HousePrecheckCheck an address

1930R Yonge StToronto · zoning, lot size and permit records

Also 1930 Yonge St

UT (x46)2.6 × 11.7 m30 m²on Chaplin Cres

Not a home

Transit, rail or parking land

The zoning by-law sets this parcel aside for utilities and transportation. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Transit, rail or parkingGood access, with trains, buses or cars and some noise.
  • 20 development applications open within 300 m, up to 48 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: DavisvilleThe City plans more homes around the station: good for transit, and more building over time.
N5 m
2.6 m frontage11.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 20 development applications open within 300 m

    Good to know

    20 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Check before you build

  • Site-specific exception 900.50.10(46)

    Needs a closer look

    2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.50.10(46)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    If the lands are in an area with a numerical value following the letters 'HT' shown on the Height Overlay Map, that numerical value is the maximum height for a building or structure , in metres, and the height is measured as the distance between average grade and the elevation of the highest point of the building or structure

  2. Rule B

    Regulation 100.10.20.100(6) (B) does not apply to a vehicle depot that is in association with a public transportation use

  3. Older by-law A

    Section 12(1) 381 of former City of Toronto By-law 438-86

  4. Older by-law B

    Section 12(1) 389 of former City of Toronto By-law 438-86

2 parts for other addresses
  • C On the lands municipally known as 1411 Queen St. E. in 1983, public parking , a vehicle depot for public transit vehicles , and offices are permitted. [TO: …
  • C On 1130 Bathurst St., 6 Booth Ave., 1627 Danforth Ave., 1 Don Valley Parkway N., the even numbered addresses of 350-380 Greenwood Ave., 400 Greenwood Ave., 420 …
By-law 569-2013, Chapter 900

Lot facts

Area
30 m²
Frontage
2.6 m
Depth
11.7 m
Street
Chaplin Cres
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Major Transit Station Area: Davisville. The lot is inside the Davisville Major Transit Station Area approved by the Province (Site and Area Specific Policy 722). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone UT (x46) (Utility and Transportation). Chapter 100, section 100.10 of the by-law. Source

Around this lot

Minor variances approved
100%20 of 20 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
4
Development applications
36

Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 20 variance decisions: more than at 51% of Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Not Started

    3 GLEBE RD E · Nov 24, 2026 · 291 m away
  • Zoning review

    Not Started

    21 IMPERIAL ST · Nov 24, 2026 · 106 m away
  • Zoning review

    Not Started

    1991 YONGE ST · Nov 23, 2026 · 227 m away
  • Zoning review

    Application On Hold

    1849 YONGE ST · Nov 23, 2026 · 220 m away
  • Building permit

    Proposal to construct an one-storey rear yard addition and new deck.See also 26-255451 ZAP 00 ZR

    30 CHAPLIN CRES · Nov 20, 2026 · 93 m away
  • Zoning review

    Closed

    1920 YONGE ST · Oct 29, 2026 · 32 m away
  • Building permit

    INTERIOR ALTERATIONS - DEMISING PARTITION - UNIT 906

    1867 YONGE ST · Oct 29, 2026 · 194 m away
  • Building permit

    Proposal for interior alterations to existing commercial suite into a veterinary clinic.

    2008 YONGE ST · Oct 28, 2026 · 231 m away
  • Building permitdemolition

    Proposed demolition of the existing 5-storey commercial building.

    25 IMPERIAL ST · Oct 23, 2026 · 105 m away
  • Building permitdemolition

    Proposal to demolish the existing 2 storey office building located at 21 IMPERIAL ST only.

    21 IMPERIAL ST · Oct 23, 2026 · 106 m away

Neighbourhood: Yonge-Eglinton

About the area around the lot, not the lot itself.

Nearest station
Davisville Station2 min walk
Nearest TTC stop
Davisville Station - Northbound Platform1 min walk
Nearest cycling route
Yonge StCycle Track, 1 min walk
Nearest traffic count
25,927 vehicles in 14 hYonge St / Davisville Ave / Chaplin Cres, 80 m away, Jun 3, 2025
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
Parks
Fiona Nelson Parkette1 min walk
Oriole Park - Toronto2 min walk
Kay Gardner Beltline Park5 min walk

Schools within 1 km

  • DAVISVILLE & SPECTRUM SCHOOL English Public 4 min walk
  • THE STUDY ACADEMY Private 5 min walk
  • THE STUDY ACADEMY SCHOOL Private 6 min walk
  • THE YORK SCHOOL - JR CAMPUS Private 13 min walk
  • MANOR MONTESSORI - DE SAVERY SITE Private 13 min walk
  • UPPER CANADA COLLEGE SCHOOL Private 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-EglintonMedian neighbourhood
Median household income (2020)$94,000$84,500
Households that own their home37%54%
Population (2021)12,41016,813
Homes built in 1960 or before47%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-EglintonCity median
Assault713.8636.3
Robbery95.269.5
Auto theft115.6192.6
Theft over $5,00010246.1
Break and enter136172.8
Theft from vehicles54.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.