Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Work or applications in progress
Good to knowRecent records on this lot: 25 101956 (addition of fire protection sprinklers in building lobby, 2025); 26 248413 (Proposal to replace existing make-up air unit and associated structural reinforcement work, 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications10 development applications open within 300 m
Good to know10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 60 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
23 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 248413Examiner's Notice Sent
Proposal to replace existing make-up air unit and associated structural reinforcement work.
Oct 2, 2026 · 192 JARVIS ST - Building permit26 238817Cancelled
Proposal to replace existing make-up air unit and associated structural reinforcement work.
Sep 16, 2026 · 192 JARVIS ST - Zoning review25 177995 LPRCancelledJun 16, 2025 · 190 JARVIS ST
- Building permit25 101956Inspection
addition of fire protection sprinklers in building lobby
Feb 7, 2025 · 192 JARVIS ST - Building permit21 113120Cancelled
Construction of a new entrance canopy for an existing mixed-use residential building.
Apr 27, 2021 · 192 JARVIS ST - Zoning review20 204233 LTOClosedOct 8, 2020 · 190 JARVIS ST
- Zoning review20 196502 ZPRClosedSep 21, 2020 · 192 JARVIS ST
- Building permit18 198531Closed
East Parking Garage Roof Deck Renewal, including removing all overburden on roof deck and ramp, including membrane. Provide new membane and new overburden. Scope of work involves removing delaminated concrete, cleaning the steel, and replacing the concrete with new.
Jul 30, 2018 · 192 JARVIS ST
Show 15 older records
- Building permit17 270223Closed
In conjunction with a multi-storey building on the premises, proposal to erect and display one illuminated wall sign, displaying static copy, located on the first storey east elevation. The proposed sign is 0.43 metres vertically by 3.25 metres horizontally at a height of 3.20 metres above grade.** COFFEE WORKS**
Dec 8, 2017 · 190 JARVIS ST - Building permit17 180284Closed
Proposed interior alterations to covert ground floor unit into a Mercantile - Cafe for tenant *Pop Coffee Works*
Jun 29, 2017 · 190 JARVIS ST - Building permit14 259239Closed
Fire alarm control panel replacement.
Jan 14, 2015 · 192 JARVIS ST - Building permit07 274050Closed
Permit for exterior masonry / cladding repair - all elevations
Nov 14, 2007 · 192 JARVIS ST - Building permit05 148671Cancelled
Make interior alterations to office for restaurant.
Jan 25, 2006 · 192 JARVIS ST - Zoning review06 101586 LTOClosedJan 10, 2006 · 192 JARVIS ST
- Building permit05 141239Closed
Make interior alterations to office for restaurant.
Jun 23, 2005 · 192 JARVIS ST - Building permit01 144067Closed
Install telecommunications equipment on the roof.
Aug 15, 2001 · 192 JARVIS ST - Zoning review97 026086 LTOClosedFeb 20, 1997 · 190 JARVIS ST
- Zoning review91 026528 LTOClosedMay 27, 1991 · 190 JARVIS ST
- Zoning review91 026134 LTOClosedFeb 22, 1991 · 190 JARVIS ST
- Zoning review87 030174 LTOClosedJun 5, 1987 · 190 JARVIS ST
- Zoning review84 026186 LTOClosedMar 5, 1984 · 192 JARVIS ST
- Zoning review83 026220 LTOClosedAug 30, 1983 · 192 JARVIS ST
- Zoning review83 026176 LTOClosedAug 17, 1983 · 192 JARVIS ST
Check before you build
Site-specific exception 900.11.10(2517)
Needs a closer look1 site-specific rule and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On the lands, a parking facility is only permitted, if: (i) it is located on the same lot as a residential building , non-residential building , or a mixed use building ; and (ii) it has no more than 125% of the number of parking spaces required to be provided for the building on the lot . [TO: 438-86; 12 (2) 80]
- Older by-law A
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 216 of former City of Toronto By-law 438-86
1 part for other addresses
- C On the even numbered addresses of 186-188 Jarvis St., former City of Toronto by-law 192-93.
Lot facts
- Area
- 1,335 m²
- Frontage
- 31.4 m
- Depth
- 43.8 m
- Street
- Jarvis St
- Corner lot
- No
- Public lane
- Ln S Dundas W Jarvis, 50.4 m along it
- Max height
- —
- Max lot coverage
- —
- Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.0 (c2.0; r4.0) SS1 (x2517) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: elm (13 cm), elm, american (10 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 96%24 of 25 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 15
- Development applications
- 44
Within 300 m, last 10 years. 15 suite and multiplex permits: more than at 83% of Toronto houses (median 3). 25 variance decisions: more than at 57% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 178 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 253 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 111 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 112 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).
241 CHURCH ST · Jul 30, 2025 · 181 m away
Latest activity nearby
- Building permit
Proposal for interior alterations of existing commercial unit to a medical clinic and prescription pharmacy with Level B compounding room.
231 DUNDAS ST E · Nov 19, 2026 · 204 m away - Zoning review
Not Started
134 JARVIS ST · Nov 6, 2026 · 253 m away - Zoning review
Closed
78 MUTUAL ST · Oct 28, 2026 · 93 m away - Zoning review
Not Started
207 JARVIS ST · Oct 21, 2026 · 108 m away - Building permit
Rev 01 - Reducing 200 mm backflow preventor and express main to 150 mmProposal for replacement of existing electric fire pump and associated piping in fire pump room
25 MUTUAL ST · Oct 19, 2026 · 240 m away - Building permit
Proposal for replacement of existing 1-1/2" Watts 375XL reduced pressure (RP) backflow prevention device serving existing high-rise condominium building. Device located in PH mechanical room.
181 DUNDAS ST E · Oct 8, 2026 · 76 m away - Building permit
Proposal to replace existing make-up air unit and associated structural reinforcement work.
192 JARVIS ST · Oct 2, 2026 · 11 m away - Building permit
1 wall sign + 1 projecting sign**ELEMON PILATES**
30 MUTUAL ST · Oct 1, 2026 · 255 m away - Building permit
Balcony Remedial work - Isolated conc. repair and brick masonry repair, Installation of new waterproofing system, Replace existing balcony guardrail with new.Convenience address is 279 Jarvis St
257 JARVIS ST · Sep 25, 2026 · 140 m away - Building permit
1 WALL SIGN + 1 PROJECTING SIGN**ELEMON PILATES**
30 MUTUAL ST · Sep 23, 2026 · 255 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station8 min walk
- Nearest TTC stop
- Dundas St East at Jarvis St1 min walk
- Nearest cycling route
- Shuter StCycle Track, 2 min walk
- Nearest traffic count
- 11,150 vehicles in 8 hDundas St E / Jarvis St, 70 m away, Dec 3, 2022
- Serious collisions within 500 m
- 272021–2026, killed or seriously injured: 3 fatal, 19 with pedestrians, 2 with cyclists
- Parks
- Arena Gardens1 min walk
- 45 Dalhousie St Park3 min walk
- Moss Park3 min walk
Schools within 1 km
- ECOLE ELEMENTAIRE GABRIELLE ROY French Public 3 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 4 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 4 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 4 min walk
- ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 5 min walk
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 5 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.