HousePrecheckCheck an address

2 Cheryl ShepwayToronto · zoning, lot size and permit records

Also 10 Cheryl Shepway, 10 Tyson Shepway, 11 Cheryl Shepway, 11 Tyson Shepway, 12 Cheryl Shepway and 100 more

Residential townhouse · RT (x251)≈ 164.6 × 188.2 m26,266 m²on Maris Shepwaycorner, also on Cheryl Shepway

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 2.6 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 22 161959 (Proposal for interior alterations to remove a load bearing wall on the ground floor of..., 2022, status Permit Issued); 16 197404 (Proposal for interior alterations on the ground floor of the existing dwelling, 2016, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • Major Transit Station Area: LeslieThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 164.6 m frontage≈ 188.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (14% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (9% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • 2 building permits open, the oldest since 2016

    Needs a closer look

    Still open in the City's records: 22 161959 (Proposal for interior alterations to remove a load bearing wall on the ground floor of..., 2022, status Permit Issued); 16 197404 (Proposal for interior alterations on the ground floor of the existing dwelling, 2016, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (30% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • Building permit22 161959Permit Issued

    Proposal for interior alterations to remove a load bearing wall on the ground floor of an existing SFD-townhouse.

    Jun 23, 2022 · 49 CHERYL SHEPWAY
  • Building permit21 140265Closed

    Remove and replace existing second floor wood balconies and guards, at residential townhouse units

    May 20, 2021 · 1 CHERYL SHEPWAY
  • Building permit21 131107Closed

    Proposed interior alterations to an existing washroom in the basement

    Mar 29, 2021 · 4 TYSON SHEPWAY
  • Building permit21 110442Closed

    Townhouse dwelling for single-family use only:In basement washroom: add a shower stall and walls; relocate existing toilet, wash basin, and door.In basement hallway: relocate laundry tub to beside existing hot water tank; install backwater valve.Hot and cold water supplies and drain pipes to be re-routed/added as needed for the above.

    Feb 8, 2021 · 83 CHERYL SHEPWAY
  • Building permit16 203894Closed

    Proposal to install back water valve in main line.

    Aug 12, 2016 · 82 CHERYL SHEPWAY
  • Building permit16 197404Inspection

    Proposal for interior alterations on the ground floor of the existing dwelling.

    Aug 4, 2016 · 82 CHERYL SHEPWAY
  • Building permit09 164250Closed

    Remove non-load bearing partition between kitchen and living room

    Aug 31, 2009 · 23 TYSON SHEPWAY
  • Building permit95 251199Closed - Dormant

    REPLACE FURNACE

    Dec 25, 1995 · 10 TYSON SHEPWAY

Check before you build

  • Site-specific exception 900.5.10(251)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.5.10(251)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Former City of North York by-law 23585.

By-law 569-2013, Chapter 900

Lot facts

Area
26,266 m²
Frontage
164.6 mestimated, irregular lot
Depth
188.2 mestimated, irregular lot
Street
Maris Shepway
Corner lot
Yes, also on Cheryl Shepway188.2 m along it
Public lane
None
Max height
10.5 m
Max lot coverage
25%
  • Major Transit Station Area: Leslie. The lot is inside the Leslie Major Transit Station Area approved by the Province (Site and Area Specific Policy 729). Source
  • Sheppard East Subway Corridor Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone RT (x251) (Residential Townhouse). Chapter 10, section 10.60 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: oak, red (8 cm), oak, red (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Not Started

    21 MAROWYNE DR · Nov 23, 2026 · 273 m away
  • Zoning review

    Not Started

    21 MAROWYNE DR · Nov 23, 2026 · 273 m away
  • Zoning review

    Cancelled

    47 LAURIE SHEPWAY · Mar 20, 2025 · 199 m away
  • Building permit

    Proposed interior alterations for dental clinic in an existing unit. No change of any exisitng doors/ windows. All exterior walls to remain as is.

    1333 SHEPPARD AVE E · Jan 24, 2025 · 177 m away
  • Building permitnew building, new house

    Revision - relocate wet bar in basement. Remove family room and add new bedroom and bathroom. Remove one window.

    9 MAROWYNE DR · Dec 10, 2024 · 251 m away
  • Building permitnew building

    Construct a new 4 storey underground pump station with a new 1 storey above ground control station.

    1240 SHEPPARD AVE E · Oct 30, 2024 · 215 m away
  • Building permitdemolition

    Proposed demolition of an existing public washroom.

    1236 SHEPPARD AVE E · Oct 18, 2024 · 266 m away
  • Building permit

    Proposal for modification if existing devices with no wiring modifications

    1333 SHEPPARD AVE E · Sep 27, 2024 · 177 m away
  • Building permit

    Part Permit - Construct a new 4 storey underground pump station with a new 1 storey above ground control station.

    1236 SHEPPARD AVE E · Jun 17, 2024 · 266 m away
  • Building permit

    Proposed installation of PVsolar pannels on the roof of an existing single family detached dwelling.

    1 A MAROWYNE DR · Oct 5, 2023 · 258 m away

Neighbourhood: Don Valley Village

About the area around the lot, not the lot itself.

Nearest station
Leslie Station6 min walk
Nearest TTC stop
Leslie St at Sheppard Ave East North Side2 min walk
Nearest cycling route
Betty Sutherland TrlMulti-Use Trail, 2 min walk
Nearest traffic count
46,523 vehicles in 14 hSheppard Ave E / Leslie St / Don River E Branch, 150 m away, Nov 15, 2025
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 1 with cyclists
Parks
East Don Parkland2 min walk
Clovercrest Parkette3 min walk
Dallington Park6 min walk

Schools within 1 km

  • BAY SCHOOL OF CANADA Private 8 min walk
  • DALLINGTON PUBLIC SCHOOL English Public 13 min walk
  • SHAUGHNESSY PUBLIC SCHOOL English Public 15 min walk
  • ST TIMOTHY CATHOLIC ELEMENTARY SCHOOL English Separate 16 min walk
  • LESCON PUBLIC SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDon Valley VillageMedian neighbourhood
Median household income (2020)$83,000$84,500
Households that own their home51%54%
Population (2021)26,77516,813
Homes built in 1960 or before11%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDon Valley VillageCity median
Assault563.3636.3
Robbery10369.5
Auto theft206192.6
Theft over $5,00045.146.1
Break and enter93.3172.8
Theft from vehicles157.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.