HousePrecheckCheck an address

1972 Queen St EToronto · zoning, lot size and permit records

12.1 × 35.3 m424 m²on Queen St E

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
N20 m
12.1 m frontage35.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • By-law investigation26 111254 ZON 00 IRClosed

    Zoning

    Jan 30, 2026 · 1972 QUEEN ST E
  • By-law investigation26 111181 ZON 00 IRClosed

    Zoning

    Jan 30, 2026 · 1972 QUEEN ST E

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
424 m²
Frontage
12.1 m
Depth
35.3 m
Street
Queen St E
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: elm, accolade (11 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
93%67 of 72 decisions
Garden suite permits
2
Laneway suite permits
0
Multiplex permits
12
Development applications
1

Within 300 m, last 10 years. 14 suite and multiplex permits: more than at 81% of Toronto houses (median 3). 72 variance decisions: more than at 97% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a front covered basement walkout, a front ground floor covered deck with stairs, and a front second storey deck.

    52 HERBERT AVE · Oct 21, 2026 · 357 m away
  • Minor varianceApproved

    To legalize and to maintain the existing rear second-storey addition, which was constructed without an authorized building permit. Also, to alter the existing two-storey townhouse dwelling by constructing a front one-storey addition (verandah enclosure) and a rear ground floor juliette balcony.

    54 KENILWORTH AVE · Oct 21, 2026 · 245 m away
  • Minor varianceApproved

    To legalize and to maintain the existing front ground floor deck with stairs (connected to the existing porch), which was constructed without an authorized building permit, to the existing two-storey detached dwelling.

    18 KEWBEACH AVE · Sep 23, 2026 · 468 m away
  • Minor varianceApproved

    To alter the existing three-storey detached dwelling by replacing the rear one-storey addition with a new three-storey addition, including a ground floor deck and a third storey terrace.

    45 KIPPENDAVIE AVE · Sep 9, 2026 · 335 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition.

    30 NORWAY AVE · Aug 12, 2026 · 468 m away

Latest activity nearby

  • Zoning review

    Closed

    1912 QUEEN ST E · Nov 25, 2026 · 245 m away
  • Building permit

    1 Wall Sign

    1926 QUEEN ST E · Nov 25, 2026 · 196 m away
  • Building permit

    Proposal for a rear second floor addition and enclosing the existing front veranda

    54 KENILWORTH AVE · Nov 24, 2026 · 245 m away
  • Building permit

    Replacement of an existing 1" DCVA backflow prevention valve

    2006 QUEEN ST E · Nov 24, 2026 · 160 m away
  • Building permit

    PROPOSAL TO INSTALL BACKWATER VALVE INSIDE

    51 ELMER AVE · Nov 10, 2026 · 253 m away
  • Building permitsecondary suite

    Proposal to convert existing finished basement into secondary suite.

    90 WAVERLEY RD · Nov 10, 2026 · 111 m away
  • Building permit

    1 wall sign**DOT&BEA**

    1926 QUEEN ST E · Nov 9, 2026 · 196 m away
  • Zoning review

    Closed

    1973 QUEEN ST E · Oct 27, 2026 · 54 m away
  • Minor varianceApproved

    To legalize and to maintain the existing rear second-storey addition, which was constructed without an authorized building permit. Also, to alter the existing two-storey townhouse dwelling by constructing a front one-storey addition (verandah enclosure) and a rear ground floor juliette balcony.

    54 KENILWORTH AVE · Oct 21, 2026 · 245 m away
  • Building permitnew building, new house, secondary suite

    Propose to demolish the existing SFD and to construct a 3 storey 2-unit house with integral garage.

    30 WHEELER AVE · Oct 19, 2026 · 222 m away

Neighbourhood: The Beaches

About the area around the lot, not the lot itself.

Nearest station
Danforth GO Station32 min walk
Nearest TTC stop
Queen St East at Bellefair Ave2 min walk
Nearest cycling route
Lee AveSigned Route (No Pavement Markings), 5 min walk
Nearest traffic count
20,991 vehicles in 8 hQueen St E / Kenilworth Ave (East), 50 m away, Dec 10, 1986
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Kew Gardens2 min walk
Pantry Park3 min walk
Beaches Park6 min walk

Schools within 1 km

  • BOARDWALK MONTESSORI SCHOOL Private 1 min walk
  • KEW BEACH JR PUBLIC SCHOOL English Public 3 min walk
  • GLEN AMES SR PUBLIC SCHOOL English Public 9 min walk
  • WILLIAMSON ROAD JR PUBLIC SCHOOL English Public 10 min walk
  • ACADEMY OF THOUGHT AND INDUSTRY TORONTO Private 11 min walk
  • AVALON CHILDREN'S MONTESSORI SCHOOL Private 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureThe BeachesMedian neighbourhood
Median household income (2020)$116,000$84,500
Households that own their home63%54%
Population (2021)21,51016,813
Homes built in 1960 or before65%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleThe BeachesCity median
Assault525.6636.3
Robbery25.269.5
Auto theft164192.6
Theft over $5,00050.546.1
Break and enter151.4172.8
Theft from vehicles243.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.