Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (100% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (100% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 658Environmentally Significant Area: Glendon Forest
Needs a closer lookThe lot touches an Environmentally Significant Area shown on Official Plan Map 12.
What it means. Development in or next to the area needs an impact study and may be limited.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 12Building permit open since 2022
Needs a closer lookStill open in the City's records: 22 203069 (add fire supression sprinklers to lobby, 2022, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (93% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 9Work or applications in progress
Good to knowRecent records on this lot: 26 255729 (Domestic Hot Water Riser C7 Replacement, 2026); 26 166612 (Proposed heat pump replacement and duct work adjustment, 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
9 records on file: more than at 99% of Toronto houses (median 0).
- Building permit26 255729Permit Issued
Domestic Hot Water Riser C7 Replacement
Nov 24, 2026 · 2 CHEDINGTON PL - Building permit26 166612Under Review
Proposed heat pump replacement and duct work adjustment
May 25, 2026 · 2 CHEDINGTON PL - Building permit22 203069Inspection
add fire supression sprinklers to lobby
Oct 19, 2022 · 2 CHEDINGTON PL - Building permit21 186986Closed
proposal to change location of work in existing appartment
Dec 6, 2021 · 2 CHEDINGTON PL - Building permit21 217296Closed
Replacement of fire alarm control panel, all wiring and zoning to remain the same
Nov 5, 2021 · 2 CHEDINGTON PL - Building permit14 250791Closed
Intsallation of one premise isolation back flow preventer.
Nov 20, 2014 · 2 CHEDINGTON PL - Building permit10 266110Closed
Int. Alt. to penthouse unit 8b/9b
Oct 15, 2010 · 2 CHEDINGTON PL - Building permit97 093602Closed
REV:B9600704
Jul 15, 1997 · 2 CHEDINGTON PL
Show 1 older records
- Building permit96 088274Closed
9 STRYS
Nov 13, 1996 · 2 CHEDINGTON PL
Check before you build
Site-specific exception 900.7.10(400)
Needs a closer look1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Former City of North York by-law 30509.
Lot facts
- Area
- 4,813 m²
- Frontage
- 108.8 mestimated, irregular lot
- Depth
- 74.3 mestimated, irregular lot
- Street
- Chedington Pl
- Corner lot
- No
- Public lane
- None
- Max height
- —
- Max lot coverage
- 35%
Around this lot
- Minor variances approved
- 100%8 of 8 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 2
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 8 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
Domestic Hot Water Riser C7 Replacement
2 CHEDINGTON PL · Nov 24, 2026 · 6 m away - Building permit
Proposal for a 3 storey & basement addition to an existing independent school.See 26 -148097 ALT 00 AS
318 LAWRENCE AVE E · Nov 17, 2026 · 153 m away - Building permit
Proposed storage structure for school by using two 40ft shippping containers stacked.
318 LAWRENCE AVE E · Oct 7, 2026 · 153 m away - Building permit
Proposed back water valve installation only ( sewer)
2 WOOD AVE · Sep 16, 2026 · 210 m away - Building permit
Proposed heat pump replacement and duct work adjustment
2 CHEDINGTON PL · May 25, 2026 · 6 m away - Development application
Draft Plan of Condominium proposes to infill the pool and re-designate it as unit 109.
1 CHEDINGTON PL · May 6, 2026 · 112 m away · City file - Building permit
Alternative solution proposal in connection with permit No. 26 126835 BLD 00 BA to construct the roof assembly of the ground floor lobby, and its supporting structure of combustible heavy timber elements.
318 LAWRENCE AVE E · Apr 22, 2026 · 153 m away - Zoning review
Application On Hold
1 WOOD AVE · Feb 10, 2026 · 238 m away - Building permit
HVAC - Proposal to replace the existing kitchen exhaust hoods and provide a new make-up air unit. See related permit 20-109954 MS.
318 LAWRENCE AVE E · Nov 21, 2025 · 153 m away - Building permit
REPLACEMENT ROOF TOP UNIT
318 LAWRENCE AVE E · Mar 27, 2025 · 153 m away
Neighbourhood: Bridle Path-Sunnybrook-York Mills
About the area around the lot, not the lot itself.
- Nearest station
- Lawrence Station28 min walk
- Nearest TTC stop
- Bayview Ave at Lawrence Ave East - York University Glendon Campus2 min walk
- Nearest cycling route
- Bayview AveBike Lane, 1 min walk
- Nearest traffic count
- 6,452 vehicles in 8 hLawrence Ave E / Chedington Pl, 130 m away, Dec 15, 2009
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- Cheltenham Park6 min walk
- Sunnybrook Park10 min walk
- Stratford Park12 min walk
Schools within 1 km
- TORONTO FRENCH SCHOOL - SR LAWRENCE Private 3 min walk
- YORK U - GLENDON CAMPUS University 5 min walk
- CRESTWOOD SCHOOL Private 5 min walk
- TORONTO FRENCH SCHOOL - JR LAWRENCE Private 5 min walk
- TORONTO FRENCH SCHOOL, JARDIN D'EVEIL (CHILD CARE HOUSE) 416 484-6533 Private 6 min walk
- TORONTO FRENCH SCHOOL - JR MILDENHALL Private 7 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Bridle Path-Sunnybrook-York Mills | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $222,000 | $84,500 |
| Households that own their home | 89% | 54% |
| Population (2021) | 8,940 | 16,813 |
| Homes built in 1960 or before | 22% | 29% |
| Homes needing major repairs | 3% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Bridle Path-Sunnybrook-York Mills | City median |
|---|---|---|
| Assault | 205.9 | 636.3 |
| Robbery | 51.5 | 69.5 |
| Shootings | 17.2 | 10.5 |
| Auto theft | 197.4 | 192.6 |
| Theft over $5,000 | 34.3 | 46.1 |
| Break and enter | 403.3 | 172.8 |
| Theft from vehicles | 163 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.