HousePrecheckCheck an address

2 Augustus TerToronto · zoning, lot size and permit records

Also 10 Augustus Ter, 118 Thomas Fisher Dr, 120 Thomas Fisher Dr, 122 Thomas Fisher Dr, 124 Thomas Fisher Dr and 20 more

57.2 × 84.2 m4,749 m²on Edward Horton Crescorner, also on Augustus Ter

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.5 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 2 development applications open within 300 m, up to 10 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
57.2 m frontage84.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 10 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,749 m²
Frontage
57.2 m
Depth
84.2 m
Street
Edward Horton Cres
Corner lot
Yes, also on Augustus Ter84.2 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: linden, littleleaf glenleven (4 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
4

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage.

    5 KINGSCROSS SQ · Jul 16, 2026 · 311 m away
  • Minor varianceApproved

    To contrsuct a second storey addition above the existing dwelling, a two-storey south side addition and a new covered rear yard deck.

    11 STOCKBRIDGE AVE · Jul 16, 2026 · 405 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage.

    134 LOTHIAN AVE · Jan 23, 2025 · 475 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage.

    142 LOTHIAN AVE · Aug 31, 2023 · 444 m away
  • Minor varianceApproved

    To construct a two-storey east side addition that will include an attached garage, a two-storey rear addition, a second storey addition above the existing dwelling, a new front porch and a rear yard deck.

    3 VELMA DR · Jun 22, 2023 · 255 m away

Latest activity nearby

  • Building permit

    Proposal for interior alterations for an upper floor mezzaine with associated plumbing and mechanical

    195 NORSEMAN ST · Nov 13, 2026 · 116 m away
  • Zoning review

    Cancelled

    1072 ISLINGTON AVE · Nov 3, 2026 · 295 m away
  • Zoning review

    Closed

    1072 ISLINGTON AVE · Nov 3, 2026 · 295 m away
  • Zoning review

    Closed

    1072 ISLINGTON AVE · Nov 3, 2026 · 295 m away
  • Building permit

    Proposed interior alterations to add full second floor from existing mezzanine platform, and add new office space + MEP

    195 NORSEMAN ST · Oct 19, 2026 · 116 m away
  • Building permit

    Installation of a 57.0 kW DC / 60.0 kW AC rooftop solar photovoltaic system: 100 ballasted PV modules on non-penetrating racking (no roof penetrations), rooftop inverter and associated electrical equipment, connected behind the existing main switchboard. Non-export (load displacement) system.

    40 TITAN RD · Sep 25, 2026 · 211 m away
  • Building permitsecondary suite

    Proposal for second unit and basement walkout.

    32 ELFORD BLVD · Jun 17, 2026 · 296 m away
  • Building permit

    Plumbing - The scope of work is limited to Interior Alterations of existing vacant unit (Group F Division 2, Industrial occupancy):- New opening to combine mezzanine level (Units 10 and 12),- Demolition of one existing stair to the mezzanine level and the column under the stairs (Unit 12),- Enclosure/restoration of the slab, - Demolition of existing water closet in Unit 12,- Installation of new water closets (Universal WC, Powder Room, Single-Use Gender-Neutral water closet, Single-Use Gender-Neutral water closet with Shower.Proposed Occupant Load based on the number of proposed water closets is 48 people. OBC Div. B, Article 3.7.4.9., Table 3.7.4.9.No changes to the existing industrial occupancy proposed under this permit. Any future change of use would require a separate application or revisions.

    30 TITAN RD · Apr 1, 2026 · 170 m away
  • Building permit

    replacement of firemain

    197 NORSEMAN ST · Mar 31, 2026 · 219 m away
  • Building permit

    Revision 1: Proposal to revise a portion of the partitioning configuration.Proposed interior alterations through construction of interior partitioning and 20 windows

    40 TITAN RD · Feb 2, 2026 · 211 m away

Neighbourhood: Etobicoke City Centre

About the area around the lot, not the lot itself.

Nearest station
Kipling Station21 min walk
Nearest TTC stop
Islington Ave at Norseman St4 min walk
Nearest traffic count
24,227 vehicles in 8 hIslington Ave / Norseman St, 230 m away, May 22, 2019
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Norseman Heights Park6 min walk
Chauncey - Islington Parkette9 min walk
Fairfield Park10 min walk

Schools within 1 km

  • NORSEMAN JR MDL SCHOOL English Public 7 min walk
  • HOLY ANGELS CATHOLIC ELEMENTARY English Separate 9 min walk
  • CASTLEBAR JR SCHOOL English Public 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEtobicoke City CentreMedian neighbourhood
Median household income (2020)$83,000$84,500
Households that own their home50%54%
Population (2021)23,60016,813
Homes built in 1960 or before9%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEtobicoke City CentreCity median
Assault844.4636.3
Robbery187.769.5
Shootings16.210.5
Auto theft601.8192.6
Theft over $5,000200.646.1
Break and enter210.3172.8
Theft from vehicles278.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.