Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 1919 Queen St E
1919 Queen St E is on a 8.5 m by 32.4 m lot on Queen St E in The Beaches. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one.
The City has 15 records on this lot since 1981. That is more than at 99% of Toronto houses. In 2018, a building permit was filed: "Install backflow device". Status: closed. In 2017, a building permit was filed: "Proposal for sprinkler, fire alarm and emergency lighting". Status: closed. In 2016, a building permit was filed: "Interior alterations to the main floor west side at 1919 queen st e. - see building permit 16 120597(entire building is day nursery as per previous permit 16…". Status: closed. Nothing on file is open right now.
Within 300 m, 1 development application is open (the tallest up to 6 storeys). Within 300 m, the Committee of Adjustment decided 60 minor variance applications in the last 10 years and approved 92%. The nearest TTC stop is Queen St East at Elmer Ave, a 1-minute walk.
Summary
What the City's records show on this house
- Zoning not in By-law 569-2013Moderate
- 1 development application open within 300 mLowFree check
- 1 City tree in front of this lotLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
City files on this lot
15 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2018-07-09 | Building permit18 176298 | install backflow device | Closed | |
| 2017-06-20 | Building permit17 176428 | Proposal for sprinkler, fire alarm and emergency lighting. | Closed | |
| 2016-11-29 | Building permit16 251897 | Interior alterations to the main floor west side at 1919 Queen St E. - see building permit 16 120597(entire building is day nursery as per previous permit 16 120597 01) | Closed | |
| 2016-08-12 | Building permit16 120597 | Revision #2: Interior alterations to the main floor keeping the tenant space at 1919.Revision - interior alterations to convert 2nd floor into day nursery as per C of A decision #16-122932 | Closed | |
| 2016-07-18 | Building permit16 185765 | Proposal to removal all residential uses located on the 2nd floor (2 dwelling units) from the existing mixed-use building. Change of use to Day Care/Nursery. | Closed | |
| 2016-06-15 | Minor varianceA0264/16TEY | To convert the exising two-storey mixed-use building into a day nursery with rear yard playground. | Approved | |
| 2015-12-11 | Zoning review15 263745 ZZC | No description on file | Closed | |
| 2011-11-09 | Zoning review11 307326 LPR | No description on file | Closed | |
| 2009-01-23 | Zoning review09 104563 LPR | No description on file | Closed | |
| 2008-06-11 | Zoning review08 169115 000 | No description on file | Cancelled | |
| 2008-06-11 | Zoning review08 169118 LPR | No description on file | Closed | |
| 2006-10-10 | Zoning review06 182497 LTO | No description on file | Closed | |
| 1998-04-27 | Zoning review98 026055 LTO | No description on file | Closed | |
| 1986-02-20 | Zoning review86 027904 LTO | No description on file | Closed | |
| 1981-12-30 | Zoning review81 031009 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Zoning not in By-law 569-2013
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
1 City tree in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- No
- Public lane
- None
- House footprint
- 177 m²
- Back yard
- 11.2 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m, up to 6 storeys
- 21 suite and multiplex permits within 300 m in 10 years
- 60 minor variance decisions within 300 m, 92% approved
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
The Beaches neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Woodbine StationNearest station33 min walk
- Queen St East at Elmer AveNearest TTC stop1 min walk
- Woodbine AveNearest cycling route2 min walk
- Kew Beach Jr Public SchoolSchool2 min walk
- Boardwalk Montessori SchoolSchool5 min walk
- Academy of Thought and Industry TorontoSchool7 min walk
- Glen Ames Sr Public SchoolSchool12 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3525.6
- Robberycity median 69.525.2
- Auto theftcity median 192.6164
- Theft over $5,000city median 46.150.5
- Break and entercity median 172.8151.4
- Theft from vehiclescity median 188.1243.9
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist