HousePrecheckCheck an address

2 Flaming RosewayToronto · zoning, lot size and permit records

Also 100 Flaming Roseway, 102 Flaming Roseway, 104 Flaming Roseway, 106 Flaming Roseway, 108 Flaming Roseway and 58 more

Residential townhouse · RT (au220.0)156.4 × 113.4 m17,696 m²on Flaming Roseway

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 1.8 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 09 183478 (Remove wall between kitchen and living room, 2009, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • Major Transit Station Area: BayviewThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
156.4 m frontage113.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2009

    Needs a closer look

    Still open in the City's records: 09 183478 (Remove wall between kitchen and living room, 2009, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit25 228078Closed

    Proposal for interior alterations.

    Sep 23, 2025 · 108 FLAMING ROSEWAY
  • By-law investigation25 169134 GRA 00 IRClosed

    Graffiti

    May 31, 2025 · 90 FLAMING ROSEWAY
  • Building permit25 161860Closed

    Proposed basemnet interior renovations and bathroom addition to a single family townhome.

    May 26, 2025 · 27 FLAMING ROSEWAY
  • Building permit17 139830Closed

    interior alterations - remove non load bearing partition wall, relocate sink, add new opening in kitchen on main floor, renovate 2 bathrooms on second floor

    Apr 13, 2017 · 81 FLAMING ROSEWAY
  • Building permit16 257447Closed

    Interior alterations to create a new washroom in the basement

    Nov 30, 2016 · 46 FLAMING ROSEWAY
  • Building permit15 159184Closed

    INTERIOR ALTERATIONS TO UNIT, REMOVE WALL AND REPLACE W/BEAM. NOT AFFECTING COMMON AREAS

    Jun 3, 2015 · 8 FLAMING ROSEWAY
  • Building permit14 164244Closed

    Installation of a 3 piece bathroom in the basement - not to be used for a second dwelling unit

    May 29, 2014 · 60 FLAMING ROSEWAY
  • Building permit09 183478Inspection

    Remove wall between kitchen and living room

    Oct 29, 2009 · 100 FLAMING ROSEWAY
Show 2 older records
  • Building permit04 201155Closed

    remove partition in kitchen on 1st floor, addition of shower area on 2nd floor.

    Dec 16, 2004 · 6 FLAMING ROSEWAY
  • Building permit02 148501Closed

    PROPOSED NEW INTERTIOR ALTERTION TO SINGLE FAMILY DWELLING

    Jun 20, 2002 · 110 FLAMING ROSEWAY

Lot facts

Area
17,696 m²
Frontage
156.4 m
Depth
113.4 m
Street
Flaming Roseway
Corner lot
No
Public lane
None
Max height
10.5 m
Max lot coverage
25%
  • Major Transit Station Area: Bayview. The lot is inside the Bayview Major Transit Station Area approved by the Province (Site and Area Specific Policy 728). Source
  • Sheppard East Subway Corridor Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone RT (au220.0) (Residential Townhouse). Chapter 10, section 10.60 of the by-law. Source
  • 20 City trees in front of this lot. The City's street tree inventory lists 20 trees at this address: apple, sargents (57 cm), apple, sargents (34 cm), apple, sargents (34 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%29 of 29 decisions
Garden suite permits
5
Laneway suite permits
0
Multiplex permits
7
Development applications
0

Within 300 m, last 10 years. 12 suite and multiplex permits: more than at 78% of Toronto houses (median 3). 29 variance decisions: more than at 62% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit the change of use of the existing legal non-conforming automotive repair shop into a retail store (grocery) and to alter the existing one-storey building by constructing a one-storey front (north) addition.

    219 SHEPPARD AVE E · Aug 28, 2025 · 257 m away

Latest activity nearby

  • Minor variancePending

    To construct a three-storey apartment building containing 8 dwelling units.

    227 GLENDORA AVE · Nov 26, 2026 · 253 m away
  • Zoning review

    Closed

    223-251 SHEPPARD AVE E · Oct 27, 2026 · 206 m away
  • Building permitgarden suite

    REV 01: Change the roof profile of the Garden SuiteConstruction of new 60m2, 2 storey garden suite.

    227 GLENDORA AVE · Oct 27, 2026 · 253 m away
  • Zoning review

    Closed

    317 SHEPPARD AVE E · Oct 22, 2026 · 219 m away
  • Building permitsecondary suite

    Proposed interior alteration to create a second suite.

    19 IRVINGTON CRES · Sep 24, 2026 · 244 m away
  • Building permitsecondary suite

    Proposal for a secondary suite, basement walkout w/canopy above.

    30 VONDA AVE · Sep 15, 2026 · 261 m away
  • Building permit

    Walk-out legal basement

    30 VONDA AVE · Sep 3, 2026 · 261 m away
  • Building permitsecondary suite

    Proposed interior alterations for second suite.

    19 IRVINGTON CRES · Sep 1, 2026 · 244 m away
  • Building permitdemolition

    Proposal to demolish existing dwelling.

    342 MAPLEHURST AVE · Aug 26, 2026 · 246 m away
  • Building permitgarden suite, multiplex

    To demolish the existing dwelling at 342 Maplehurst Ave., sever the lot, and construct a new 3-storey fourplex with a garden suite on each newly created lot.

    342 MAPLEHURST AVE · Aug 25, 2026 · 246 m away

Neighbourhood: Avondale

About the area around the lot, not the lot itself.

Nearest station
Bayview Station9 min walk
Nearest TTC stop
Sheppard Ave East at Wilfred Ave2 min walk
Nearest cycling route
Sheppard Ave ECycle Track, 2 min walk
Nearest traffic count
26,532 vehicles in 14 hSheppard Ave E / Wilfred Ave, 130 m away, Nov 15, 2025
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Sheppard East Park3 min walk
Maplehurst Park6 min walk
Glendora Park7 min walk

Schools within 1 km

  • CORNELL INTERNATIONAL ACADEMY Private 9 min walk
  • ST GABRIEL CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • ACADEMY OF EXCELLENCE SECONDARY SCHOOL Private 9 min walk
  • NEWTON INTERNATIONAL COLLEGE SCHOOL Private 9 min walk
  • CENTRAL MONTESSORI SCHOOL - WILLOWDALE Private 10 min walk
  • TORONTO CENTRAL ACADEMY SECONDARY SCHOOL Private 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAvondaleMedian neighbourhood
Median household income (2020)$84,000$84,500
Households that own their home58%54%
Population (2021)13,79016,813
Homes built in 1960 or before6%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAvondaleCity median
Assault508.3636.3
Robbery30.369.5
Auto theft66.6192.6
Theft over $5,00018.246.1
Break and enter108.9172.8
Theft from vehicles108.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.