HousePrecheckCheck an address

1969 Eglinton Ave WToronto · zoning, lot size and permit records

Commercial residential · CR SS2 (x2629)≈ 57.1 × 45.4 m1,920 m²on Eglinton Ave W

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 36 rental units, built 1963More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 2 development applications open within 300 m, up to 9 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.
  • City upkeep score: 89 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: FairbankThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
≈ 57.1 m frontage≈ 45.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 246465 PRS 00 IR (Property Standards, 2026); 26 172853 000 00 IR (Adequate Heat, 2026); 26 172852 000 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 9 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 89 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (3 storeys, 36 units, built 1963).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • By-law investigation26 246465 PRS 00 IRClosed

    Property Standards

    Sep 29, 2026 · 1969 EGLINTON AVE W
  • By-law investigation26 172853 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 1969 EGLINTON AVE W
  • By-law investigation26 172852 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 1969 EGLINTON AVE W
  • Building permit18 176687Closed

    Proposal to install a backflow prevention device in an existing apartment building.

    Jun 14, 2018 · 1969 EGLINTON AVE W

Check before you build

  • Site-specific exception 900.11.10(2629)

    Needs a closer look

    7 site-specific rules and 7 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2629)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The maximum height of a building or structure is 25.5 metres

  2. Rule B

    Up to a height of 13.5 metres, at least 75% of the main wall of the building facing a lot line abutting Eglinton Avenue must be between 0 metres and 0.5 metres from the front lot line , and all of the main wall of the building facing a lot line abutting Eglinton Avenue must be between 0.0 metres and 5.5 metres from the front lot line

  3. Rule C

    any part of a building located above the point, measured at 13.5 metres above the average elevation of the grade of the lot line abutting Eglinton Avenue, must have a step-back of at least 1.5 metres from the building setback of the highest storey of the building located below that point

  4. Rule D

    The first floor of the building may not be used for residential purposes, other than lobby access

  5. Rule E

    The requirements of (B) above, do not apply to a transportation use

  6. Rule F

    Properties located at 253, 253 ½, 257, 265 Eglinton Avenue West and 187, 189, 191 Highbourne Road must comply with Exception 900.11.10(2).

  7. Rule G

    Despite regulation 40.10.20.40(1), dwelling units are permitted in a mixed-use building . Prevailing By-laws and Prevailing Sections: (A) Properties located at 253, 253 1/2, 257, 265 Eglinton Avenue West and 187, 189, 191 Highbourne Road; (i) Section 12(2) 118 of former City of Toronto By-law 438-86; (ii) Section 12(2) 119 of former City of Toronto By-law 438-86; and (iii) Section 12(2) 270(a) of former City of Toronto By-law 438-86.

  8. Older by-law A

    The maximum height of a building or structure is 25.5 metres

  9. Older by-law B

    Up to a height of 13.5 metres, at least 75% of the main wall of the building facing a lot line abutting Eglinton Avenue must be between 0 metres and 0.5 metres from the front lot line , and all of the main wall of the building facing a lot line abutting Eglinton Avenue must be between 0.0 metres and 5.5 metres from the front lot line

  10. Older by-law C

    any part of a building located above the point, measured at 13.5 metres above the average elevation of the grade of the lot line abutting Eglinton Avenue, must have a step-back of at least 1.5 metres from the building setback of the highest storey of the building located below that point

  11. Older by-law D

    The first floor of the building may not be used for residential purposes, other than lobby access

  12. Older by-law E

    The requirements of (B) above, do not apply to a transportation use

  13. Older by-law F

    Properties located at 253, 253 ½, 257, 265 Eglinton Avenue West and 187, 189, 191 Highbourne Road must comply with Exception 900.11.10(2).

  14. Older by-law G

    Despite regulation 40.10.20.40(1), dwelling units are permitted in a mixed-use building . Prevailing By-laws and Prevailing Sections: (A) Properties located at 253, 253 1/2, 257, 265 Eglinton Avenue West and 187, 189, 191 Highbourne Road; (i) Section 12(2) 118 of former City of Toronto By-law 438-86; (ii) Section 12(2) 119 of former City of Toronto By-law 438-86; and (iii) Section 12(2) 270(a) of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
1,920 m²
Frontage
57.1 mestimated, irregular lot
Depth
45.4 mestimated, irregular lot
Street
Eglinton Ave W
Corner lot
No
Public lane
None
House footprint
903 m²roof up to 16 m
Back yard
7.2 mhouse to rear lot line
Side yards
4.8 m and 7.1 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
24 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Fairbank. The lot is inside the Fairbank Major Transit Station Area approved by the Province (Site and Area Specific Policy 675). Source
  • Zone CR SS2 (x2629) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
95%41 of 43 decisions
Garden suite permits
10
Laneway suite permits
0
Multiplex permits
15
Development applications
5

Within 300 m, last 10 years. 25 suite and multiplex permits: more than at 92% of Toronto houses (median 3). 43 variance decisions: more than at 78% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit an 11-storey mixed use building. The property was the subject of a previous Minor Variance application (File No. A0243/21NY) to permit a 9-storey mixed use building, which was approved on condition.

    1886 EGLINTON AVE W · Aug 20, 2026 · 245 m away
  • Minor varianceApproved

    The development proposal consists of an 8-storey mixed-use residential building with ground floor retail. Variances rquired due to revisions to massing of building, and reduction of u/g parking.

    2116 EGLINTON AVE W · Aug 29, 2024 · 297 m away
  • Minor varianceApproved

    Proposal to construct a two storey rear addition and secondary unit.

    2154 EGLINTON AVE W · Nov 24, 2022 · 448 m away
  • Minor varianceApproved

    To construct a mixed-use building containing 194 units, retail on ground floor and parking.

    1886 EGLINTON AVE W · Jun 17, 2021 · 245 m away
  • Minor varianceApproved

    To construct an addition to front of the exisiting building.

    1 RAMSDEN RD · Jan 16, 2020 · 251 m away

Latest activity nearby

  • Minor variancePending

    To construct a new three-storey detached residential building (houseplex) with a front entrance canopy, a rear exterior access staircase (fire escape leading to each level), and a rear basement walkout with a terrace and platform lift. Also, to construct a new two-storey ancillary building (containing one garden suite) in the rear yard. There will be a total of five residential dwelling units on this lot (four units within the main building, and one unit occupying the ancillary building).

    217 ENNERDALE RD · Dec 9, 2026 · 127 m away
  • Building permitmultiplex, secondary suite

    REVISION 01: New bedroom and relocation of bathroom.Proposal for triplex conversion and interior alterations. - UPDATED TO DUPLEX IN REVISION 1

    61 BRANSTONE RD · Nov 9, 2026 · 194 m away
  • Zoning review

    Notice Sent

    55 BOWIE AVE · Nov 6, 2026 · 264 m away
  • Building permit

    Proposal for underpinning.

    55 BOWIE AVE · Nov 4, 2026 · 264 m away
  • Building permit

    Retaining wall construction.

    485 NAIRN AVE · Oct 8, 2026 · 293 m away
  • Building permitdemolition

    Proposal to demolish the existing dwelling

    41 BRANSTONE RD · Oct 7, 2026 · 262 m away
  • Building permitmultiplex, new building, new house

    Proposal to construct a 3-storey, 6 unit multiplex with front and rear basement walkouts and a front porch

    41 BRANSTONE RD · Oct 7, 2026 · 262 m away
  • Building permitgarden suite

    Proposed garden suite.

    41 BRANSTONE RD · Oct 6, 2026 · 262 m away
  • Building permitgarden suite

    Proposed garden suite.

    41 BRANSTONE RD · Oct 6, 2026 · 262 m away
  • Building permit

    Proposal for adding 3-piece bathroom to be added into existing walk-in closet.

    55 BRANSTONE RD · Oct 2, 2026 · 218 m away

Neighbourhood: Caledonia-Fairbank

About the area around the lot, not the lot itself.

Nearest station
Fairbank Station7 min walk
Nearest TTC stop
Eglinton Ave West at Ennerdale Rd1 min walk
Nearest cycling route
Beltline TrlMulti-Use Trail, 8 min walk
Nearest traffic count
9,802 vehicles in 8 hEglinton Ave W / Ennerdale Rd, 100 m away, Mar 21, 2012
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 0 with cyclists
Parks
Fairbank Memorial Park7 min walk
Kay Gardner Beltline Park8 min walk
Walter Saunders Memorial Park10 min walk

Schools within 1 km

  • FAIRBANK MEMORIAL COMMUNITY SCHOOL English Public 5 min walk
  • FAIRBANK PUBLIC SCHOOL English Public 7 min walk
  • LYCEE FRANCAIS DE TORONTO Private 7 min walk
  • ST JOHN BOSCO CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
  • ST THOMAS AQUINAS CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
  • BALANCED EDUCATION NETWORK B.E.N. SCHOOL Private 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureCaledonia-FairbankMedian neighbourhood
Median household income (2020)$87,000$84,500
Households that own their home63%54%
Population (2021)10,01516,813
Homes built in 1960 or before53%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleCaledonia-FairbankCity median
Assault552.3636.3
Robbery74.969.5
Shootings9.410.5
Auto theft280.8192.6
Theft over $5,00018.746.1
Break and enter121.7172.8
Theft from vehicles159.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.