HousePrecheckCheck an address

2 Bloor St EToronto · zoning, lot size and permit records

Also 20 Bloor St E, 44 Bloor St E, 80 Bloor St E, 88 Bloor St E, 90 Bloor St E and 1 more

Commercial residential · CR 6.0 (c4.5; r6.0) SS1 (x1380)75.7 × 99.0 m6,499 m²on Bloor St E

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 25 storeys, 336 rental units, built 1972More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 26 255207 (Proposal for interior alterations to an existing office, 2026); 26 255142 (Proposal to install two (2) electromagnetic door locks at elevator lobby, 2026); 26 184949 (Revision to remove the area to the north and include the area to the eastProposed inter..., 2026); and 12 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 13 development applications open within 300 m, up to 94 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • City upkeep score: 95 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Bloor-YongeThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
75.7 m frontage99.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 39 building permits open, the oldest since 2011

    Needs a closer look

    Still open in the City's records: 24 138910 (To locally repair a suspended concrete slab service as an access ramp and replace a sec..., 2024, status Inspection); 24 164725 (Proposed interior alterations landlord to bring an existing office unit back to base. -..., 2024, status Inspection); 23 231667 (PROPOSED: Interior Alterations and level 6 addition, 2024, status Permit Issued); and 36 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 16 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards, Zoning): 26 241890 PRS 00 IR (Property Standards, 2026); 26 196853 PRS 00 IR (Property Standards, 2026); 26 194379 ZON 00 IR (Zoning, 2026); and 13 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 255207 (Proposal for interior alterations to an existing office, 2026); 26 255142 (Proposal to install two (2) electromagnetic door locks at elevator lobby, 2026); 26 184949 (Revision to remove the area to the north and include the area to the eastProposed inter..., 2026); and 12 more.

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • Records mention multiplex

    Good to know

    Permits or Committee of Adjustment files on this lot mention multiplex: 17 263588 (...of the existing sewage collection tank, duplex pumps and pump control panel with a new..., 2017).

    What it means. Check that the unit you would buy matches what was approved, and that its permit was closed after final inspection.

    How to confirm. Ask the seller for the permit and final inspection. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0269/19TEY (To make multiple alterations to the hotel portion of the mixed-use building. A new rest..., 2019).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 13 development applications open within 300 m

    Good to know

    13 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 94 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 95 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (25 storeys, 336 units, built 1972).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

633 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 271854Cancelled

    Proposed interior alterations to an existing office

    Nov 18, 2026 · 2 BLOOR ST E
  • Building permit26 255207Permit Issued

    Proposal for interior alterations to an existing office.

    Nov 17, 2026 · 2 BLOOR ST E
  • Building permit26 255142Permit Issued

    Proposal to install two (2) electromagnetic door locks at elevator lobby.

    Oct 20, 2026 · 2 BLOOR ST E
  • By-law investigation26 241890 PRS 00 IRClosed

    Property Standards

    Sep 22, 2026 · 88 BLOOR ST E
  • Building permit26 184949Revision Issued

    Revision to remove the area to the north and include the area to the eastProposed interior alterations for consulat general de France a Toronto

    Sep 18, 2026 · 2 BLOOR ST E
  • Building permit26 219796Permit Issued

    Proposal for interior alterations to demo existing car rental kiosk to build a new kiosk.

    Aug 31, 2026 · 2 BLOOR ST E
  • Building permit26 220790Permit Issued

    Proposal for interior alterations to existing office space - FLOOR 19, SUITE 1920

    Aug 18, 2026 · 2 BLOOR ST E
  • Building permit26 193273Closed

    FSU related to Building permit 24 220059 BLD 00 BA for minor changes to sprinkler layout.

    Jul 17, 2026 · 2 BLOOR ST E
Show 192 older records
  • Building permit26 177780Permit Issued

    Proposal Interior alteration of existing office space and partial fitness centre into a spa, W HOTEL TORONTO, 8TH FLOOR

    Jul 9, 2026 · 90 BLOOR ST E
  • By-law investigation26 196853 PRS 00 IRClosed

    Property Standards

    Jul 6, 2026 · 88 BLOOR ST E
  • By-law investigation26 194379 ZON 00 IRClosed

    Zoning

    Jun 30, 2026 · 88 BLOOR ST E
  • Building permit24 220059Closed

    Revision 01: revision see attached bubbled drawings and revision narrative.Plumbing - Interior alterations to basement level B1 to replace chiller plant and create temporary opening for future plant replacement at street level to accommodate construction activities

    Jun 22, 2026 · 2 BLOOR ST E
  • By-law investigation26 178939 PRS 00 IRClosed

    Property Standards

    Jun 5, 2026 · 2 BLOOR ST E
  • Building permit25 229495Revision Issued

    REV01: Proposed revision interior alterations including demolition of interior partitions and construction of newProposed interior alterations - new tenant alteration into a vacant space. Construction of interior non-load bearing partitions and finishes. Mechanical and Electrical alterations to suit new layout.

    Jun 3, 2026 · 2 BLOOR ST E
  • By-law investigation26 172717 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 88 BLOOR ST E
  • By-law investigation26 172716 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 88 BLOOR ST E
  • Zoning review26 148240 PRZClosed
    May 26, 2026 · 2 BLOOR ST E
  • Building permit26 165512Permit Issued

    Proposed landlord interior alterations to group D office tenant on 16th floor.

    May 26, 2026 · 2 BLOOR ST E
  • Building permit25 202955Closed

    Revision 01 - see attached list.Proposal for interior alterations for floor 32.

    May 26, 2026 · 2 BLOOR ST E
  • Development application26 148240 STE 11 OZUnder Review

    Zoning By-law Amendment to permit a self-storage warehouse use on floors 2-5 (formely The Bay retail space). The existing ground floor retail unit will be maintained. Access for loading and parking will be from Asquith Avenue. No new development is proposed on site.

    Apr 22, 2026 · 90 BLOOR ST E · City file
  • By-law investigation26 139260 GRA 00 IRClosed

    Graffiti

    Apr 6, 2026 · 2 BLOOR ST E
  • By-law investigation26 106571 HEA 00 IRClosed

    Adequate Heat

    Jan 19, 2026 · 88 BLOOR ST E
  • By-law investigation26 104984 PRS 00 IRClosed

    Property Standards

    Jan 14, 2026 · 88 BLOOR ST E
  • Building permit25 265710Closed

    Proposal for interior alterations including demolition of interior partitions.

    Dec 24, 2025 · 2 BLOOR ST E
  • Zoning review25 269353 ZAPNotice Sent
    Dec 23, 2025 · 2 BLOOR ST E
  • By-law investigation25 265488 PRS 00 IRClosed

    Property Standards

    Dec 11, 2025 · 88 BLOOR ST E
  • Building permit25 234872Permit Issued

    Converting part of the 6th floor of an existing Hotel lobby/bar area into a ballroom space.

    Dec 10, 2025 · 90 BLOOR ST E
  • Building permit24 227779Revision Issued

    REV01: Proposed revision to interior partitions layout to suite 1203Proposal for interior alterations to existing office space on the 12th floor

    Dec 10, 2025 · 2 BLOOR ST E
  • Building permit25 223754Closed

    REV 01: PROPOSED REVISION PER DRAWINGSProposed interior alterations including demolition of interior partitions and construction of new.

    Dec 9, 2025 · 2 BLOOR ST E
  • Building permit25 196212Closed

    Rev 01 - Implementing greywater pumps for lunchroom sink/water dispenser drainage and universal washroom layout.Plumbing - Proposal for interior alterations to fit a commercial office and gym space.

    Nov 24, 2025 · 2 BLOOR ST E
  • Building permit25 247357Cancelled

    Proposal for interior alterations to existing stairwell

    Oct 31, 2025 · 2 BLOOR ST E
  • Building permit25 217354Closed

    Proposal to replace broken post-tensioned cables embedded in the 4th floor slab.

    Sep 30, 2025 · 2 BLOOR ST E
  • Building permit25 223759Inspection

    Proposal to install new security gates in an existing retail store - Shoppers Drug MartConvenience address is 20 Bloor St E

    Sep 17, 2025 · 2 BLOOR ST E
  • Building permit25 223415Inspection

    Proposal to install 2 double door maglocks on the 10th Floor Elevator Lobby.

    Sep 17, 2025 · 2 BLOOR ST E
  • Building permit25 197885Closed

    Revision No 1 - to office areas by modifying the orientation of the offices.Proposed interior alterations including demolition of partitions and construction of new

    Sep 4, 2025 · 2 BLOOR ST E
  • By-law investigation25 211694 PRS 00 IRClosed

    Property Standards

    Aug 17, 2025 · 88 BLOOR ST E
  • By-law investigation25 202088 PRS 00 IVClosed

    Order Issued Property Standards: The air conditioning system is not operating so as to maintain an indoor temperature of not more than twenty-six degrees Celsius (26C).

    Jul 28, 2025 · 88 BLOOR ST E
  • By-law investigation25 201675 PRS 00 IRClosed

    Property Standards

    Jul 28, 2025 · 88 BLOOR ST E
  • Building permit25 190380Closed

    Proposal for minor interior renovations, minor demo, new partition walls, HVAC modifications, revised power distribution, some sprinkler modifications

    Jul 21, 2025 · 2 BLOOR ST E
  • Building permit25 169407Closed

    Proposal for renovation of an existing Tim hortons restaurant, Interior modifications to service area including new equipment, millwork & finishes.

    Jul 15, 2025 · 2 BLOOR ST E
  • Building permit25 183074Cancelled

    Proposal for interior renovations, minor demo, new partition walls, HVAC modifications, revised power distribution, some sprinkler modifications.

    Jun 24, 2025 · 2 BLOOR ST E
  • By-law investigation25 171465 PRS 00 IRClosed

    Property Standards

    Jun 4, 2025 · 2 BLOOR ST E
  • By-law investigation25 165992 PRS 00 IRClosed

    Property Standards

    May 27, 2025 · 88 BLOOR ST E
  • By-law investigation25 166077 PRS 00 IVClosed

    Order Issued Property Standards: Floor and/or floor covering not kept free from holes, stains, rubbish and debris.Namely, closet floor is stained and not level.; The ventilation system or unit is not kept in good repair and maintained in good working condition at all times.Namely, washroom ventilation system not in good ; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials.Namely, bathroom tile not free of holes and cracks

    May 16, 2025 · 88 BLOOR ST E
  • By-law investigation25 160931 PRS 00 IRClosed

    Property Standards

    May 16, 2025 · 88 BLOOR ST E
  • Zoning review25 135417 LTOClosed
    Mar 26, 2025 · 20 BLOOR ST E
  • Zoning review25 135411 LTOClosed
    Mar 26, 2025 · 20 BLOOR ST E
  • By-law investigation25 113400 SIN 00 IRClosed

    Signs

    Feb 6, 2025 · 2 BLOOR ST E
  • Building permit24 114609Revision Issued

    REV 02 -THIS PERMIT REVISION SUBMISSION IS FOR INCORPORATING THE REPLACEMENT OF THE EXITING FIRE ALARM CONTROL PANELS SERVING OLD BAY PODIUM LEVELS AND CONNECTING THEM TO A NEW FIRE ALARM NETWORK 'E'. ALL EXISTING DEVICES WILL REMAIN UNCHANGED.REV 01 - THIS PERMIT REVISION SUBMISSION IS FOR INSTALLING ADDITIONAL FIRE ALARM CONTROL AND MONITORING MODULES TO INTEGRATE THE SMOKE EXHAUST SYSTEM'S FANS AND DAMPERS SERVING OFFICE TOWER AT 2 BLOOR ST E WITH THE NEW FIRE ALARM SYSTEM DURING THIS PANEL REPLACEMENT PROJECT.

    Jan 31, 2025 · 2 BLOOR ST E
  • Building permit24 249828Closed

    Proposed interior alterations.

    Jan 28, 2025 · 2 BLOOR ST E
  • Building permit25 105964Closed

    Proposed interior alterations to suite 301.

    Jan 23, 2025 · 2 BLOOR ST E
  • Building permit24 249807Closed

    Proposal for electromagentic locks

    Dec 29, 2024 · 2 BLOOR ST E
  • Building permit24 252258Closed

    Proposed interior alterations including construction of new partitions.

    Dec 24, 2024 · 2 BLOOR ST E
  • Building permit24 230607Inspection

    Work under this contract is to replace broken post-tensioning (PT) cables embedded in the 28th floor slab.

    Nov 27, 2024 · 2 BLOOR ST E
  • Zoning review24 235544 LTOClosed
    Nov 6, 2024 · 2 BLOOR ST E
  • Building permit24 199242Closed

    Proposed work under this contract is to repair deteriorated concrete along the parking garage exterior elevations and interior suspended slabs.

    Sep 16, 2024 · 2 BLOOR ST E
  • Building permit24 175337Closed

    Proposal for interior alterations including demolition of interior partitions and construction of new.

    Jul 15, 2024 · 2 BLOOR ST E
  • Building permit24 138910Inspection

    To locally repair a suspended concrete slab service as an access ramp and replace a section of the existing concrete topping and waterproofing system.

    Jun 27, 2024 · 2 BLOOR ST E
  • Building permit24 164725Inspection

    Proposed interior alterations landlord to bring an existing office unit back to base. - 16th Floor

    Jun 17, 2024 · 2 BLOOR ST E
  • Building permit23 231667Permit Issued

    PROPOSED: Interior Alterations and level 6 addition

    Jun 14, 2024 · 2 BLOOR ST E
  • Building permit24 153234Closed

    NTERIOR ALTERATIONS INCLUDING DEMOLITION OF INTERIOR PARTITIONS AND CONSTRUCTION OF NEW.

    May 29, 2024 · 2 BLOOR ST E
  • Building permit23 232864Closed

    Proposal to to replace broken post-tensioning cables embedded in the 16th floor slab.

    Apr 30, 2024 · 2 BLOOR ST E
  • Building permit24 125930Approved

    PROPOSED: To proposed convenience stairs between Level 5 and Level 6 within the Yonge and Bloor development will be provided with a vertical opening that is less that 10m² consistent with the requirements of OBC Sentence 3.2.8.2(5)

    Mar 15, 2024 · 2 BLOOR ST E
  • Building permit24 100336Closed

    Rev 01: ADDED 2 PHONE ROOMS 35-08A AND 35-08B TO THE SCOPE OF WORK. Proposed interior alterations including demolition of partitions and construction of new office.

    Mar 11, 2024 · 2 BLOOR ST E
  • Building permit23 211642Inspection

    Proposal for interior alterations to return the existing office on the existing 5th floor level to base building condition.

    Nov 8, 2023 · 2 BLOOR ST E
  • Building permit23 142396Closed

    Revision 01 - corridor demising wall and double glass doors, added new egress door and infill with new drywall partition.INTERIOR ALTERATIONS INCLUDING DEMOLITION OF INTERIOR PARTITIONS AND CONSTRUCTION OF NEW.

    Oct 11, 2023 · 2 BLOOR ST E
  • Building permit23 133190Revision Issued

    REV 01 - Minor landlord improvement work to the corridors.Proposal for interior alterations to an existing office unit on a portion of the 12th floor level. Return unit to base building condition & landlord improvement work to the corridors.

    Oct 2, 2023 · 2 BLOOR ST E
  • Building permit23 183544Inspection

    FIRESTOP UPGRADE TO EXISTING BUILDING - FLOORS 2 TO 34

    Aug 29, 2023 · 2 BLOOR ST E
  • Zoning review23 192128 LPRClosed
    Aug 22, 2023 · 2 BLOOR ST E
  • Building permit23 147095Closed

    Rev01: NOTE THAT FLOOR 27 IS NO LONGER IN THE SCOPEProposed landlord's work for brookfield properties

    Jul 26, 2023 · 2 BLOOR ST E
  • Building permit23 170115Closed

    Install an acousitc fence on the roof - W Hotel

    Jul 21, 2023 · 2 BLOOR ST E
  • Building permit23 164388Closed

    Interior alterations including demolition of interior partitions and construction of new walls, suite 1802 - Brookfield

    Jun 27, 2023 · 2 BLOOR ST E
  • Building permit23 142535Closed

    Interior alterations to Shoppers Drug Mart

    Jun 23, 2023 · 20 BLOOR ST E
  • Building permit23 156306Permit Issued

    MODIFIED ENTRANCE FOR DOLLARAMA

    Jun 20, 2023 · 2 BLOOR ST E
  • Building permit22 242834Closed

    Proposal for interior alterations to existing office space on the 23rd floor.

    Jan 31, 2023 · 2 BLOOR ST E
  • Building permit22 231516Permit Issued

    Fire alarm interface to hotel door strikes

    Dec 19, 2022 · 2 BLOOR ST E
  • Building permit22 221145Permit Issued

    Fire alarm panel replacement

    Dec 2, 2022 · 2 BLOOR ST E
  • Building permit22 225611Closed

    Proposal to install four (4) single door electromagnetic locks on 24th floor

    Nov 3, 2022 · 2 BLOOR ST E
  • Building permit22 225165Cancelled

    Plumbing - interior alterations floor 31

    Nov 2, 2022 · 2 BLOOR ST E
  • Building permit22 202509Closed

    Proposed interior alterations to existing office space, 9th Floor.

    Oct 11, 2022 · 2 BLOOR ST E
  • Building permit22 208294Closed

    FIRE/SECURITY UPGRADE, OFFICE, ELECTORMAGNETIC LOCKSTO INSTALL 2 DOUBLE MAGLOCK ON ELEVATOR LOBBY DOOR AND 1 DOUBLE MAGLOCK ON THE FREIGHT ELEVATOR LOBBY.

    Sep 28, 2022 · 2 BLOOR ST E
  • Building permit22 191214Closed

    Proposed interior alteration of office. Updated layout, updated HVAC according to the proposed layout

    Sep 14, 2022 · 2 BLOOR ST E
  • Building permit22 184078Closed

    Proposal to repair deteriorated concrete balustrades and slab edges along the parking Garage's north elevation. The scope of work includes completing repairs in the garage portion identified as Phase 4.

    Sep 2, 2022 · 2 BLOOR ST E
  • Zoning review22 195297 ZAPCancelled
    Aug 24, 2022 · 2 BLOOR ST E
  • Building permit22 165438Closed

    Proposal for interior alterations to the existing office space on the 28th floor for new office partitions, mechanical and electrical infrastructure.

    Aug 4, 2022 · 2 BLOOR ST E
  • Building permit22 172332Cancelled

    Fire alarm panel replacement

    Jul 5, 2022 · 90 BLOOR ST E
  • Zoning review22 140009 PSPClosed
    May 5, 2022 · 2 BLOOR ST E
  • Building permit20 154478Revision Issued

    Rev 3: Addition to floor 9 & 10. New dry sprinkler, window sprinkler and rework existing standpipeRelocate C/W new pendant sprinkler heads. Add new window sprinkler system

    May 4, 2022 · 2 BLOOR ST E
  • Building permit22 116070Closed

    Proposal for interior alterations to existing unit 1901 on a partial portion of a multi-tenant floor (19th) including expansion into an adjacent suite and construction of new interior partitions. Tenant - 'TTC Pension Fund' [Hudson's Bay Center]

    Mar 23, 2022 · 2 BLOOR ST E
  • Building permit22 106182Closed

    Proposal to install structural steel support beams at the inside face of the P4, P5, and P6 garage balustrades.

    Jan 27, 2022 · 2 BLOOR ST E
  • Building permit22 101489Closed

    Interior alterations including the removal of tenant to tenant demising wall for expansion of adjacent unit. Removal of door into corridor, construction of new tenant demising wall - Unit 1901

    Jan 20, 2022 · 2 BLOOR ST E
  • Building permit21 251663Closed

    HVAC - 8TH FLOOR - MODEL SUITES - INTERIOR ALTERATIONS

    Jan 17, 2022 · 2 BLOOR ST E
  • Building permit21 218957Closed

    Proposal for interior alterations to return an existing office on the 8th floor level to base building conditions.

    Oct 25, 2021 · 2 BLOOR ST E
  • Building permit21 208398Closed

    Proposal for interior alterations to an existing office on the 9th floor level to return to base building conditions.

    Oct 19, 2021 · 2 BLOOR ST E
  • Building permit21 208985Permit Issued

    To add strobe lights in common corridors in existing building

    Oct 12, 2021 · 2 BLOOR ST E
  • Building permit21 137977Closed

    REV 01 - revision to modify retail store entrance at the ground floor / concourse level (Hudson's Bay Centre).Proposal for interior alterations to existing retail store. Unit B01 "Dollarama"

    Sep 24, 2021 · 2 BLOOR ST E
  • Building permit20 147750Closed

    To erect and display one illuminated ground sign displaying static copy. Erected at the south frontage of the property. The sign measures 2.24m vertically by 3.16 m horizontally. **W Hotel**

    Aug 10, 2021 · 2 BLOOR ST E
  • Building permit21 153036Closed

    Revision 01: interior layout changes as per bubbled drawings

    Jul 21, 2021 · 2 BLOOR ST E
  • Building permit21 172457Inspection

    Proposal for interior alterations for existing office unit 2204

    Jul 8, 2021 · 2 BLOOR ST E
  • Building permit21 167602Permit Issued

    Proposal for fire alarm panel replacement (Node 14 - Concourse Level)

    Jul 8, 2021 · 2 BLOOR ST E
  • Building permit21 163134Closed

    Plumbing - Proposal for interior alterations to existing office space on the 15th floor.

    Jun 16, 2021 · 2 BLOOR ST E
  • Building permit21 159729Closed

    Proposed interior alterations an existing office on 15th floor

    Jun 4, 2021 · 2 BLOOR ST E
  • Building permit21 149933Closed

    Proposal for interior alterations to existing office building 15th floor

    May 27, 2021 · 2 BLOOR ST E
  • Building permit21 107093Permit Issued

    STRUCTURAL WORK - Replace broken post tensioning cables in the 2nd and 20th floor

    May 19, 2021 · 2 BLOOR ST E
  • Building permit21 131290Permit Issued

    Proposal to replace fire alarm spot type heat detector - 6th Floor Mechanical Room Service Space above Bay Store

    Apr 26, 2021 · 2 BLOOR ST E
  • Building permit21 121877Permit Issued

    Proposal for replacement of the fire alarm panel

    Mar 30, 2021 · 2 BLOOR ST E
  • Building permit20 229978Closed

    Proposal for interior alterations for a new tenant fit up in Suite 701.

    Jan 5, 2021 · 2 BLOOR ST E
  • Building permit20 215155Closed

    Proposal to erect and display two illuminated wall signs, displaying static copy at the uppermost storey on the south and north elevations.****W HOTEL****

    Dec 8, 2020 · 2 BLOOR ST E
  • Building permit20 221934Permit Issued

    To add strobe lights in units 508,534,608,634,644

    Nov 24, 2020 · 2 BLOOR ST E
  • Building permit20 161411Permit Issued

    Interior alterations to 18 floor *Bayan Software* 2 new offices in existing open space. Sprinklers and Gas. HVAC and Plumbing

    Jul 3, 2020 · 2 BLOOR ST E
  • Building permit20 157134Closed

    Proposal to install 2 double door maglocks on 17th floor of existing office building at "Verafin".

    Jun 30, 2020 · 2 BLOOR ST E
  • Building permit20 161095Approved

    Alternate Solution Proposal to renovate and upgrade the east bound platform on Line 2 of the TTC Bloor-Yonge Station with platform clearances less than 2.5m.

    Jun 28, 2020 · 2 BLOOR ST E
  • Zoning review20 151933 ZSVClosed
    Jun 3, 2020 · 2 BLOOR ST E
  • Zoning review20 137134 ZSVCancelled
    Apr 22, 2020 · 2 BLOOR ST E
  • Building permit20 111776Closed

    Proposal for interior alterations to existing suite (1700).

    Apr 15, 2020 · 2 BLOOR ST E
  • Building permit20 100326Cancelled

    Proposal for interior alterations to unit C55 on the concourse level to an existing blood donor clinic "CBS - Canadian Blood Services". Millwork Reception Desk with new bulkhead and lighting above, new partition, reworking of 2 screening rooms with de-mountable partitions, relocations of fluorescent light fixtures, air diffusers, 2 emergency light fixtures and acoustical ceiling tiles. Minor demolition of partial walls, floor patching with resilient floor finish to match existing. Electrical additions & modifications for outlets and for lighting.

    Jan 29, 2020 · 2 BLOOR ST E
  • Building permit19 252369Closed

    Proposal for interior demolition back to base build on the 10th floor of the existing office building.

    Jan 8, 2020 · 2 BLOOR ST E
  • Building permit19 248103Closed

    Proposal for interior alterations for existing office unit 810

    Dec 23, 2019 · 2 BLOOR ST E
  • Building permit19 258156Closed

    Interior alterations to the 20th floor office suite.

    Dec 19, 2019 · 2 BLOOR ST E
  • Building permit19 253698Closed

    Proposed interior alterations to existing office - Unit 2200A.

    Dec 2, 2019 · 2 BLOOR ST E
  • Building permit19 245098Closed

    Proposal for interior alteration for take out restaurant unit F6 on concourse level.

    Nov 21, 2019 · 2 BLOOR ST E
  • Building permit18 107660Closed

    REV #1-EXISTING CONDITIONSProposal for interior alterations to relocate stair and elevators on basement and concourse levels of existing multiple unit building.

    Oct 2, 2019 · 2 BLOOR ST E
  • Building permit19 126999Closed

    Conditional Permit - Proposal for South Facade Renovation - demolish existing marquee, new curtain wall, new cladding over existing, New Addition, Floor 9: 1.5-storey Rooftop Bar interior mezzanine and exterior terrace, glass elevator with stops at Rooftop Bar and Ground Floor only at South facade, Renovation, Floor 6: Replace existing curtain wall at interior Lobby/Courtyard with new curtain wall.New curtain wall at East exterior drop-off drive, Ground Floor in existing Hotel. "Marriot Hotel"

    Sep 20, 2019 · 2 BLOOR ST E
  • Zoning review19 195103 LTOClosed
    Jul 25, 2019 · 2 BLOOR ST E
  • Building permit19 180108Closed

    PROPOSED: INTERIOR ALTERATION TO INSTALL A 'LONGOS' SUPERMARKET POP-UP STORE IN THE MALL CONCOURSE AT 2 BLOOR ST E. INCLUDES MECHANICAL AND PLUMBING.NOTE - 2 DIFFERENT MECHANICAL ENGINEERS.

    Jul 12, 2019 · 2 BLOOR ST E
  • Minor varianceA0269/19TEYApproved

    To make multiple alterations to the hotel portion of the mixed-use building. A new restaurant/bar will be constructed on the podium roof along with a new elevator. Two pedestrian walkways connecting to the concourse, Yonge-Bloor subway station, and adjacent to the hotel vehicle pickup area will be enclosed.

    Jun 12, 2019 · 2 BLOOR ST E
  • Building permit19 137647Closed

    HVAC - Interior alteration to 19th floor.

    May 2, 2019 · 2 BLOOR ST E
  • Building permit19 125861Closed

    Proposed installation of four (4) electromagnetic locks on 26th Floor.

    Mar 20, 2019 · 2 BLOOR ST E
  • Building permit19 114059Closed

    HVAC - Proposed interior alterations to an existing transit station to convert an existing construct a crowd control room to a zone hub function.

    Mar 13, 2019 · 2 BLOOR ST E
  • Zoning review18 256880 PSPClosed
    Feb 21, 2019 · 2 BLOOR ST E
  • Building permit18 265914Closed

    Proposed interior alterations to an existing office space on the 26th floor.

    Jan 3, 2019 · 2 BLOOR ST E
  • Zoning review18 268405 LTOClosed
    Dec 14, 2018 · 2 BLOOR ST E
  • Building permit18 248580Closed

    Proposal for interior alterations to existing office space on the 35th floor.

    Nov 23, 2018 · 2 BLOOR ST E
  • Development application18 256880 STE 27 SAClosed

    Site Plan Approval Application for a 4th floor hotel addition and elevator addition to the south façade of the existing building.

    Nov 15, 2018 · 2 BLOOR ST E · City file
  • Building permit18 248576Closed

    Propsoed interior alterations to room 606 on 6th floor.

    Nov 12, 2018 · 2 BLOOR ST E
  • Building permit18 234568Closed

    Proposal for interior alterations to unit 2000 in existing office building.

    Oct 29, 2018 · 2 BLOOR ST E
  • Building permit18 245425Permit Issued

    Proposal to replace 16 broken post-tensioning (PT) cables embedded in the 2nd and 5th floors in existing mixed use building.

    Oct 25, 2018 · 2 BLOOR ST E
  • Building permit18 230075Closed

    Proposal for interior alterations to existing office building. floor 19

    Oct 5, 2018 · 2 BLOOR ST E
  • Building permit18 228207Cancelled

    Proposal for landlord alterations for barrier free washroom upgrade on the 26th floor of the existing office building.

    Sep 21, 2018 · 2 BLOOR ST E
  • Building permit18 200795Closed

    Proposal for interior alterations to the food court located the concourse level for new exhaust system and ecology unit.

    Sep 17, 2018 · 2 BLOOR ST E
  • Building permit18 194675Closed

    Proposal for interior alterations to level 2 of an existing multi-unit building. Tenant - "Purebeauty" Convenience address is 44 BLOOR ST E.

    Jul 16, 2018 · 2 BLOOR ST E
  • Building permit18 189967Closed

    Proposal for interior alterations to existing office space on the 20th floor including common corridor and washrooms (landlord work).

    Jul 9, 2018 · 2 BLOOR ST E
  • Building permit18 189959Closed

    Proposal for interior alterations including removal of partition walls to existing office space on the 19th floor (landlord work).

    Jul 9, 2018 · 2 BLOOR ST E
  • Building permit18 126900Closed

    Proposal to construct interior alterations to 29th Floor existing office space.

    Mar 21, 2018 · 2 BLOOR ST E
  • Building permit18 119017Closed

    HVAC - Proposal to construct modification to existing HVAC equipment which includes electrical and mechanical upgrades inside TTC Yonge-Bloor subway station at Electrical rooms. Installation of new floor drain and hose bibb.

    Mar 15, 2018 · 20 BLOOR ST E
  • Building permit18 121907Closed

    INTERIOR ALTERATIONS TO SUITE 3501 FOR BLD AND HVAC.

    Mar 12, 2018 · 2 BLOOR ST E
  • Building permit18 110343Closed

    Proposal for interior alterations to unit 2830 of existing office "Neuberger Berman"

    Feb 5, 2018 · 2 BLOOR ST E
  • Building permit18 111451Closed

    Adding 1 maglock to the existing office space.

    Jan 30, 2018 · 2 BLOOR ST E
  • Building permit17 277614Closed

    Minor interior alterations to existing office space

    Jan 8, 2018 · 2 BLOOR ST E
  • Building permit17 263588Closedmultiplex

    Plumbing - Proposal for interior alterations for replacement of the existing sewage collection tank, duplex pumps and pump control panel with a new collection tank, emergency storage tank, 19mm hose bibb, inline grinder, duplex pumps, grinder and pump concrete support pads, grinder control panel and pump control panel.

    Dec 15, 2017 · 20 BLOOR ST E
  • Building permit17 269484Permit Issued

    Proposed localized concrete repairs and steel staircase replacement for existing public garage.

    Dec 14, 2017 · 2 BLOOR ST E
  • Building permit17 265905Closed

    Proposed interior alterations to relocate an interior door.

    Dec 6, 2017 · 2 BLOOR ST E
  • Building permit17 242035Closed

    Proposal for interior alterations to existing transit station. Scope of work includes replacing legacy turnstiles with Presto fare gates - Bloor Yonge Subway Station

    Oct 24, 2017 · 20 BLOOR ST E
  • Building permit17 239859Inspection

    Proposal for replacement of 1 bundle of 6 post-tensioned cables in the 4th floor slab.

    Oct 23, 2017 · 2 BLOOR ST E
  • Building permit17 234810Closed

    Proposal for interior alterations to unit C55 on the concourse level for new blood donor clinic "CBS"

    Oct 5, 2017 · 2 BLOOR ST E
  • Building permit17 199670Closed

    Proposal for interior alterations on the 4th floor of an existing office building. Tenant is Israeli Consulate.

    Aug 24, 2017 · 2 BLOOR ST E
  • Building permit17 207280Closed

    Proposal for interior alterations to unit 601 + 602 in existing office - "IPC"

    Aug 18, 2017 · 2 BLOOR ST E
  • Building permit17 186642Closed

    HVAC - Modification to existing elevator machines rooms which includes electrical and mechanical upgrades.

    Jul 31, 2017 · 20 BLOOR ST E
  • Zoning review17 196730 LTOClosed
    Jul 12, 2017 · 2 BLOOR ST E
  • Building permit17 154429Permit Issued

    Proposal for concrete repair to existing podium deck on the ground level of exiting multiple unit building

    Jun 7, 2017 · 2 BLOOR ST E
  • Building permit17 130213Closed

    Proposed interior alterations to the existing office space on the 9th floor

    Apr 18, 2017 · 2 BLOOR ST E
  • Building permit17 112646Permit Issued

    REPLACEMENT AND REPAIR OF DCW BOOSTER PUMPS AND ASSOCIATED DCW PIPING IN BASEMENT PUMP ROOM SERVING THE HOTEL, APARTMENT AND RETAIL AREA.

    Mar 6, 2017 · 2 BLOOR ST E
  • Building permit17 121004Approved

    Replacement of existing 6" cast iron piping

    Feb 24, 2017 · 2 BLOOR ST E
  • Zoning review17 117017 LTOClosed
    Feb 15, 2017 · 2 BLOOR ST E
  • Building permit16 179714Closed

    REV #2-SUITE ON S/E SIDE TO BE DEMOLISHED, CORRIDORS REMOVED 4TH FLRProposal for interior demolition and to construct 1 demising wall on the 4th floor of the office building.

    Jan 26, 2017 · 2 BLOOR ST E
  • Building permit16 271334Permit Issued

    INTERIOR ALTERATIONS TO FLOOR 21 (BLD & HVAC)

    Jan 12, 2017 · 2 BLOOR ST E
  • Building permit16 270340Permit Issued

    Proposal to repair the slab on the second floor

    Jan 12, 2017 · 2 BLOOR ST E
  • Building permit16 262068Closed

    Propose interior alteration on level 1 in the HUDSON'S BAY store.

    Dec 22, 2016 · 44 BLOOR ST E
  • Building permit16 255350Closed

    Proposal fro interior alterations to Suite A and interior demo to Suite B on the 35th floor of the existing office building.

    Dec 21, 2016 · 2 BLOOR ST E
  • Zoning review16 263549 LTOClosed
    Dec 13, 2016 · 2 BLOOR ST E
  • Building permit16 247241Closed

    Interior millwork fit-out and new finishes for new retail tenant (Fixt Wireless) in existing retail/mercantile space. Existing partition walls & storefront to remain. Construction of new half-parition wall in retail. Existing lighting and ceiling to remain. New signage on storefront.

    Nov 24, 2016 · 2 BLOOR ST E
  • Building permit16 241920Closed

    Proposal for interior alterations to the 3rd floor of existing office.

    Nov 22, 2016 · 2 BLOOR ST E
  • Building permit16 231294Closed

    interior alterations to existing office Unit 2210 -PACO

    Oct 14, 2016 · 2 BLOOR ST E
  • Building permit16 222822Closed

    Proposal to install hair sink into existing salon in unit C14

    Oct 3, 2016 · 2 BLOOR ST E
  • Zoning review16 209648 LTOClosed
    Aug 19, 2016 · 2 BLOOR ST E
  • Building permit16 208285Closed

    Proposal for interior demolition to go back to base build on the concourse level C55 in the existing multiple use building.

    Aug 18, 2016 · 2 BLOOR ST E
  • Building permit16 190858Closed

    Proposal for interior fit up of existing convenience store including new paint, new fixtures, new bulkhead sign.

    Aug 15, 2016 · 2 BLOOR ST E
  • Building permit16 200354Permit Issued

    GARAGE CONCRETE SUSPENDED SLAB REHABILITATION (PHASE 4 - P1 LEVEL).

    Aug 12, 2016 · 2 BLOOR ST E
  • Building permit16 186206Cancelled

    Proposal for interior alterations to unit C55 on the concourse level of the exsiting office building.

    Jul 28, 2016 · 2 BLOOR ST E
  • Building permit16 194661Closed

    Proposal for interior alterations. Tenant is 'SPAFAX', unit 1020.

    Jul 26, 2016 · 2 BLOOR ST E
  • Building permit16 187061Closed

    Interior alterations to offices on the 14th and 15th floors (Units 1400 and 1501) - Information Privacy Commision

    Jul 25, 2016 · 2 BLOOR ST E
  • Building permit16 185496Closed

    interior fit up to new retail store - Green Press on Hudson's Bay Centre Concourse Level

    Jul 21, 2016 · 2 BLOOR ST E
  • Building permit16 151403Closed

    Proposal to install 1 maglock on the 29th floor of existing office.

    Jun 8, 2016 · 2 BLOOR ST E
  • Building permit16 152157Closed

    Proposal for interior alterations to Unit #R05, "Avis Car Rental"

    Jun 1, 2016 · 2 BLOOR ST E
  • Building permit16 156091Closed

    interior alterations to office "Kingdom of Spain" UNIT 120175' FHC

    May 30, 2016 · 2 BLOOR ST E
  • Building permit16 143340Closed

    Interior demolition; back to base building. Tenant fit-up permit to be applied at a later date.

    May 27, 2016 · 2 BLOOR ST E
  • Building permit16 117006Closed

    REVISION - as per the drawings - To legalize the party wall at the west end of the suite.Proposed interior alteration on the 22 floor office space for Royal Capital.

    May 26, 2016 · 2 BLOOR ST E
  • Zoning review16 150621 LTOClosed
    May 5, 2016 · 2 BLOOR ST E
  • Zoning review16 143817 LTOClosed
    Apr 21, 2016 · 44 BLOOR ST E
  • Building permit16 131179Closed

    interior alterations to retail store "David's Tea" UNIT C52

    Apr 11, 2016 · 2 BLOOR ST E
  • Building permit16 124418Closed

    MInor interior alterations to existng office space on the concourse level. Unit C11. Tenant - "Red Seal Notary".

    Mar 23, 2016 · 2 BLOOR ST E
  • Building permit14 268224Closed

    Revision # 02 - Increase occupant load from 95 persons to 112 persons. Proposal for interior alterations to existing hotel lobby - Marriott Yorkville Convenience address is 90 Bloor St E.

    Mar 15, 2016 · 2 BLOOR ST E
  • Zoning review16 121544 LTOClosed
    Feb 29, 2016 · 80 BLOOR ST E
  • Building permit16 110967Closed

    Proposal for 4 electromagnetic locks on the 29th floor

    Feb 18, 2016 · 2 BLOOR ST E
  • Building permit15 267868Closed

    Proposal for interior alterations to warehouse portion of retail store "Dollarama" in Unit B01

    Feb 16, 2016 · 2 BLOOR ST E
  • Building permit16 106105Closed

    Proposal for interior alterations to an existing "Hertz" kiosk on the ground floor in the Hudson's Bay Centre - Unit #R06

    Feb 3, 2016 · 2 BLOOR ST E
  • Building permit15 260057Closed

    Proposal for interior alterations to an existing kiosk on the ground floor of the Hudson's Bay Centre - Unit C-17, "Fit for Life".

    Dec 18, 2015 · 2 BLOOR ST E
  • Zoning review15 253399 LPRClosed
    Nov 18, 2015 · 2 BLOOR ST E
  • Building permit15 242904Closed

    Proposal for interior alterations to existing office space on the 29th floor.

    Nov 12, 2015 · 2 BLOOR ST E
  • Building permit15 231581Permit Issued

    Proposal for underground parking garage repairs in existing multiple unit building.

    Oct 19, 2015 · 2 BLOOR ST E

Showing the latest 200 of 633 records.

Check before you build

  • Site-specific exception 900.11.10(1380)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(1380)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Despite regulation 40.10.20.100 (2), a Nightclub is not a permitted use.

  2. Older by-law A

    Section 12(2) 132 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
6,499 m²
Frontage
75.7 m
Depth
99 m
Street
Bloor St E
Corner lot
No
Public lane
None
House footprint
1,743 m²
Back yard
0 mhouse to rear lot line
Side yards
0.8 m and 14.3 mhouse to side lot lines
Buildings on the lot
20house, garage, sheds
Max height
61 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 211, 225. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Bloor Street East. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 6.0 (c4.5; r6.0) SS1 (x1380) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 8 City trees in front of this lot. The City's street tree inventory lists 8 trees at this address: elm (14 cm), elm (14 cm), elm (12 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
93%27 of 29 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
41

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 29 variance decisions: more than at 62% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to 495 units, increasing the total gross floor area, and reducing the total amenity space. This application is subject to a Site Plan Control application, which has not yet been submitted by the applicant.

    235 BLOOR ST E · Nov 4, 2026 · 346 m away
  • Minor varianceApproved

    To alter the development standards for the mixed-use development (approved a northern building height of 35-storeys (124.5 m) under Site Specific Zoning By-law 302-2023), and increased to 39-storeys (135.5 m as approved under Minor Variance Decision A0018/24TEY), by further increasing the northern building height to 44-storeys (142.75 m, excluding the mechanical penthouse) inclusive of an 11-storey podium base building (38.65 m), increasing the maximum gross floor area, residential gross floor area, and reducing the outdoor amenity spaces. Also, the existing 10-storey office building (located at the southern limits of this subject site) will be maintained and unaltered. There will be a total of 329 residential dwelling units on this lot.

    1235 BAY ST · Oct 14, 2026 · 360 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-Law 697-2021(OLT), for a new 50-storey mixed-use building (as approved under Committee of Adjustment Files A0612/23TEY and A0231/25TEY), by increasing the maximum total gross floor area, maximum building height (60.2 m to 61.25 m at the east side portion of the building), altering the minimum building setbacks, and reducing the required bicycle parking spaces. There will be a total of 267 residential dwelling units on this lot.

    874 YONGE ST · Aug 5, 2026 · 267 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1050-2015) for the 68-storey mixed-use building (north-east Tower) by increasing the building height from 215 m to 218.6 m (including the height of the mechanical penthouse). Also, to reduce the total number of commercial parking spaces (managed by the Toronto Parking Authority) from 800 to 795 within Parking Levels 1 to 6 (with five parking spaces located on the south-east portion of Parking Level 6 being converted into car wash bays). The existing 196 residential parking spaces on Parking Levels 3 and 4 will be maintained and unaltered.

    27-29 YORKVILLE AVE · Jul 15, 2026 · 294 m away
  • Minor varianceApproved

    To alter the development standards for the 50-storey residential building (approved under Site Specific Zoning By-Law 697-2021(OLT)), by increasing the permitted gross floor area, and the permitted encroachment of cladding and other similar façade treatments into the required minimum building setbacks.

    874 YONGE ST · May 28, 2025 · 267 m away

Latest activity nearby

  • Zoning review

    Application Acceptable

    12 CUMBERLAND ST · Nov 24, 2026 · 224 m away
  • Building permit

    Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies.

    40 ASQUITH AVE · Nov 20, 2026 · 87 m away
  • Building permit

    6 overhanging structure signs**AEVUM**

    11 YORKVILLE AVE · Nov 19, 2026 · 252 m away
  • Building permit

    Proposed interior alterations to an existing office

    2 BLOOR ST E · Nov 18, 2026 · 54 m away
  • Building permit

    Proposal for interior alterations to an existing office.

    2 BLOOR ST E · Nov 17, 2026 · 54 m away
  • Zoning review

    Not Started

    12 CUMBERLAND ST · Nov 12, 2026 · 224 m away
  • Building permit

    Proposal for interior alterations to an existing office space

    121 BLOOR ST E · Nov 10, 2026 · 124 m away
  • Building permit

    Proposal to install one (1) maglock.

    717 CHURCH ST · Nov 6, 2026 · 140 m away
  • Building permit

    Proposal to convert the second floor of Da.Si.Mar Shawarma into a coffee shop with a maximum seating capacity of 30 people

    673 YONGE ST · Nov 5, 2026 · 291 m away
  • Building permit

    2 OVERHANGING STRUCTURE SIGNS + 1 WALL SIGN**SWEAT AND TONIC**

    11 YORKVILLE AVE · Nov 3, 2026 · 252 m away

Neighbourhood: Rosedale-Moore Park

About the area around the lot, not the lot itself.

Nearest station
Yonge Station2 min walk
Nearest TTC stop
Bloor Station - Northbound Platform1 min walk
Nearest cycling route
Bloor St ECycle Track, 1 min walk
Nearest traffic count
10,165 vehicles in 8 hBloor St E / Park Rd, 90 m away, Apr 11, 2017
Serious collisions within 500 m
102021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 3 with cyclists
Parks
Asquith Green Park1 min walk
Milner Parkette3 min walk
Harold Town Park3 min walk

Schools within 1 km

  • HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 3 min walk
  • MCDONALD INTERNATIONAL ACADEMY SCHOOL Private 7 min walk
  • THE ABELARD CENTRE FOR EDUCATION Private 9 min walk
  • JESSE KETCHUM JR & SR PUBLIC SCHOOL English Public 10 min walk
  • BRANKSOME HALL GIRLS SCHOOL Private 10 min walk
  • ROSEDALE DAY SCHOOL Private 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRosedale-Moore ParkMedian neighbourhood
Median household income (2020)$122,000$84,500
Households that own their home58%54%
Population (2021)20,08016,813
Homes built in 1960 or before46%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRosedale-Moore ParkCity median
Assault1080.4636.3
Robbery86.869.5
Auto theft199.6192.6
Theft over $5,00065.146.1
Break and enter455.6172.8
Theft from vehicles182.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.