Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Work or applications in progress
Good to knowRecent records on this lot: 24 241595 (Requesting a stand alone building permit for installation of a caisson wall in order to..., 2024); 26 191872 WET 03 OZ (Proposal includes 5 mixed-use towers, ranging in heights of 34-54 storeys with 2,631 re..., 2026); 24 175201 WET 03 SA (Proposed mixed-use building containing 1,058 units, 23-storey and 27-storey towers atop..., 2024); and 2 more.
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications2 Committee of Adjustment files on this lot
Good to know0 approved. A0305/23EYK (To construct a 27 and 23-storey mixed use building, connected by a shared 4 to 8-storey..., 2023); SYS 5255232 (2023).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)11 development applications open within 300 m
Good to know11 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 54 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
16 records on file: more than at 100% of Toronto houses (median 0).
- Zoning review26 191872 POZClosedAug 6, 2026 · 2 AUDLEY ST
- By-law investigation26 203602 GRA 00 IRClosed
Graffiti
Jul 17, 2026 · 2 AUDLEY ST - Development application26 191872 WET 03 OZUnder Review
Proposal includes 5 mixed-use towers, ranging in heights of 34-54 storeys with 2,631 residential rental units and 415 vehicular parking spaces within a two-level below-grade parking structure. The proposal also conveys 5,499 square metres of City-owned land for a new public road.
Jun 26, 2026 · 2 AUDLEY ST · City file - Building permit24 241595Under Review
Requesting a stand alone building permit for installation of a caisson wall in order to complete remediation and restoration works on site
Nov 21, 2024 · 2 AUDLEY ST - Zoning review24 175201 PSPClosedJul 11, 2024 · 2 AUDLEY ST
- Development application24 175201 WET 03 SAUnder Review
Proposed mixed-use building containing 1,058 units, 23-storey and 27-storey towers atop a nine-storey base building.
Jul 5, 2024 · 29 PORTLAND ST · City file - Development application24 174546 WET 03 SAUnder Review
Proposed 40-storey, 123 metre, mixed-use building containing 413 residential units.
Jul 4, 2024 · 2 AUDLEY ST · City file - Development application23 218428 WET 03 PLClosed
Rogers Communications Inc. is proposing to build a 35m Self-Support TelecommunicationTower on at 2 Audley St. This tower will replace the tower at 1 Audley St that is beingdecommissioned due to the Mimico residential development. Once the building north of theproposed tower is built, an antenna system will be installed while the proposed tower will bedecommissioned.
Oct 25, 2023 · 2 AUDLEY ST · City file
Show 8 older records
- Minor varianceA0305/23EYKDeferred
To construct a 27 and 23-storey mixed use building, connected by a shared 4 to 8-storey podium.
Jul 27, 2023 · 2 AUDLEY ST - Minor varianceSYS 5255232PendingApr 17, 2023 · 2 AUDLEY ST
- Building permit22 143203Closed
To demolish existing building for future development (SA 22-139547)
Jul 14, 2022 · 2 AUDLEY ST - Zoning review22 139547 PSPClosedJul 4, 2022 · 2 AUDLEY ST
- Development application21 172862 WET 03 SBUnder Review
Draft Plan of Subdivision in order to establish two mixed use development blocks (Blocks 1 and 2), two park blocks (Block 3 and 4) and a road widening (Block 5) for the extension of Newcastle Street.
Jun 18, 2021 · 29 PORTLAND ST · City file - Development application16 168925 WET 06 OZClosed
This application proposes to amend the Official Plan and Zoning By-laws to permit a phased multi-block mixed use development consisting of five residential apartment buildings having a total of 123,653 m2 of gross floor area, of which 952 m2 would be for non-residential uses. The proposed buildings would range in height from 6 to 8-storeys along Portland Street; 12-storeys located internal to the subject site, along Audley Street and along the southern property line; and have tall buildings with heights of 16, 23, 25 and 32-storeys oriented towards the southern portion of the lands. The development would contain approximately 1,824 residential units and a total of 1,049 vehicular parking spaces and 1,278 bicycle parking spaces. NOTE: The first submission was deemed incomplete on June 30, 2016. This second submission is an attempt to complete the first submission. Please note the new STAR Circulation Response date for this circulation package.
Jun 6, 2016 · 29 PORTLAND ST · City file - Zoning review12 260413 LPRClosedOct 10, 2012 · 2 AUDLEY ST
- Zoning review08 164130 ZPUClosedMay 30, 2008 · 2 AUDLEY ST
Lot facts
- Area
- 8,643 m²
- Frontage
- 93.9 mestimated, irregular lot
- Depth
- 200.7 mestimated, irregular lot
- Street
- Portland St
- Corner lot
- Yes, also on Audley St200.7 m along it
- Public lane
- None
- House footprint
- 3,580 m²roof up to 19.4 m
- Back yard
- 3.7 mhouse to rear lot line
- Side yards
- 6.7 m and 19.1 mhouse to side lot lines
- Buildings on the lot
- 3house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Site and Area Specific Policy 433, 862. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: Mimico. The lot is inside the Mimico Major Transit Station Area approved by the Province (Site and Area Specific Policy 692). Source
- Mimico-Judson Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Zone UT (Utility and Transportation). Chapter 100, section 100.10 of the by-law. Source
Around this lot
- Minor variances approved
- 96%27 of 28 decisions
- Garden suite permits
- 7
- Laneway suite permits
- 0
- Multiplex permits
- 8
- Development applications
- 17
Within 300 m, last 10 years. 15 suite and multiplex permits: more than at 83% of Toronto houses (median 3). 28 variance decisions: more than at 60% of Toronto houses (median 19).
Latest activity nearby
- Minor variancePending
To construct a new 14-storey affordable rental building with co-op units that will contain a total of 183 rental dwelling units. The development will be located within Block B on the property municipally known as 18 Buckingham Street.
18 BUCKINGHAM ST · Dec 3, 2026 · 247 m away - Building permit
Proposed interior alterations to allow a four plex residential ,underpin existing footings and new basement walkout, new porch
25 MILTON ST · Oct 27, 2026 · 216 m away - Building permit
Installation of Main Drain Pipe Backwater Valve
173 MELROSE ST · Sep 16, 2026 · 200 m away - Building permit
Revision No.1: Revision to the current permit to incorporate relocated wall and increased building GFA.Proposed new single family home with related ancillary buildings. Demolition of current house.
43 VICTOR AVE · Sep 9, 2026 · 289 m away - Zoning review
Cancelled
89 ALBERT AVE · Aug 21, 2026 · 185 m away - Zoning review
Closed
8 NEWCASTLE ST · Aug 18, 2026 · 150 m away - Building permit
Proposed construction of a four unit multiplex and a new garden suite on a vacant lot.
12 CAVELL AVE · Aug 17, 2026 · 139 m away - Building permit
Proposed construction of a four unit multiplex and a new garden suite on a vacant lot.
10 CAVELL AVE · Aug 17, 2026 · 143 m away - Zoning review
Closed
2 AUDLEY ST · Aug 6, 2026 · 45 m away - Building permit
Proposal for a secondary storey rear addition, 2 storey side addition and interior alterations
181 MELROSE ST · Jul 6, 2026 · 216 m away
Neighbourhood: Mimico-Queensway
About the area around the lot, not the lot itself.
- Nearest station
- Mimico GO Station8 min walk
- Nearest TTC stop
- Portland St at Milton St West Side2 min walk
- Nearest cycling route
- Royal York RdBike Lane, 8 min walk
- Nearest traffic count
- 548 vehicles in 8 hCavell Ave / Burlington St, 190 m away, Dec 15, 2021
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- Manchester Park1 min walk
- Grand Avenue Park4 min walk
- Queens Avenue Parkette5 min walk
Schools within 1 km
- DAVID HORNELL JR SCHOOL English Public 6 min walk
- GEORGE R GAULD JR SCHOOL English Public 7 min walk
- OAK LEARNERS Private 8 min walk
- ST LEO CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
- LAKESHORE LINC CENTRE English Separate 11 min walk
- PHOENIX MONTESSORI SCHOOL Private 12 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Mimico-Queensway | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $84,000 | $84,500 |
| Households that own their home | 53% | 54% |
| Population (2021) | 17,045 | 16,813 |
| Homes built in 1960 or before | 43% | 29% |
| Homes needing major repairs | 7% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Mimico-Queensway | City median |
|---|---|---|
| Assault | 4209.2 | 636.3 |
| Robbery | 41.5 | 69.5 |
| Homicide | 4.2 | 5.3 |
| Auto theft | 224.2 | 192.6 |
| Theft over $5,000 | 66.4 | 46.1 |
| Break and enter | 132.8 | 172.8 |
| Theft from vehicles | 99.6 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.