HousePrecheckCheck an address

199 Roehampton AveToronto · zoning, lot size and permit records

Residential · R (d2.0) (x912)68.3 × 59.4 m4,048 m²on Roehampton Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 12 storeys, 125 rental units, built 1963More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 28 development applications open within 300 m, up to 70 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • City upkeep score: 97 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Mount PleasantThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
68.3 m frontage59.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Cultural Heritage Evaluation Report required

    Needs a closer look

    This property is listed under Official Plan Amendment 720: a heritage evaluation is needed before redevelopment.

    What it means. Plans to tear down or rebuild will need a heritage evaluation first.

    How to confirm. Heritage Planning at the City confirms the status. Details

    Official Plan Amendment 720
  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 173911 000 00 IR (Adequate Heat, 2026); 26 173910 000 00 IR (Property Standards, 2026); 25 195082 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 28 development applications open within 300 m

    Good to know

    28 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 70 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 97 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (12 storeys, 125 units, built 1963).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • By-law investigation26 173911 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 199 ROEHAMPTON AVE
  • By-law investigation26 173910 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 199 ROEHAMPTON AVE
  • By-law investigation25 195082 PRS 00 IRClosed

    Property Standards

    Jul 16, 2025 · 199 ROEHAMPTON AVE
  • Building permit20 171751Closed

    garage ramp repair

    Oct 1, 2020 · 199 ROEHAMPTON AVE
  • Building permit18 152233Closed

    Proposal for garage foundation wall rehabilitation.

    May 15, 2018 · 199 ROEHAMPTON AVE
  • Building permit17 167083Closed

    Proposed localized concrete repair to the parking garage structure of the existing apartment building.

    Jun 13, 2017 · 199 ROEHAMPTON AVE
  • Building permit02 176628Closed

    Replace all balcony railing and guards on all balconies.

    Oct 21, 2002 · 199 ROEHAMPTON AVE

Check before you build

  • Site-specific exception 900.2.10(912)

    Needs a closer look

    1 site-specific rule and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(912)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Any addition or extension above the first storey of a lawfully existing detached house must comply with the minimum building setbacks required by this By-law. [TO: 438-86; 12 (2) 193]

  2. Older by-law A

    Section 12(2) 118 of former City of Toronto By-law 438-86

  3. Older by-law B

    Section 12(2) 119 of former City of Toronto By-law 438-86

4 parts for other addresses
  • C On 107 Broadway Avenue, City of Toronto By-law 165-69
  • D On 15 Erskine Avenue, former City of Toronto by-law 195-67
  • E On or between the odd numbered addresses of 133-141 Erskine Avenue, the odd numbered addresses of 165-171 Erskine Avenue, former City of Toronto by-law 20904
  • F On the even numbered addresses of 140-144 Redpath Avenue, City of Toronto by-law 49-02.
By-law 569-2013, Chapter 900

Lot facts

Area
4,048 m²
Frontage
68.3 m
Depth
59.4 m
Street
Roehampton Ave
Corner lot
No
Public lane
None
House footprint
892 m²roof up to 41.2 m
Back yard
31.1 mhouse to rear lot line
Side yards
8.7 m and 9.3 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
38 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Mount Pleasant. The lot is inside the Mount Pleasant Major Transit Station Area approved by the Province (Site and Area Specific Policy 680). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone R (d2.0) (x912) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: maple, red (30 cm), maple, norway crimson king (30 cm), maple, sugar (14 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%13 of 13 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
51

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 13 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards for the 50-storey mixed-use building (approved under Site-Specific Zoning By-law 1133-2023) by permitting a non-residential use (eating establishment/take-out eating establishment with an outdoor patio abutting Redpath Avenue) at-grade and increasing the total number of small vehicle parking spaces to 8 parking spaces. This building will contain 599 residential dwelling units including 15 rental replacement units.

    170 ROEHAMPTON AVE · Apr 1, 2026 · 148 m away
  • Minor varianceApproved

    To alter the development standards (as approved through Site-Specific By-law No. 82-2023(OLT)) for the proposed 43-storey apartment building, to increase the gross floor area, building height, and number of storeys, and to permit encroachments into the required side yard setbacks and encroachments above the maximum building height, as well as to reduce the required amenity space and parking space rates. Please note a previous Minor Variance application (File No. A0163/25NY) for the subject property was before the Committee of Adjustment on June 12, 2025, which was approved on condition.

    241 REDPATH AVE · Feb 19, 2026 · 317 m away
  • Minor varianceApproved

    To construct a new porch and leading staircase in the front yard of an exisiting 2-storey semi-detached dwelling.

    24 ELVINA GDNS · Jan 22, 2026 · 375 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a third-storey addition and a new rear one-storey addition.

    37 FALCON ST · Aug 28, 2025 · 455 m away
  • Minor varianceApproved

    To construct a new two storey semi-detached dwelling with front a porch and a rear deck.

    27 TAUNTON RD · Jun 26, 2025 · 396 m away

Latest activity nearby

  • Building permit

    Interior alternations to existing group D suite

    150 EGLINTON AVE E · Nov 12, 2026 · 195 m away
  • Building permit

    Designing and installing a sprinkler modification system

    110 EGLINTON AVE E · Nov 10, 2026 · 290 m away
  • Building permitsecondary suite

    REVISION-01: ON THE 3RD FLOOR REDUCES THE AREA OF SUITE #302 TO CREATE A SECOND SUITE FOR FUTURE LEASEPROPOSED INTERIOR ALTERATIONS ON 3RD FLOOR FOR OFFICE SUITE FITOUT.

    240 EGLINTON AVE E · Nov 10, 2026 · 90 m away
  • Building permit

    Backflow Device Replacement

    244 EGLINTON AVE E · Nov 5, 2026 · 103 m away
  • Building permit

    Proposal for interior alterations to expand existing laundry room and install a universal washroom.

    130 EGLINTON AVE E · Oct 23, 2026 · 227 m away
  • Building permit

    Wholesale replacement of exterior sealants. Wholesale replacement off vent grills. Localized masonry repairs including brick replacement and mortar joint repointing. Localized concrete balcony slab surface and slab edge repairs. Localized surface repairs at deteriorated EIFS cladding.

    123 EGLINTON AVE E · Oct 21, 2026 · 191 m away
  • Building permit

    Proposal to install two Maglocks - doors P100b and P00b at the level P1.

    170 ROEHAMPTON AVE · Oct 14, 2026 · 148 m away
  • Building permit

    Reconstruction of the existing deck and exterior stairs, including the construction of new reinforced concrete masonry unit (CMU) walls to support the new deck.

    176 EGLINTON AVE E · Oct 9, 2026 · 129 m away
  • Zoning review

    Closed

    120 EGLINTON AVE E · Aug 27, 2026 · 272 m away
  • Building permit

    Localized Garage & Boiler Room Roof Slab Waterproofing Repairs and Swimming Pool Deck Repairs and Waterproofing Installation including targeted concrete repairs and waterproofing replacement.

    100 ROEHAMPTON AVE · Aug 25, 2026 · 264 m away

Neighbourhood: North Toronto

About the area around the lot, not the lot itself.

Nearest station
Mount Pleasant Station2 min walk
Nearest TTC stop
Eglinton Ave East at Redpath Ave2 min walk
Nearest cycling route
Broadway AveSigned Route (No Pavement Markings), 3 min walk
Nearest traffic count
5,054 vehicles in 8 hRedpath Ave / Roehampton Ave, 100 m away, Oct 20, 2005
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 0 with cyclists
Parks
Dawn Redwood Park4 min walk
Broadway Avenue Parkette5 min walk
60 Broadway Ave Park5 min walk

Schools within 1 km

  • EGLINTON JR PUBLIC SCHOOL English Public 2 min walk
  • WILLOWDALE HIGH SCHOOL Private 3 min walk
  • CAREERQUEST Private 3 min walk
  • NORTHERN SECONDARY SCHOOL English Public 4 min walk
  • MANOR MONTESSORI SCHOOL - MT PLEASANT Private 5 min walk
  • TORONTO STEM SCHOOL Private 5 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNorth TorontoMedian neighbourhood
Median household income (2020)$70,000$84,500
Households that own their home19%54%
Population (2021)15,88516,813
Homes built in 1960 or before9%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNorth TorontoCity median
Assault626.8636.3
Robbery53.469.5
Auto theft68192.6
Theft over $5,00024.346.1
Break and enter174.9172.8
Theft from vehicles63.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.