HousePrecheckCheck an address

1950 Bloor St WToronto · zoning, lot size and permit records

Also 1954 Bloor St W

Residential · R (f12.0; d2.0) (x7)23.8 × 33.0 m782 m²on Bloor St W

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 16 rental units, built 1940More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 2 development applications open within 300 m, up to 30 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
  • City upkeep score: 91 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: High ParkThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
23.8 m frontage33.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Cultural Heritage Evaluation Report required

    Needs a closer look

    This property is listed under Official Plan Amendment 720: a heritage evaluation is needed before redevelopment.

    What it means. Plans to tear down or rebuild will need a heritage evaluation first.

    How to confirm. Heritage Planning at the City confirms the status. Details

    Official Plan Amendment 720
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 171656 000 00 IR (Adequate Heat, 2026); 26 171655 000 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 30 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 91 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (4 storeys, 16 units, built 1940).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • By-law investigation26 233360 SIN 00 IRClosed

    Signs

    Sep 7, 2026 · 1950 BLOOR ST W
  • By-law investigation26 171656 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 1950 BLOOR ST W
  • By-law investigation26 171655 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 1950 BLOOR ST W
  • Building permit20 158838Closed

    Proposal to install a 2" D.C.V.A. back water valve in the existing apartment building.

    Jul 22, 2020 · 1950 BLOOR ST W
  • Building permit09 194933Closed

    To install one backflow prevention device.

    Jan 8, 2010 · 1950 BLOOR ST W

Check before you build

  • Site-specific exception 900.2.10(7)

    Needs a closer look

    4 site-specific rules and 4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(7)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The following uses are permitted if they comply with the specific conditions set out for each use below: Nursing Home ; Retirement Home ; and Religious Residence

  2. Rule B

    A nursing home , retirement home or a combination of these two uses, must occupy the whole of the building and not be combined with any other permitted use, and must: (i) be located in a building that was originally constructed and used as a detached house , a semi-detached house , or a townhouse ; or (ii) be on a lot that has a front lot line or side lot line abutting: (a) a major street on the Policy Areas Overlay Map; or (b) a street that intersects a major street on the Policy Areas Overlay Map, and the lot is located, in whole or in part, within a distance of 80 metres from that intersection

  3. Rule C

    A religious residence , unless it is in the same building as a place of worship , must occupy the whole of the building and not be combined with any other permitted use, and must: (i) be located in a building that was originally constructed and used as a detached house , a semi-detached house , or a townhouse ; or (ii) be on a lot that has a front lot line or side lot line abutting: (a) a major street on the Policy Areas Overlay Map; or

  4. Rule D

    Despite regulation 10.10.20.100(3), a community centre or a library is not required to be operated by or on the behalf of the City of Toronto. Prevailing By-laws and Prevailing Sections: (A) On 146 and 160 Wellesley Street East City of Toronto by-law 468-2004. (B) On 251A-255 Christie Street and 38-42C Yarmouth Road, City of Toronto by-law 1027-2012.

  5. Older by-law A

    The following uses are permitted if they comply with the specific conditions set out for each use below: Nursing Home ; Retirement Home ; and Religious Residence

  6. Older by-law B

    A nursing home , retirement home or a combination of these two uses, must occupy the whole of the building and not be combined with any other permitted use, and must: (i) be located in a building that was originally constructed and used as a detached house , a semi-detached house , or a townhouse ; or (ii) be on a lot that has a front lot line or side lot line abutting: (a) a major street on the Policy Areas Overlay Map; or (b) a street that intersects a major street on the Policy Areas Overlay Map, and the lot is located, in whole or in part, within a distance of 80 metres from that intersection

  7. Older by-law C

    A religious residence , unless it is in the same building as a place of worship , must occupy the whole of the building and not be combined with any other permitted use, and must: (i) be located in a building that was originally constructed and used as a detached house , a semi-detached house , or a townhouse ; or (ii) be on a lot that has a front lot line or side lot line abutting: (a) a major street on the Policy Areas Overlay Map; or

  8. Older by-law D

    Despite regulation 10.10.20.100(3), a community centre or a library is not required to be operated by or on the behalf of the City of Toronto. Prevailing By-laws and Prevailing Sections: (A) On 146 and 160 Wellesley Street East City of Toronto by-law 468-2004. (B) On 251A-255 Christie Street and 38-42C Yarmouth Road, City of Toronto by-law 1027-2012.

By-law 569-2013, Chapter 900

Lot facts

Area
782 m²
Frontage
23.8 m
Depth
33 m
Street
Bloor St W
Corner lot
No
Public lane
None
House footprint
497 m²roof up to 18.9 m
Back yard
6.5 mhouse to rear lot line
Side yards
0.4 m and 1.6 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
23 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: High Park. The lot is inside the High Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 652). Source
  • Minimum frontage 12 m. Frontage is about 23.8 m: meets the zone minimum. Source
  • Zone R (f12.0; d2.0) (x7) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
100%15 of 15 decisions
Garden suite permits
2
Laneway suite permits
0
Multiplex permits
3
Development applications
6

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To construct a new four-storey detached dwelling (houseplex with the basement level considered the first storey) with an integral garage, a front porch with stairs, front and rear first storey walkouts, a rear second storey deck with stairs, and front and rear fourth storey rooftop terraces (on the roof of the third storey). There will be a total of two dwelling units on this lot.

    61 PINE CREST RD · Aug 12, 2026 · 449 m away
  • Minor varianceRefused

    To construct a new four-storey detached dwelling (houseplex with the basement level considered the first storey) with an integral garage, a front porch with stairs, front and rear first storey walkouts, a rear second storey deck with stairs, and front and rear fourth storey rooftop terraces (on the roof of the third storey). There will be a total of two dwelling units on this lot.

    61 PINE CREST RD · Aug 12, 2026 · 449 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey detached dwelling by constructing a front second and third storey addition, and a rear third storey addition. Also, to construct a rear covered basement walkout extension, and to enlarge the rear ground floor covered deck with stairs, currently under construction with a building permit (No. 26 100682 BLD 00 SR), at the southwest corner of the dwelling.

    140 QUEBEC AVE · Aug 5, 2026 · 365 m away
  • Minor varianceApproved

    To alter the existing three-storey detached dwelling by constructing a rear third storey dormer addition with a rooftop patio (above the existing sunroom addition).

    11 OAKMOUNT RD · Apr 29, 2026 · 450 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey addition with a deck and stairs. The existing secondary suite (located in the basement) will be removed.

    178 QUEBEC AVE · Feb 25, 2026 · 498 m away

Latest activity nearby

  • Building permit

    B1/P1 Level Sanitary Drainage Headers/Stacks Offsets Replacement. The scope of work includes piping replacement within the B1 level as well as a section of pipe within the underground garage.

    50 QUEBEC AVE · Oct 23, 2026 · 132 m away
  • Building permit

    Plumbing - Renovation of the existing condo unit. Reconfiguring kitchen and laundry machine; renovating thebathrooms; transforming a tub into a shower.

    50 QUEBEC AVE · Oct 13, 2026 · 132 m away
  • Zoning review

    Notice Sent

    1990 BLOOR ST W · Oct 2, 2026 · 136 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 107-2015(OMB)), for the existing 11-storey mixed-use building, by permitting clinic and office uses (physician(s) and healthcare practitioner(s)), to be located on a portion of the first level. There is a total of 104 residential dwelling units on this lot.

    1990 BLOOR ST W · Aug 12, 2026 · 136 m away
  • Building permit

    Proposal for interior alterations for center block upgrades

    2100 BLOOR ST W · Jul 7, 2026 · 296 m away
  • Building permitgarden suite

    Revision 02 - revised roof plan to reflect skylightRevision 01 - remove 2 skylights on the roof, remove interior partiton wall, between living arear and enlarge windows, remove side doorProposal to convert the existing detached garage to a garden suite

    62 GOTHIC AVE · Jun 25, 2026 · 218 m away
  • Building permit

    Proposed Extension to Existing Deck

    70 GOTHIC AVE · Jun 10, 2026 · 239 m away
  • Building permit

    REPLACE EXISTING DUAL TEMP SUPPLY AND RETURN RISERS WITH NEW RISERS, EXISTING MAIN HEADERS TO REMAIN.

    50 QUEBEC AVE · Jun 8, 2026 · 132 m away
  • Building permit

    Rear Yard deck

    64 GOTHIC AVE · Jun 4, 2026 · 224 m away
  • Zoning review

    Closed

    1938 BLOOR ST W · May 21, 2026 · 56 m away

Neighbourhood: High Park North

About the area around the lot, not the lot itself.

Nearest station
High Park Station2 min walk
Nearest TTC stop
High Park Station - Eastbound Platform1 min walk
Nearest cycling route
Bloor St WCycle Track, 1 min walk
Nearest traffic count
8,017 vehicles in 8 hBloor St W / Quebec Ave, 50 m away, Feb 2, 2022
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
Parks
Bennett Park1 min walk
High Park1 min walk
Parkview Gardens Parkette2 min walk

Schools within 1 km

  • HUMBERSIDE MONTESSORI SCHOOL Private 11 min walk
  • KEELE ST JR SCHOOL English Public 11 min walk
  • THE STUDENT SCHOOL English Public 11 min walk
  • URSULA FRANKLIN ACADEMY English Public 11 min walk
  • WESTERN TECHNICAL COMMERCIAL SCHOOL English Public 12 min walk
  • HUMBERSIDE COLLEGIATE INSTITUTE English Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHigh Park NorthMedian neighbourhood
Median household income (2020)$83,000$84,500
Households that own their home33%54%
Population (2021)21,85516,813
Homes built in 1960 or before38%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHigh Park NorthCity median
Assault677.9636.3
Robbery43.169.5
Homicide3.95.3
Shootings3.910.5
Auto theft74.5192.6
Theft over $5,00027.446.1
Break and enter133.2172.8
Theft from vehicles152.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.