HousePrecheckCheck an address

1B Eireann QuayToronto · zoning, lot size and permit records

≈ 187.8 × 88.3 m1,028 m²on Eireann Quay

Not a home

Bathurst Quay Waters Edge

The City of Toronto's real estate inventory lists Bathurst Quay Waters Edge here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • City of Toronto landThe City decides what happens here; ask it about any plans.
  • 4 development applications open within 300 m, up to 2 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.
N50 m
≈ 187.8 m frontage≈ 88.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Natural Heritage System (62% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,028 m²
Frontage
187.8 mestimated, irregular lot
Depth
88.3 mestimated, irregular lot
Street
Eireann Quay
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    5

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To amend the Maps in Site Specific Zoning By-law 596-2022.

      545 LAKE SHORE BLVD W · May 31, 2023 · 258 m away
    • Minor varianceApproved

      To amend the mixed-used development approved by Site Specific Zoning By-laws 1366-2015, 1101-2017 and 160-2018 containing a total of 886 residential dwelling units, by revising the dwelling unit mix and reducing the required number of parking spaces.

      500 LAKE SHORE BLVD W · Oct 8, 2020 · 362 m away
    • Minor varianceApproved

      To permit a gym (commercial school use) on the ground floor of an existing 35-storey condominium building.

      600 FLEET ST · Jan 23, 2019 · 370 m away
    • Minor varianceApproved

      To permit 90 parking spaces at 85 Queens Wharf Road (Block 33) to be used by occupants of the subject building, or by occupants of the buildings at 500 Lake Shore Boulevard West (Block 8), and 56-90 Queens Wharf Road (Block 37).

      85 QUEENS WHARF RD · Mar 28, 2018 · 458 m away
    • Minor varianceApproved

      To permit up to 100 unsold parking spaces in the parking garage on Block 37 to be used by off-site users. To provide 273 parking spaces for 625 dwelling units. To increase the permitted non-residential gross floor area by 207.0 m2. Note: There is a concurrent Site Plan Application, Block 37 (12 210557 STE 20 SA) for three mixed use towers (8, 18, 30 Floors) with 625 dwelling units, including retail and commercial uses.

      2 HOUSEY ST · Sep 9, 2015 · 429 m away

    Latest activity nearby

    • Building permit

      Proposal to construct new accessibility ramps to the existing school.

      635 QUEENS QUAY W · Nov 25, 2026 · 104 m away
    • Zoning review

      Application On Hold

      5 EIREANN QUAY · Nov 23, 2026 · 69 m away
    • Building permit

      1 Ground Sign******Corleck ******

      5 EIREANN QUAY · Nov 20, 2026 · 69 m away
    • Building permit

      To erect and display 4 Wall Signs on the North elevation, first storey, all signs display static copy and are NON-illuminated with the following dimensions:Sign 1 0.61m L x 0.64m W x 0.01m D x 4.27m H above Grade, North elevation, Sign Face area of 0.39 square metresSign 2 0.28m L x 0.49m W x 0.01m D x 2.83m H above Grade, North elevation, Sign Face area of 0.49 square metres Sign 3 0.13m L x 0.17m W x 0.02m D x 0.76m H above Grade, North elevation, Sign face area of 0.17 square metres Sign 4 0.13m L x 0.17m W x 0.02m D x 0.76m H above Grade, North elevation, Sign face area of 0.17 square metres ***CORLECK***

      5 EIREANN QUAY · Nov 4, 2026 · 69 m away
    • Zoning review

      Closed

      545 LAKE SHORE BLVD W · Sep 22, 2026 · 258 m away
    • Zoning review

      Closed

      545 LAKE SHORE BLVD W · Sep 3, 2026 · 258 m away
    • Building permit

      Construct temporary structures for (projector booth)Setup: July 24, 2026-Jan 25, 2027

      539 QUEENS QUAY W · Jul 29, 2026 · 113 m away
    • Building permit

      Repair the damaged exterior wall.

      627 QUEENS QUAY W · Jul 28, 2026 · 141 m away
    • Building permit

      Construct temporary structures for FIFA - (projector booth)Setup: June 2, 2026; Tear down: July 23, 2026

      539 QUEENS QUAY W · Jun 1, 2026 · 113 m away
    • Zoning review

      Closed

      545 LAKE SHORE BLVD W · May 19, 2026 · 258 m away

    Neighbourhood: Harbourfront-CityPlace

    About the area around the lot, not the lot itself.

    Nearest station
    St. Andrew Station26 min walk
    Nearest TTC stop
    Queens Quay West at Bathurst St East Side Billy Bishop Airport3 min walk
    Nearest cycling route
    Martin Goodman / Waterfront TrlMulti-Use Trail - Boulevard, 2 min walk
    Nearest traffic count
    4,457 vehicles in 8 hQueens Quay W / Dan Leckie Way, 170 m away, Nov 16, 2022
    Serious collisions within 500 m
    42021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
    Parks
    Bathurst Quay1 min walk
    Bathurst Quay Common1 min walk
    Ireland Park1 min walk

    Schools within 1 km

    • THE WATERFRONT SCHOOL English Public 2 min walk
    • CITY SCHOOL English Public 2 min walk
    • BISHOP MACDONELL CATHOLIC ELEMENTARY English Separate 8 min walk
    • JEAN LUMB PUBLIC SCHOOL English Public 8 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureHarbourfront-CityPlaceMedian neighbourhood
    Median household income (2020)$90,000$84,500
    Households that own their home40%54%
    Population (2021)28,13516,813
    Homes built in 1960 or before0%29%
    Homes needing major repairs2%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleHarbourfront-CityPlaceCity median
    Assault883.3636.3
    Robbery48.169.5
    Homicide2.85.3
    Shootings8.510.5
    Auto theft56.6192.6
    Theft over $5,00056.646.1
    Break and enter141.6172.8
    Theft from vehicles121.7188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.