 500 m
52021–2026, killed or seriously injured: 2 fatal, 1 with pedestrians, 1 with cyclists
Parks
Yorkminster Park Baptist Church Park1 min walk
Lawton Parkette1 min walk
David A. Balfour Park6 min walk

Schools within 1 km

  • THE YORK SCHOOL - JR CAMPUS Private 1 min walk
  • DEER PARK JR & SR PUBLIC SCHOOL English Public 5 min walk
  • THE LINDEN SCHOOL Private 9 min walk
  • UPPER CANADA COLLEGE SCHOOL Private 10 min walk
  • UPPER CANADA PREP SCHOOL Private 13 min walk
  • THE YORK SCHOOL - MDL AND SR CAMPUS Private 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRosedale-Moore ParkMedian neighbourhood
Median household income (2020)$122,000$84,500
Households that own their home58%54%
Population (2021)20,08016,813
Homes built in 1960 or before46%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRosedale-Moore ParkCity median
Assault1080.4636.3
Robbery86.869.5
Auto theft199.6192.6
Theft over $5,00065.146.1
Break and enter455.6172.8
Theft from vehicles182.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.