HousePrecheckCheck an address

2 Civic Centre CrtToronto · zoning, lot size and permit records

Commercial residential · CR 0.40 (c0.40; r0.0) SS3 (x900)141.3 × 86.4 m11,000 m²on Civic Centre Crt

Not a home

Former Hydro Property

The City of Toronto's real estate inventory lists Former Hydro Property here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A public buildingVisitors and traffic in its open hours; usually quiet at night.
  • Permits or applications open on this parcelRecent records on this lot: 25 182903 (PRODUCTION TESTING OF PORTAL, 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 14 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
N50 m
141.3 m frontage86.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 4 building permits open, the oldest since 2011

    Needs a closer look

    Still open in the City's records: 24 122331 (Column and wall concrete repairs in parking garage. Podium deck slab concrete and water..., 2024, status Permit Issued); 19 157664 (Proposal for the removal of concrete topping and asphalt and installation of new waterp..., 2019, status Inspection); 15 251146 (Proposed interior alteration on ground floor of existing Toronto Building Department of..., 2015, status Revocation Pending); and 1 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 182903 (PRODUCTION TESTING OF PORTAL, 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • Records mention garden suite

    Good to know

    Permits or Committee of Adjustment files on this lot mention garden suite: 25 182903 (PRODUCTION TESTING OF PORTAL, 2025).

    What it means. Check that the unit you would buy matches what was approved, and that its permit was closed after final inspection.

    How to confirm. Ask the seller for the permit and final inspection. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 14 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

21 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review26 235259 000Cancelled
    Sep 10, 2026 · 2 CIVIC CENTRE CRT
  • Building permit26 186577Cancelled

    Test - New House

    Jun 17, 2026 · 2 CIVIC CENTRE CRT
  • Building permit25 182903Application On Holdgarden suite

    PRODUCTION TESTING OF PORTAL

    Jun 24, 2025 · 2 CIVIC CENTRE CRT
  • Building permit24 122331Permit Issued

    Column and wall concrete repairs in parking garage. Podium deck slab concrete and waterproofing repairs. New asphalt pavement.

    Apr 12, 2024 · 2 CIVIC CENTRE CRT
  • Zoning review22 118215 ZZCCancelled
    Mar 1, 2022 · 2 CIVIC CENTRE CRT
  • Building permit19 157664Inspection

    Proposal for the removal of concrete topping and asphalt and installation of new waterproofing membane and underground parking garage work.

    Jun 19, 2019 · 2 CIVIC CENTRE CRT
  • Building permit16 137186Closed

    Permit to install automatic door operators.

    Apr 11, 2016 · 2 CIVIC CENTRE CRT
  • Building permit16 112482Closed

    FIRE ALARM UPGRADE / REPLACEMENT

    Mar 7, 2016 · 2 CIVIC CENTRE CRT
Show 13 older records
  • Building permit15 251146Revocation Pending

    Proposed interior alteration on ground floor of existing Toronto Building Department office.

    Nov 18, 2015 · 2 CIVIC CENTRE CRT
  • Building permit15 124689Closed

    To erect and display one non-illuminated ground sign and two non-illuminated wall signs. A ground sign is to have sign face dimensions of 0.921 metre in vertical length and 2.372 metres in horizontal width, 1.581 metre in height from the ground, located along the southerly property frontage of the premises. Two wall signs are to be 0.55 metre in vertical length by 1.524 metre in horizontal width, at a height of 2.37 metres on the easterly and westerly facing first storey building walls, in conjunction with a community centre located on the premises. **ETOBICOKE CIVIC CENTRE**

    Apr 29, 2015 · 2 CIVIC CENTRE CRT
  • Building permit15 114636Closed

    Permit to install (1) new sink with interconnected "Liberty" Sanitary Pump on second florr of existing office building.

    Feb 18, 2015 · 2 CIVIC CENTRE CRT
  • Building permit11 288627Permit Issued

    interior alterations to handrails and stairguard

    Oct 7, 2011 · 2 CIVIC CENTRE CRT
  • Building permit08 164596Closed

    installation of magnetic lock devices located basement level

    Jun 4, 2008 · 2 CIVIC CENTRE CRT
  • Building permit07 263347Closed

    installation of maglocks 2-in basement garage and 1 second floor Revised to 3 in the basement and 2 on second floor. (E.Y.)

    Sep 25, 2007 · 2 CIVIC CENTRE CRT
  • Building permit06 170926Closed

    Interior alterations on the main floor of the building for a new training room.

    Sep 29, 2006 · 2 CIVIC CENTRE CRT
  • Building permit06 171941Closed

    Replacement of garage ventilation system

    Sep 8, 2006 · 2 CIVIC CENTRE CRT
  • Building permit06 171929Closed

    Chiller, cooling tower, and pump replacement

    Sep 8, 2006 · 2 CIVIC CENTRE CRT
  • Building permit06 112389Closed

    Concrete repairs to underground garage, only one floor.

    Mar 2, 2006 · 2 CIVIC CENTRE CRT
  • Building permit06 110621Closed

    Minor HVAC modifications to the 4th floor of an existing office building

    Feb 21, 2006 · 2 CIVIC CENTRE CRT
  • Building permit05 136109Closed

    interior alters to existsing boardroom on main floor to Municipal Employees Credit Union

    Jul 15, 2005 · 2 CIVIC CENTRE CRT
  • Building permit03 103384Closed

    Interior alterations

    Jan 28, 2003 · 2 CIVIC CENTRE CRT

Check before you build

  • Site-specific exception 900.11.10(900)

    Needs a closer look

    1 site-specific rule applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(900)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Despite regulation 40.5.1.10 (3), the permitted maximum floor space index of all land uses on the lot , including all non-residential uses, may be 0.7 if, a minimum of 30% of the area of the lot is used for landscaping .

By-law 569-2013, Chapter 900

Lot facts

Area
11,000 m²
Frontage
141.3 m
Depth
86.4 m
Street
Civic Centre Crt
Corner lot
No
Public lane
None
House footprint
1,234 m²roof up to 18.5 m
Back yard
23.7 mhouse to rear lot line
Side yards
24.5 m and 90.7 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
11 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone CR 0.40 (c0.40; r0.0) SS3 (x900) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
0
Development applications
4

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To reduce the number of lawful parking spaces in order to accomodate electric vehicle charging stations with a battery storage enclosure.

    380 THE EAST MALL · May 14, 2026 · 375 m away
  • Minor varianceApproved

    To construct a maximum of four enclosed temporary structures from April 1st to July 31st in conjunction with the continued operation of the outdoor garden centre.

    380 THE EAST MALL · Feb 11, 2016 · 375 m away
  • Minor varianceApproved

    To construct two new commercial buildings on the north side of the subject lands.

    380 THE EAST MALL · Nov 19, 2015 · 375 m away

Latest activity nearby

  • Consent (lot split)Approved

    To obtain consent to sever the lot into two lots and to create various easements/ right-of-ways.

    375-385 THE WEST MALL · Nov 19, 2026 · 192 m away
  • Building permit

    Proposal to undertake Exterior Renovations (AODA), including exterior parking improvements, line painting, stair modifications (guards, handrails, and tactile indicators), installation of permeable pavers, and curb upgrades to enhance accessibility and site functionality in compliance with AODA requirements.

    400 THE WEST MALL · Nov 2, 2026 · 271 m away
  • Zoning review

    Cancelled

    2 CIVIC CENTRE CRT · Sep 10, 2026 · 41 m away
  • Building permit

    Demolition and recasting of entrance stairs and replacement of roof assembly above the main entrance podium structural slab.

    1 CIVIC CENTRE CRT · Jul 8, 2026 · 92 m away
  • Building permit

    Test - New House

    2 CIVIC CENTRE CRT · Jun 17, 2026 · 41 m away
  • Building permit

    Proposal for alterations to exterior parking, line painting, stairs, permeable pavers and curbs

    400 THE WEST MALL · Mar 26, 2026 · 271 m away
  • Building permit

    Proposed interior alterations to long term care facility. Scope of work includes ground floor entry foyer, adding a new ancillary reception desk area, new millwork, new door & door hardwares, new interior screen partitions, new ACT and GWB ceilings, new and modified security and communications, new lighting, new electric baseboard heaters, new and modified plumbing (radiant ceiling panels) and HVAC.

    400 THE WEST MALL · Sep 11, 2025 · 271 m away
  • Zoning review

    Closed

    385 THE WEST MALL · Jul 21, 2025 · 159 m away
  • Building permit

    Proposal for slab replacement.

    361 THE WEST MALL · Jul 7, 2025 · 258 m away
  • Building permitgarden suite

    PRODUCTION TESTING OF PORTAL

    2 CIVIC CENTRE CRT · Jun 24, 2025 · 41 m away

Neighbourhood: Etobicoke West Mall

About the area around the lot, not the lot itself.

Nearest station
Kipling Station39 min walk
Nearest TTC stop
The West Mall at Civic Centre Crt3 min walk
Nearest cycling route
Renforth DrBike Lane, 10 min walk
Nearest traffic count
5,046 vehicles in 8 hThe West Mall / Civic Centre Crt, 180 m away, Nov 4, 2020
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 1 with cyclists
Parks
Dennis Flynn Park3 min walk
Broadacres Park6 min walk
East Mall Park8 min walk

Schools within 1 km

  • TORONTO DISTRICT SCHOOL BOARD - WEST EDUCATION OFFICE English Public 1 min walk
  • EATONVILLE JR SCHOOL English Public 10 min walk
  • BURNHAMTHORPE COLLEGIATE & ADULT LEARNING CENTRE English Public 11 min walk
  • BLOORDALE MDL SCHOOL English Public 13 min walk
  • BROADACRES JR SCHOOL English Public 14 min walk
  • WEST GLEN JR SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEtobicoke West MallMedian neighbourhood
Median household income (2020)$84,000$84,500
Households that own their home56%54%
Population (2021)11,86516,813
Homes built in 1960 or before23%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEtobicoke West MallCity median
Assault468.6636.3
Robbery27.669.5
Auto theft199.8192.6
Theft over $5,00013.846.1
Break and enter110.3172.8
Theft from vehicles179.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.